1. Testing of the building sewer shall be accomplished with a minimum____ head of water with

the ability to maintain such pressure for a minimum of __________. - 10- foot, 15 minutes

2. When tested by air, the DWV system shall be tested at ____ or 10 inches of mercury column

with the ability to maintain such pressure for a minimum of _______. - 5 pounds, 15 minutes

3. The water- supply system shall be proved tight under a water pressure not less than the

working pressure of the system, or b...