Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 19 pages
Exam (elaborations)

SWPPP Stormwater EPA 98 Questions and Answers Verified by Expert latest Update 2026.pdf

Document preview thumbnail
Preview 3 out of 19 pages

SWPPP Stormwater EPA 98 Questions and Answers Verified by Expert latest Update

Content preview

SWPPP Stormwater EPA | 98 Questions and Answers
Verified by Expert | latest Update 2026

SWPPP Stormwater EPA | 98 Questions and
Answers Verified by Expert | latest Update 2026

What Generates Stormwater discharge? - ✅ CORRECT ANSWER Discharge is
generated by runoff from land and impervious areas such as paved streets, parking
lots, and building rooftops during rainfall and snow events that often contain
pollutants in quantities that could adversely affect water quality.


Types of Stormwater Sampling - ✅ CORRECT ANSWER Catch Basin
Sampling, Ditch Sampling, Sheet Flow Sampling


Where to sample - ✅ CORRECT ANSWER Pipes (catch basin or outfall),
Open Ditch or a sheet flow. Stormwater discharge is representative of your wholes
sites pollution. Sampling sites must be noted on permit site map


Tools needed for sampling - ✅ CORRECT ANSWER Bottle, Gloves, IceBox,
pen, pH paper, and an extension rod.


Things you are sampling for - ✅ CORRECT ANSWER Turbidity(cloudiness),
pH, Total Zn, Total Copper, and Oil Sheen


What pollutants usually sampled for - ✅ CORRECT ANSWER Stormwater
permits require the development of minimum control measures called what?:
MS4’s for stormwater permits and BMPs for industrial stormwater permits




pg. 1

, SWPPP Stormwater EPA | 98 Questions and Answers
Verified by Expert | latest Update 2026


How does stormwater effect construction sites - ✅ CORRECT ANSWER
Stormwater flows over construction sites, picking up pollutants that can then harm
or kill fish/wildlife


NPDES Stormwater Program requires sites of what size sites to obtain
authorization to discharge stormwater? - ✅ CORRECT ANSWER One Acre or
larger


What is the focus of the NPDES Stormwater Permits? - ✅ CORRECT ANSWER
Stormwater Pollution Prevention Plans


EPA Construction General Permit (CGP) - ✅ CORRECT ANSWER Outlines a
set of provisions that construction operators must follow to comply with the
requirements of the NPDES stormwater regulations.


In California who issues NPDES permits for discharges into federal ocean water? -
✅ CORRECT ANSWER EPA


In California what entity handles permits for discharges into non-federal waters? -
✅ CORRECT ANSWER CalEPA


What are the basic requirements of a CGP - ✅ CORRECT ANSWER 1) Read
entire CGP, 2) Develop a Stormwater Pollution Prevention Plan (SWPPP), 3)
Complete and submit a Notice of Intent (NOI), 4) Install and maintain erosion and




pg. 2

, SWPPP Stormwater EPA | 98 Questions and Answers
Verified by Expert | latest Update 2026

sediment controls throughout the entire construction project, 5) Implement
pollution prevention controls, 6) Conduct inspections on the site based on
established timeframe, 7) Take Corrective action to address any issue with your
stormwater controls or discharges, 8) Keep SWPPP up to date, 9) Comply with any
state, requirements, 10) Keep a copy of permit on site, and 11) Submit a notice of
termination once your site is permanently stabilized or control of site has been
transferred to another operator, 12) Retain records for at least 3 years after NOT
Stormwater Pollution Prevention Plan aims to do what? - ✅ CORRECT
ANSWER Serve as a roadmap for how you will control you stormwater
discharges and comply with the permit


Part 1.1.5 and appendix D of the 2017 CGP Requires? - ✅ CORRECT ANSWER
You to determine the eligibility with regard to protection of threatened and
endangered species and designated critical habitat.


Part 1.1.6 and Appendix E of the 2017 CGP Requires? - ✅ CORRECT ANSWER
You to complete the screening process with regard to protection of historic
properties before you submit an NOI for permit coverage.


What size construction sites can apply for a waiver of NPDES permit coverage? -
✅ CORRECT ANSWER Sites that disturb 5 acres or less


What are the three circumstances that small construction sites can apply for permit
waiver? - ✅ CORRECT ANSWER Rainfall erosivity factor of less than five,
Approved or Established Total Maximum Daily Loads (TMDLs) can be shown to




pg. 3

Document information

Uploaded on
January 1, 2026
Number of pages
19
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$10.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
LENNYJAST
3.5
(12)
Sold
102
Followers
35
Items
2808
Last sold
2 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions