100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Summary

Summary 3OPS IO2

Rating
-
Sold
-
Pages
17
Uploaded on
02-03-2021
Written in
2019/2020

The complete report with the final mark 7.0.

Institution
Course










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Study
Course

Document information

Uploaded on
March 2, 2021
Number of pages
17
Written in
2019/2020
Type
Summary

Subjects

Content preview

Aviation Studies

Report template Assignment 2
Terminal capacity
Thema 3OPS




Name & Surname (Student number) Group: FT_AV1A-01
Shereen Macnack (500808090)

Name & Surname (Student number) Group: FT_AV1A-01

Marshall Sims (500815383)

,Contents

CONTENTS 2

PREFACE 3

1. CURRENT TERMINAL CAPACITY 4

2. ACTUAL PEAK HOUR LEVEL OF SERVICE 5

3. FORECAST & TERMINAL EXPANSION 7

4. EXPANSION PROPOSAL 9

5. BIBLIOGRAPHY 10

6. APPENDICES 11




Domein Techniek
Hogeschool van Amsterdam
2

, Preface

The aviation industry is a fast-growing industry. Therefore, the number of passengers at the airport is also
growing. In this report the chosen airport Paris Orly Airport in IO1 will be further developed.

The main question that will be researched is: Does Paris Orly need a terminal expansion to be able to
handle the passenger capacity in the future?

We try to answer this question by means of the following concepts:

• The Level of Service (LoS) concept described by IATA will be used. The LoS concept is a guidance
framework for the planning of new terminal facilities.
• Also, the LoS concept is for monitoring the operational service performance of existing facilities. It
specifies the minimum service requirements at various terminal sub-systems such as space
provision and waiting times (IATA, 2015).
• The LoS is expressed in three states:



1. Overdesign: too much space per PAX (empty space) and/or overprovision of resources

2. Optimum: sufficient space to accommodate and/or acceptable processing and waiting times

3. Sub-optimum: crowded and uncomfortable and/or unacceptable processing and waiting times



At the end of this report an expansion proposal will be written for Paris Orly Airport so that the airport will
be able to handle the passenger growth.




Domein Techniek
Hogeschool van Amsterdam
3

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
shereenmacnack Hogeschool van Amsterdam
Follow You need to be logged in order to follow users or courses
Sold
13
Member since
6 year
Number of followers
11
Documents
12
Last sold
3 year ago

3.0

4 reviews

5
1
4
0
3
2
2
0
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions