Earthwork is the construction work necessary to produce roadbeds of the proper:
- grade
-alignment
-shape and density
- all of the above - all of the above
which of the following does not need to be done before earthwork operations begin
-removal of obstructions
-compaction of embankements
-installation of traffic control devices
-clearing and grubbing -compaction of embankements
preconstruction conferences are required
personnel from the ___, ___, and ___ should be present at the preconstruction conference
FDOT, contractor, and utilities
May other interested parties also attend the preconstruction conference? yes
Which of the following are usual topics of discussion at preconstruction conferences?
The project plan and special provision requirements
Lines of communication and traffic control
, The Contractor's work plan and schedule of operation
All of the above All of the above
Who should you look to for information about the issues discussed at the preconstruction
conference
Project Engineer/Administrator
Chief Field Engineer
Either of the above
None of the above Either of the Above
Who presents the erosion control plan to the preconstruction conference? Must this plan meet
the engineer's approval? contractor, yes
Who is responsible for making the arrangements for maintaining traffic the contractor
All signs and warning devices should be installed according to the Manual on Uniform
Control Traffic Devices
WHich traffic control feature should be checked daily?
condition of signs
flashing and steady burning lights
roadway conditions
all of the above all of the above
Experts
Earthwork is the construction work necessary to produce roadbeds of the proper:
- grade
-alignment
-shape and density
- all of the above - all of the above
which of the following does not need to be done before earthwork operations begin
-removal of obstructions
-compaction of embankements
-installation of traffic control devices
-clearing and grubbing -compaction of embankements
preconstruction conferences are required
personnel from the ___, ___, and ___ should be present at the preconstruction conference
FDOT, contractor, and utilities
May other interested parties also attend the preconstruction conference? yes
Which of the following are usual topics of discussion at preconstruction conferences?
The project plan and special provision requirements
Lines of communication and traffic control
, The Contractor's work plan and schedule of operation
All of the above All of the above
Who should you look to for information about the issues discussed at the preconstruction
conference
Project Engineer/Administrator
Chief Field Engineer
Either of the above
None of the above Either of the Above
Who presents the erosion control plan to the preconstruction conference? Must this plan meet
the engineer's approval? contractor, yes
Who is responsible for making the arrangements for maintaining traffic the contractor
All signs and warning devices should be installed according to the Manual on Uniform
Control Traffic Devices
WHich traffic control feature should be checked daily?
condition of signs
flashing and steady burning lights
roadway conditions
all of the above all of the above