Questions And Correct Answers
\Q\.A full lot of super pave asphalt is what size?
1,000 tons
1,000 to 2000 tons
2000 to 4000 tons
1 days production - ANSWERS✔-2000 to 4000 tons
\Q\.Which is not typically used as an asphalt binder in fdot mix designs?
PG 52-28
PG 58-22
PG 62-22
PG 76-22(PMA)
PG 82-22 (PMA) - ANSWERS✔-PG 62-22
\Q\.Who cuts the density cores used for verification testing?
The verification technician
The contractor
The independent verification testing technician
None of the above - ANSWERS✔-The contractor
\Q\.A full lot is composed of 5 sublots and 4 cores per lot T/F - ANSWERS✔-False
, \Q\.What is the most important for consistent compaction of asphalt mix?
The mix is hotter in temperature
The mix is colder in temperature
The mix is uniform in temperature
Temperature of the mix does not affect compaction - ANSWERS✔-The mix is uniform in
temperature
\Q\.Referring to general stationing guidelines, R1 would be ____ than R2
Closer to centerline
Closer to outside shoulder
Closure to the inside shoulder
Both A and C - ANSWERS✔-Both A and C
\Q\.While using the rolling straightedge, if the needle goes in the red zone indicating an
unacceptable high spot in the section, you then - ANSWERS✔-Mark the pavement where the
needle first goes into the red zone and place another mark where the needle leaves the red
zone and continue
\Q\.For bridge approach slabs, the 15 foot manual straightedge should be set so ____ is on the
bridge deck.
1 inch
Exactly 1/2 of the straightedge
The entire straightedge
None of the above - ANSWERS✔-1 inch
\Q\.For the first transverse joint on a project place the ___ on the new pavement while
overlapping the transverse joint by one inch.