True or False: If you have a project with more than one building or area, you should enable
the "Drawings by Area" feature.. ANSWER -True
True or False: It's important to discuss best practices in formatting your drawings with the
design Team to ensure that the drawings are seamlessly processed in Procore.. ANSWER -
True
True or False: When you click a project's Drawings tool in the Procore web app, you should
expect to see the project's "current set" of drawings. (i.e. The most recently uploaded
revision of each drawing.). ANSWER -True
How can you draw a straight line while marking up your drawing?. ANSWER -Hold shift
key when drawing a line
Who can view drawing markups on your 'Personal' layer?. ANSWER -Only You
True or False: When you add a markup to a drawing, any markups will be immediately
available to your team without further action on your part.. ANSWER -False
True or False: You can now have your Design Team upload drawings directly to the
Drawings tool without having the drawings be published immediately.. ANSWER -True
You should upload shop drawings to Procore's Drawings tool.. ANSWER -False
True or False: Procore automatically sends an email to users with 'Admin' permissions on
the Drawings tool when new drawings have been uploaded and are ready to be reviewed
and published.. ANSWER -True
, What is an important best practice you should communicate to the Design Team about the
formatting of the spec book?
a. The table of contents should be in the first 25 pages of the spec book
b. The spec section number and description should be in the header and footer of every page
c. There shouldn't be any other string of numbers that looks like a spec section number in
the header and footer of the page (e.g. a project ID)
d. All of the above. ANSWER -d. All of the above
True or False: Before you publish your spec book to the team, you should make sure there's
a break between every spec section.. ANSWER -True
True or False: To upload a revision to your spec book, you will first need to delete the old
version from Procore.. ANSWER -False
Why are some action buttons inactive and gray?
a. Because the action is no longer supported by Procore's application
b. Because an 'Admin' user manually disabled the action
c. Because certain actions require that you first select one or more spec sections before the
button becomes active and orange (i.e. clickable)
d. Because another user has already performed that action. ANSWER -c. Because certain
actions require that you first select one or more spec sections before the button becomes
active and orange (i.e. clickable)
True or False: When you delete a specification from the Specifications list page, you will
delete the specification and all of its revisions.. ANSWER -False
In Procore, what does it mean if a field has a blue caret in the top corner of the cell?
a. The field is editable in-line
b. The field has been marked for review by a 'Standard' level user
c. The item is overdue
d. The item has a comment attached to it. ANSWER -a. The field is editable in-line
Question 7 of 10
Quizzes With Complete Solutions Graded A+
QUESTIONS AND ANSWERS
True or False: If you have a project with more than one building or area, you should enable
the "Drawings by Area" feature.. ANSWER -True
True or False: It's important to discuss best practices in formatting your drawings with the
design Team to ensure that the drawings are seamlessly processed in Procore.. ANSWER -
True
True or False: When you click a project's Drawings tool in the Procore web app, you should
expect to see the project's "current set" of drawings. (i.e. The most recently uploaded
revision of each drawing.). ANSWER -True
How can you draw a straight line while marking up your drawing?. ANSWER -Hold shift
key when drawing a line
Who can view drawing markups on your 'Personal' layer?. ANSWER -Only You
True or False: When you add a markup to a drawing, any markups will be immediately
available to your team without further action on your part.. ANSWER -False
True or False: You can now have your Design Team upload drawings directly to the
Drawings tool without having the drawings be published immediately.. ANSWER -True
You should upload shop drawings to Procore's Drawings tool.. ANSWER -False
True or False: Procore automatically sends an email to users with 'Admin' permissions on
the Drawings tool when new drawings have been uploaded and are ready to be reviewed
and published.. ANSWER -True
, What is an important best practice you should communicate to the Design Team about the
formatting of the spec book?
a. The table of contents should be in the first 25 pages of the spec book
b. The spec section number and description should be in the header and footer of every page
c. There shouldn't be any other string of numbers that looks like a spec section number in
the header and footer of the page (e.g. a project ID)
d. All of the above. ANSWER -d. All of the above
True or False: Before you publish your spec book to the team, you should make sure there's
a break between every spec section.. ANSWER -True
True or False: To upload a revision to your spec book, you will first need to delete the old
version from Procore.. ANSWER -False
Why are some action buttons inactive and gray?
a. Because the action is no longer supported by Procore's application
b. Because an 'Admin' user manually disabled the action
c. Because certain actions require that you first select one or more spec sections before the
button becomes active and orange (i.e. clickable)
d. Because another user has already performed that action. ANSWER -c. Because certain
actions require that you first select one or more spec sections before the button becomes
active and orange (i.e. clickable)
True or False: When you delete a specification from the Specifications list page, you will
delete the specification and all of its revisions.. ANSWER -False
In Procore, what does it mean if a field has a blue caret in the top corner of the cell?
a. The field is editable in-line
b. The field has been marked for review by a 'Standard' level user
c. The item is overdue
d. The item has a comment attached to it. ANSWER -a. The field is editable in-line