- Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about ? On this page you'll find 2 study documents about .
2 results
Exam (elaborations)
Nccco Mobile Crane 2024 – 2025 Latest Update With All Questions And Correct Answers Graded A+
NCCCO MOBILE CRANE 2024 – 2025 LATEST UPDATE WITH ALL QUESTIONS AND CORRECT ANSWERS GRADED A+ 
A long boom crane at a short radius and out of level by 300 can see a reduction incapacity by as much as: - ANSWER-50% 
A multi crane lift shall require - ANSWER-Critical lift plan, reduction of gross capacity by 25% and one designated person in charge. 
A signal person shall be ________________. - ANSWER-designated person, tested 
According to ANSI B30.5, hand signal chart shall be posted where? - A...
Exam (elaborations)
NCCCO MOBILE CRANE Questions and Correct Answers | Latest Update
PopularWhat action does a signal person intend the operator to perform if he extends his arm at 
shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom 
 c. 
2. When hoisting personnel, within what percentage of level must a telescopic boom crane be 
in order for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8% 
 a. 
3. The load line of the crane you're operating contacts an energized po...