Popular courses 'NCCCO Core' at NCCCO Core
NCCCO Core Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about NCCCO Core? On this page you'll find 79 study documents about NCCCO Core.
All 79 results
Sort by
-
NCCCO CORE EXAM 2024-2025 ACTUAL EXAM 170+ QUESTIONS AND CORRECT DETAILED ANSWERS |ALREADY GRADED A+ LATEST
- Exam (elaborations) • 16 pages • 2024
- Available in package deal
-
- $14.99
- 1x sold
- + learn more
NCCCO CORE EXAM ACTUAL EXAM 170+ 
QUESTIONS AND CORRECT DETAILED ANSWERS |ALREADY 
GRADED A+ LATEST
-
NCCCO CORE/NCCCO OVERHEAD CRANE/NCCCO TOWER CRANE /NCCCO MOBILE CRANE ALL EXAMS BUNDLE
- Package deal • 4 items • 2024
-
- $24.39
- 1x sold
- + learn more

Exam (elaborations)
NCCCO OVERHEAD CRANE EXAM / NCCCO OVERHEAD CRANE STUDY GUIDE/ NCCCO OVERHEAD CRANE PRACTICE QUESTIONS REAL |180+ QUESTIONS AND CORRECT ANSWERS |AGRADE

2
Exam (elaborations)
NCCCO TOWER CRANE EXAM 2024-2025 LATEST ACTUAL EXAM 150+ QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A

3
Exam (elaborations)
-
Nccco Core Exam Questions With All Answers
- Exam (elaborations) • 21 pages • 2024
-
- $9.89
- + learn more
Nccco Core Exam Questions With All 
Answers 
 
If taking sides strain on a boom what concerns the operator the most - ANSWER- Boom 
damage 
If a crane load chart has capacities listed in the shaded area this means that - 
ANSWER- If overloaded structural confidence will be compromised 
As the layers of rope on a drum increase the allowable line Pull wil - ANSWERDecrease 
Of the following actions which one will most likely cause a side load condition - 
ANSWER- Abruptly starting or stopping the s...
-
NCCCO CORE 2024 TEST QUESTIONS ALL ANSWERED
- Exam (elaborations) • 9 pages • 2024
-
- $9.29
- + learn more
NCCCO CORE 2024 TEST QUESTIONS 
ALL ANSWERED 
 
Before leveling a mobile crane on outriggers, an operator should ensure: - ANSWERthere is no weight of the crane bearing on any tires 
Operating a mobile crane with a long boom, on uneven ground, what support condition 
should be considered? - ANSWER- Keeping 90 degree angle between cylinder rod and 
pad 
What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - 
ANSWER- Separate the boom hoist lines 
How many randomly brok...
-
NCCCO CORE Exam Answers All Correct
- Exam (elaborations) • 6 pages • 2024
-
- $8.99
- + learn more
NCCCO CORE Exam Answers All 
Correct 
 
What is prohibited by OSHA 1926 Subpart cc regarding wire rope on a crane? - 
ANSWER- Splicing 
What should be of major concern when considering surfaces for crane set up locations? 
- ANSWER- Voids, tanks, loose fill, depressions 
Which items are included in the suspended weight when calculating parts of line? - 
ANSWER- Load weight, rigging, load block 
What site condition must an operator be concerned about prior to setting up a crane? - 
ANSWER- Soil s...
As you read this, a fellow student has made another $4.70
-
NCCCO Core Exam Marking Scheme Updated
- Exam (elaborations) • 11 pages • 2024
-
- $9.69
- + learn more
NCCCO Core Exam Marking Scheme 
Updated 
 
Which of the following is an accurate statement about luffing jibs? - ANSWER- It raises 
and lowers independent from the boom 
What is the weakest quadrant of a boom truck? - ANSWER- Front 
What effect would blocking up the ends of the tracks have on a crane? - ANSWER- It 
would increase capacity over the ends 
The tipping axis of a crawler crane is? - ANSWER- It depends if the idler or sprocket are 
offset from track rollers 
According to ASME B30.5 wh...
-
Nccco core study guide 100%verified
- Exam (elaborations) • 5 pages • 2024
-
- $13.49
- + learn more
Boom up - What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
 
1% - When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? 
 
Stay in the cab until the lines are de-energized - The load line of the crane you're operating contacts an energized power line. There's no sign of any other d...
-
NCCCO CORE including tables
- Exam (elaborations) • 15 pages • 2024
-
- $12.49
- + learn more
TT 345-750V - 16ft TT 
 
TA 500-750V - 35ft TA 
 
TT 50-345V - 10ft TT 
 
TA 750-1000V - 45ft TA 
 
TA 50-200V - 15ft TA 
 
TA 350-500V - 25ft TA 
 
TT ft TT 
 
TT .01-.75 - 4ft TT 
 
TA 200-350V - 20ft TA 
 
TA up to 50V - 10ft TA 
 
TT .75-50V - 6ft TT 
 
How many electrocution hazard warnings must be displayed - 1 in cab 2 outside 
 
Using Running wire rope, ________ randomly distributed broken wires in ________ rope lay - 6-1 
 
________ broken wires in one STRAND in______ rope lay - 3-1 
 
...
-
NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT)
- Exam (elaborations) • 13 pages • 2024
- Available in package deal
-
- $13.99
- + learn more
NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT) Before leveling a mobile crane on outriggers, an operator should ensure: - ANSWER there is 
no weight of the crane bearing on any tires 
Operating a mobile crane with a long boom, on uneven ground, what support condition 
should be considered? - ANSWER Keeping 90 degree angle between cylinder rod and pad 
What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - ANSWER 
Separate the boom h...
-
NCCCO CORE + SPECIALTY TEST PREP
- Other • 9 pages • 2024
-
- $12.49
- + learn more
NCCCO CORE + SPECIALTY TEST PREP
-
NCCCO CORE EXAM
- Other • 7 pages • 2024
-
- $12.69
- + learn more
-
NCCCO CORE SAMPLE TEST QUESTION
- Exam (elaborations) • 9 pages • 2024
-
- $12.49
- + learn more
NCCCO CORE SAMPLE TEST QUESTION
How did he do that? By selling his study resources on Stuvia. Try it yourself! Discover all about earning on Stuvia