Exam (elaborations)
Estimating Quizzes Certification Exam Questions With Correct Detailed Answers.
What type of estimate is prepared by multiplying the square footage of a building by a cost per square foot? - correct answer Square-foot Estimate 
 
By taking off building elements in broad groups, this type of estimate can be prepared fairly quickly (in hours) with moderate accuracy: - correct answer Assembly Estimate 
 
Which of the following is NOT a component of a detailed estimate? - correct answer A/E Fee 
 
What is the formula for using location factors to adjust cost esti...
Exam (elaborations)
Maths - Estimation Exam With Correct Actual Questions And Answers.
PopularWhat is an estimate? - correct answer An approximation of a number based on reasonable assumptions 
 
When a questions says 'round to ..... decimal places', what does it mean? - correct answer The expected amount of decimal places in the answer 
 
What are significant figures (sig figs)? - correct answer Numbers used in measurement to determine precision of your measurement. Record all certain numbers and one uncertain number. 
 
When a questions says 'round to ....... si...
Exam (elaborations)
Estimating 1 Exam 1 Questions With Correct Verified Answers.
types of construction projects - correct answer -Residential 
-Commercial and institutional buildings* 
-Heavy civil 
-Industrial 
 
"Aquisition process" - correct answer Refferes to finding and biding jobs 
 
AACE definition of cost estimating - correct answer ". . . a predictive process used to quantify, cost, and price the resources required by the scope of an investment option, activity, or project." 
 
" . . . a process used to predict uncertain future costs. I...
Exam (elaborations)
Construction Estimating Exam 1 Questions And Answers Success Guaranteed.
What are the 3 types of estimates - correct answer 1.) Conceptual 
 
2.) Preliminary 
 
3.) Detailed 
 
Advantages of Design-Bid-Build - correct answer Fully defined scope before bidding (Lowest bidding, competitive) 
 
Familiarity with Process 
 
The Design engineers/architects act asthe owner's agent during construction and Polices the General Contractor 
 
Estimating Needs for Design Bid Build (DBB) - correct answer Accurate Detailed estimates from completed documents 
 
Con...
Exam (elaborations)
Estimating Quiz 1 Questions And Correct Detailed Answers.
We put together estimates everyday, with little or no calculations - correct answer True 
 
The different project delivery systems use the same types of estimates- conceptual, preliminary and detailed- at various stages in the development of a project - correct answer False 
 
With the design- build method, the owner indicates that he or she requires a certain facility and usually outlines some parameters relating to location, size, design and the desired time of occupancy. - correct a...
Exam (elaborations)
Rounding and estimating Comprehensive Test Questions And Answers.
Round 1,250 to the nearest hundred - correct answer 1,300 
 
Round 23.567 to the nearest tenth - correct answer 23.6 
 
Round 675.247 to the nearest hundredth - correct answer 675.25 
 
When there is a 5 in a number that you need to round what do you do? - correct answer Round up 
 
Is 1567 closer to 2000 or 1500? - correct answer 1500 
 
What is the place value of 9 in the number 1,234,567.89? - correct answer hundredths 
 
What is the place value of 2 in the numbe...
Exam (elaborations)
BT 4: Estimating and Quantity Surveying Questions And Answers 100% Correct Verified Answers.
Estimates - correct answer Approximation, projection or prediction of a quantity of work 
 
Detailed estimate of Construction Cost - correct answer forecast of construction cost prepared based on a detailed analysis of materials and labor for all items of work, as contrasted with an estimate based on current area, volume or similar unit costs 
 
Bill of Materials - correct answer Used to describe the materials, sub-components needed to manufacture a finished product 
 
Quantity su...
Exam (elaborations)
Planning and Estimating Actual Review Exam Questions With 100% Verified Correct Answers.
The components of an assembly may be limited to a single trade or may be installed by many different trades. - correct answer True 
 
The assembly and square-foot methods are typically used for preparing detailed estimates. - correct answer False 
 
When preparing a conceptual estimate, typically there are no drawings available or they drawings are very limited and the contractor makes assumptions about virtually every aspect of the project. - correct answer True 
 
Project compar...
Exam (elaborations)
quiz -estimation Questions With Correct Detailed Answers.
estimation is an _____ process - correct answer inferential 
 
estimation uses ___ statistics to estimate population parameters - correct answer sample 
 
point estimate uses ______ number to estimate unknown quantity - correct answer single 
 
point estimate is a ______ estimate - correct answer precise 
 
point estimate is not very ____ - correct answer accurate 
 
interval estimate uses _______ to estimate unknown quantity - correct answer ranges of values 
 
int...
Exam (elaborations)
Estimation Exam Complete Exam Questions And Answers Guaranteed Pass.
an inferential technique of using sample statistics to estimate a population parameter - correct answer what is estimation? 
 
point estimate is taking a single value from the sample and using it to estimate the population parameter. the problem is that sampling error varies from point to point, so we can never know how accurate it is - correct answer what is point estimate and what is the major problem with it? 
 
a range of values that are used to estimate the population parameter - ...
Exam (elaborations)
Estimating Comprehensive Exam Questions With Correct Detailed Answers.
Estimating - correct answer a. The key to a successfully conceived, managed, and completed 
project. 
b. Is not limited to the construction industry, but rather is a function 
common to a broad spectrum of projects in which cost and time 
must be managed. 
c. The estimate is the yardstick against which cost performance on a 
project is measured. 
i. Since time affects cost, the estimate of durations is also 
important and is usually considered con-currently with cost. 
 
Estimating -...