demolition plan ✅ANSWER
often overlaid the existing conditions plan and shows items to be demolished,
removed, relocated, or transplanted in order to prepare for new construction
demo plans show which utilities ANSWER
electrical, gas, oil, stream, communication lines, water, sewer, etc
first stage of demo ✅ANSWER
construction fences installed around perimeter of the project prior to moving to
site construction, including areas of staging and storage
materials no longer needed re: demo ✅ANSWER
broken down and removed, when possible, reuse or recycle
topsoil re: demo ✅ANSWER
excavated, stored, and reused (4"-6" top layer)
what to do with utilities re: demo verify ✅ANSWER
locations and carefully protect
pg. 1
, SWPPP Questions and Answers Verified by Expert
Question & Answers Perfectly A+ Grade (2026 Newest
Updated Versions) lOMoAR cPSD| 22962964
hand excavation re: demo ✅ANSWER
specify where needed (around trees, utilities, foundations, etc.)
steps for demo plan/construction ✅ANSWER
1. preliminary surveying
2. tree protection and erosion control
3. cleaning, grubbing, and demo
4. topsoil stripping and stockpiling for future use
site preparation for demo ✅ANSWER
site cleaning - organic matter must be cleared and grubbed from the construction
zone. topsoil is typically stripped 4"-6" and stockpiled. The limit of work line is
stated to establish the disturbed area perimeter
limit of work line ✅ANSWER
establishes the area perimeter within which all contract work is to occur
no cut - no fill line ✅ANSWER
demarcates the point where all grade changes are to blend into the existing
undisturbed site
pg. 2
Question & Answers Perfectly A+ Grade (2026 Newest
Updated Versions)
SWPPP Questions and Answers Verified by Expert
Question & Answers Perfectly A+ Grade (2026 Newest
Updated Versions)
demolition plan ✅ANSWER
often overlaid the existing conditions plan and shows items to be demolished,
removed, relocated, or transplanted in order to prepare for new construction
demo plans show which utilities ANSWER
electrical, gas, oil, stream, communication lines, water, sewer, etc
first stage of demo ✅ANSWER
construction fences installed around perimeter of the project prior to moving to
site construction, including areas of staging and storage
materials no longer needed re: demo ✅ANSWER
broken down and removed, when possible, reuse or recycle
topsoil re: demo ✅ANSWER
excavated, stored, and reused (4"-6" top layer)
what to do with utilities re: demo verify ✅ANSWER
locations and carefully protect
pg. 1
, SWPPP Questions and Answers Verified by Expert
Question & Answers Perfectly A+ Grade (2026 Newest
Updated Versions) lOMoAR cPSD| 22962964
hand excavation re: demo ✅ANSWER
specify where needed (around trees, utilities, foundations, etc.)
steps for demo plan/construction ✅ANSWER
1. preliminary surveying
2. tree protection and erosion control
3. cleaning, grubbing, and demo
4. topsoil stripping and stockpiling for future use
site preparation for demo ✅ANSWER
site cleaning - organic matter must be cleared and grubbed from the construction
zone. topsoil is typically stripped 4"-6" and stockpiled. The limit of work line is
stated to establish the disturbed area perimeter
limit of work line ✅ANSWER
establishes the area perimeter within which all contract work is to occur
no cut - no fill line ✅ANSWER
demarcates the point where all grade changes are to blend into the existing
undisturbed site