1.Roof Penetration (inches): Minimum - 3"
Stack is "3 = 4"
Stack is 6" = 8"
2.Nominally Vertical: 44 degree,
the remainder is horizontal
3.Minimum Trap arm for Acid or Glass (inches): 2"
4.Kitchen Sink minimum and maximum: Min - 2 pipe diameter
Max - 5 feet
5.Floor Drain Minimum (inches): 2" - but usualy 3"
6.Water Closet minimum and maximum: Min - 2 pipe diameter
Max - 1 meter down
5 meters across
7.Trap Seal Depth (inches): 1 1/2"
8.Terminal (ft/sec): 10ft / per second
9.1.) 1 meter
2.) 3 meter: How many meters for the spots
indicated
10. Backfill of a Trench in millimetres: • 300 millimetre over the top of the pipe • 75
millimetre of concrete above the pipe, minimum.
11. Lav Sink (inches): 1 1/4"
12. Public Sewer (inches): 4"
13. Minimum Grade 3" and down: 2% - 2/100 - 1/4" per foot
14. Maximum water temperature you can pour down drain.: 170 degrees Fahrenheit
15. Hot water tank temperature: 140 degrees Fahrenheit
16. Bathtub / shower temperature: 120 degrees Fahrenheit
17. Bath Trap Arm (inches): 1 1/2"
18. Stack Vent (inches): 3"
19. Roof Increaser (inches): 3"
20. Minimum Grade 4" and Up: 1% - 1/100 - 1/8" per foot
21. Acid Trap (inches): 2"