AGC Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about AGC? On this page you'll find 906 study documents about AGC.
Page 3 out of 906 results
Sort by
-
AQAGCSE ENGINEERING 8852/W Unit 1 Written Paper Version: 1.0 Final *JUN238552w01* IB/G/Jun23/E10 8552/W/ QUESTION PAPER & MARKING SCHEME/ [MERGED]
- Exam (elaborations) • 54 pages • 2024
- Available in package deal
-
- $7.99
- + learn more
GCSE 
ENGINEERING 
8852/W 
Unit 1 Written Paper 
Version: 1.0 Final 
*JUN238552w01* 
IB/G/Jun23/E10 8552/W 
For Examiner’s Use 
Section Mark 
A 
B 
C 
TOTAL 
Monday 19 June 2023 Morning Time allowed: 2 hours 
Materials 
For this paper you must have: 
• normal writing and drawing instruments 
• a calculator 
• a protractor. 
Instructions 
• Use black ink or black ball-point pen. Use pencil only for drawing. 
• Fill in the boxes at the top of this page. 
• Answer all questions. 
• ...
-
CMIT 1 Practice Exam Questions With Complete Solutions
- Exam (elaborations) • 31 pages • 2023
-
Available in package deal
-
- $14.99
- + learn more
FAR correct answer: Federal Acquisition Regulations. Regulates acquisition process in public sector projects. 
 
CII correct answer: Construction Industry Institute of the University of Texas 
 
ABET correct answer: Accredidation Board for Engineering and Technology, est 1932 
 
ANSI correct answer: American National Standards Institute, accredited the certificate program in 2006 
 
AGC correct answer: Associated General Contractors of America, est 1918 
 
GSA correct answer: General Servi...
-
NERC Reliability Coordinator Exam Vocabulary 2023/2024 with Complete Solutions
- Exam (elaborations) • 66 pages • 2023
- Available in package deal
-
- $12.99
- + learn more
NERC Reliability Coordinator Exam Vocabulary 2023/2024 with Complete SolutionsNERC Reliability Coordinator Exam Vocabulary 2023/2024 with Complete SolutionsNERC Reliability Coordinator Exam Vocabulary 2023/2024 with Complete Solutions 
 
Accelerating Power - ANSWER-In a GENERATOR, the difference between the MECHANICAL INPUT POWER and the electrical output POWER (assuming no LOSSES). For a GENERATOR's TORQUE ANGLE to change, the GENERATOR must have accelerating POWER. 
 
Accumulated Inadvertent ...
-
NERC SOS Questions with Correct Answers Graded A+
- Exam (elaborations) • 44 pages • 2023
- Available in package deal
-
- $13.49
- + learn more
If a Balancing Authority does not comply with the Control Performance Standard, the Balancing 
Authority is not permitted to provide which of the following for any other Balancing Authority 
entities? -Answer Regulation of other services related to control performance 
1. It is the obligation of each Balancing Authority to fulfill its commitment to the 
Interconnection and not ________ the other balancing Authorities in the Interconnection - 
Answer Burden 
A Balancing Authority is performing Ov...
-
SOS NERC RELIABILITY EXAM QUESTIONS WITH ANSWERS LATEST 2023-2024
- Exam (elaborations) • 69 pages • 2023
- Available in package deal
-
- $16.49
- + learn more
Metered Data included in the calculation of ACE are: dynamic schedules, pseudo 
ties, actual frequency, and all __________. 
A) Tie lines readings 
B) Generators output 
C) Scheduled frequency indications 
SOS NERC RELIABILITY EXAM QUESTIONS & 
ANSWERS LATEST GRADED A+ 
D) Transformer load - A) Tie lines readings 
Balancing Authority A is currently reading a system frequency of 60.00 Hz. Its Net 
Actual Interchange is +100 MW and its Net Scheduled Interchange is +200 MW. If 
Balancing Authority...
Get paid weekly? You can!
-
NERC EXAM QUESTIONS WITH 100% CORRECT AND VERIFIED ANSWERS | LATEST UPDATE GRADED A+
- Exam (elaborations) • 13 pages • 2023
- Available in package deal
-
- $18.49
- + learn more
NERC EXAM QUESTIONS WITH 100% CORRECT AND VERIFIED ANSWERS | LATEST UPDATE GRADED A+. A Balancing Authority notices that Operating Reserve has steadily declined 
throughout the hour. What is the most likely cause? 
a) Loss of a large generator in the area 
b) An inaccurate load forecast 
c) Loss of a major transmission line 
d) A malfunction of EMS - b) An inaccurate load forecast 
Balancing Area A notices that the Interconnection frequency is 59.94 Hz and their 
ACE is 0. Which of the following...
-
Sos Nerc Prep - Reliability Exam With 100 Questions with Correct Answers.
- Exam (elaborations) • 54 pages • 2023
-
- $12.99
- + learn more
Sos Nerc Prep - Reliability Exam With 100 Questions with Correct Answers. 
The Reliability Coordinator just informed you of a slow time error correction which will 
begin at the top of the next hour. Your EMS system will not let you change your 
scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action 
should you take? 
A) Increase Net Interchange Schedule by 20 MWs. 
B) Inform the Reliability Coordinator that you cannot participate in the time error 
correction. 
C) Decreas...
-
NERC FINAL EXAM QUESTIONS WITH 100% CORRECT ANSWERS LATEST UPDATE GRADED A+
- Exam (elaborations) • 13 pages • 2023
- Available in package deal
-
- $17.99
- + learn more
Balancing Area A notices that the Interconnection frequency is 59.94 Hz and their 
ACE is 0. Which of the following could be the cause of this reading? 
a) A net under-generation in Balancing Area A 
b) A net under-generation in the Interconnection 
c) A loss of load in Balancing Area A 
d) A loss of load in the Interconnection - b) A net under-generation in the 
Interconnection 
What is the penalty for a Balancing Authority violating the Disturbance Control 
Standard? 
a) Must carry additional ...
-
NERC Certification Practice Questions with Complete Solutions
- Exam (elaborations) • 7 pages • 2023
- Available in package deal
-
- $7.99
- + learn more
A Balancing Authority notices that Operating Reserve has steadily declined throughout 
the hour. What is the most likely cause? 
a) Loss of a large generator in the area 
b) An inaccurate load forecast 
c) Loss of a major transmission line 
d) A malfunction of EMS -Answer b) An inaccurate load forecast 
Balancing Area A notices that the Interconnection frequency is 59.94 Hz and their ACE 
is 0. Which of the following could be the cause of this reading? 
a) A net under-generation in Balancing Are...
-
NERC RELIABILITY EXAM QUESTIONS WITH ANSWERS LATEST 2023-2024 SCORE A+
- Exam (elaborations) • 69 pages • 2023
- Available in package deal
-
- $14.99
- + learn more
NERC RELIABILITY EXAM QUESTIONS WITH ANSWERS LATEST SCORE A+. Metered Data included in the calculation of ACE are: dynamic schedules, pseudo 
ties, actual frequency, and all __________. 
A) Tie lines readings 
B) Generators output 
C) Scheduled frequency indications 
SOS NERC RELIABILITY EXAM QUESTIONS & 
ANSWERS LATEST GRADED A+ 
D) Transformer load - A) Tie lines readings 
Balancing Authority A is currently reading a system frequency of 60.00 Hz. Its Net 
Actual Interchange is +100 MW and it...
That summary you just bought made someone very happy. Also get paid weekly? Sell your study resources on Stuvia! Discover all about earning on Stuvia