• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 27 pages
Exam (elaborations)

CM 4211 FINAL EXAM 2026 STUDY GUIDE WITH PRACTICE QUESTIONS

Document preview thumbnail
Preview 3 out of 27 pages

CM 4211 FINAL EXAM 2026 STUDY GUIDE WITH PRACTICE QUESTIONS

Content preview

CM 4211 FINAL EXAM 2026 STUDY GUIDE
WITH PRACTICE QUESTIONS

◉ A cardinal change is one whose size is such that it is clearly within
the general scope of the contract? Answer: false


◉ A two-part change provision means that measureable costs will
be paid as incurred, with final adjustments, such as profit and
overhead, paid later? Answer: true


◉ Payment for change work is implied? Answer: false


◉ An AIA change order does not require agreement as to
adjustments? Answer: false


◉ On a public project, a cardinal change is a violation of the public
bid laws because it is not what the bidders bid on? Answer: true


◉ Conduct when the work is being performed is called course of
dealing? Answer: false


◉ Changes are one of the five threshold red flag contract provisions?
Answer: true

,◉ Prompt notice by the contactor to the owner of a constructive
change is critical? Answer: true


◉ lecture 20 Answer: lecture 20


◉ One of the stumbling blocks to recovery under a differing site
condition claim is insufficient records to prove the damages?
Answer: true


◉ An owner notified of a differing site condition must immediately
investigate? Answer: true


◉ Differing site conditions are a threshold red flag contract
provision Answer: true


◉ A differing site condition is an implied provision? Answer: false


◉ A Type I differing site condition is one that is materially different
than one usually encountered on that type of project? Answer: false


◉ Differing site conditions are not found in the AIA A201 General
Conditions index as "differing site conditions? Answer: true

, ◉ In the absence of a differing site condition provision, the
contractor can try using breach of contract by the owner of an
implied warranty? Answer: true


◉ In the absence of a differing site condition provision, the
contractor can try using failure to disclose superior knowledge by
the owner? Answer: true


◉ In the absence of a differing site condition provision, the
contractor can try using misrepresentation by the owner? Answer:
true


◉ If during a pre-bid inspection of the jobsite a contractor discovers
a differing site condition, the contractor is obligated to inform the
owner? Answer: true


◉ It is the contractor that decides how to remedy a differing site
condition? Answer: false


◉ If a contract has a differing site condition clause, the contractor
does not need to do a pre-bid inspection of the jobsite? Answer: false


◉ An exculpatory clause relieving an owner of liability always
applies in preference to a differing site condition provision? Answer:
false

Document information

Uploaded on
January 10, 2026
Number of pages
27
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GradeGalaxy
4.3
(16)
Sold
190
Followers
5
Items
59714
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions