• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 16 pages
Exam (elaborations)

Becc Mod 2 2026 Exam Prep Script Full Question Set Approved

Document preview thumbnail
Preview 3 out of 16 pages

BECC MOD 2 2026 EXAM PREP SCRIPT FULL QUESTION SET APPROVED

Content preview

BECC MOD 2 2026 EXAM PREP SCRIPT FULL
QUESTION SET APPROVED

◉ How long are operational logs maintained for? Answer: 6 months


◉ what is the record where all speed changes for each individual
shaft are recorded? Answer: bell book


◉ what log is maintained in dc central Answer: damage control
closure log


◉ What log records day to day events in the engineering plant
Answer: the engineering log


◉ responsible for physical security of the main reduction gear?
Answer: engineer officer


◉ watch fire and flooding get reported to Answer: sounding and
security watch


◉ in port watch in charge of physical security of the ship and takes
control of security forces Answer: CDO

,◉ What program is used to safeguard the ship from sabotage?
Answer: physical security program


◉ What device is a positive stop used to prevent inadvertent
manipulation? Answer: a locking device


◉ the use of EOSS is Answer: mandatory


◉ What are the 3 parts of an EOSS? Answer: the EOSS users guide,
EOP, EOCC


◉ What 2 actions of the EOCC that must be memorized Answer:
controlling and immediate actions


◉ 4 actions EOCC Answer: controlling, immediate, supplementary,
restore casualty


◉ used to alert personnel to an action that if not strictly adhered to
may result in injury to personnel Answer: warning


◉ who uses master plant procedures Answer: EOOW, OOD, SPACE
SUPERVISOR

, ◉ table that displays proper valve alignment for various tanks
Answer: tank tables


◉ What part of EOP provides tank capacities Answer: tank status
diagram


◉ What document provides standardized procedures tailored to
each ship Answer: EOSS


◉ What chart helps keep track of what equipment is on line Answer:
status chart


◉ why is oil in bilges considered hazardous Answer: generate
vapors that can ignite with a spark or open flame


◉ parts per million of oily waste that is sufficient to cause a sheen
Answer: 15-20


◉ Mark 2 spill kit location Answer: main deck


◉ complete discontinuation of all discharges of oily waste Answer:
OPA

Document information

Uploaded on
January 9, 2026
Number of pages
16
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GradeGalaxy
4.3
(20)
Sold
240
Followers
6
Items
70320
Last sold
19 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions