Tentamen (uitwerkingen)
CNST 2341 fInal Questions With 100% Correct Answers!!
`serve as one point of responsibility to who? - the owner 
`The 3 method of payment are ? - 1. Lump Sum 
2. Unit price 
3. Cost Plus 
`total float or simply "float" is also referred to as a what - "slack" 
`With OCIPs and CCIPs the disadvantages of the programs includes what? - increased 
administration burden by the owner or contractor 
`With Sole Proprietorship type of business entity, any debt that exceeds the company's assets must 
what? - Be paid for with private the owner. 
A certifi...
Tentamen (uitwerkingen)
CNST 2341 Final || with A+ Guaranteed Solutions.
Populair3 methods of payment common in the construction industry correct answers - Lump sum 
- Unit price 
- Cost plus 
Most common 
 
Lump sum correct answers a single payment made at a particular time 
 
Unit Price correct answers the cost per unit. 
Mostly used between contractor and subcontractor 
 
Cost Plus correct answers A contract where payment is for material and labor, with a profit factor added. 
Used when you are uncertain what the price will be. 
Renovation 
 
Methods to deliver a projec...
Tentamen (uitwerkingen)
CNST 2341 - Final Exam Concepts || with Errorless Solutions 100%.
Indemnify Law and Legal Definition correct answers To indemnify means to reimburse another for a loss suffered because of a third party's or one's own act or default. It can also refer to a promise to reimburse another for such a loss or to give another security against such a loss. The right to indemnity and the duty to indemnify commonly comes from a contractual agreement, which generally protects against liability, loss, or damage. 
 
patent defect correct answers an obvious flaw in a produ...
Tentamen (uitwerkingen)
CNST 2341 mod 1 || A Verified A+ Pass.
Five bases common to classifying contracts. correct answers 1. Method of Payment 
2. Arrangement of Project Delivery 
3. Method of selection and award 
4. Number of Primes 
5. Legal Description 
 
what are the 3 Methods of Payment in the construction correct answers 1. Lump Sum 
2. Unit Price 
3. Cost Plus 
 
Why does an owner know which method of payment to choose? correct answers By the best way he feel basis for paying the contractor for its effort. 
 
Lumps Sum Contract correct answers let ...
Tentamen (uitwerkingen)
CNST 2341 Final || Questions and 100% Verified Answers.
AIA 201 
 
3.18 Indemnification 
 
3.18.1 correct answers Contractor shall hold the owner not liable for any harm done by him and shall compensate for any harm loss arising out of or resulting from any extent caused by the neglect or omission of the Contractor or any representative for the contractor is held liable. 
 
AIA 201 
 
3.18 Indemnification 
 
3.18.2 correct answers The person at fault from the contractors or subcontractors side has a claim on them then, they are liable to the indemn...
Voordeelbundel
CNST Package Deal With Latest Study Quizzes ( Questions And Answers) Complete Study Solutions
CNST Package Deal With Latest Study Quizzes ( Questions And Answers) Complete Study Solutions
Tentamen (uitwerkingen)
CNST 2341 - final exam concept Verified Questions And Answers Graded A+
3 payment methods common in construction industry - Lump sum, Unit Price, Cost Plus 
4 Corners - is a contract law doctrine 
that "the meaning of a document is to be gathered 
from the entire (all four corners) document." 
4 elements of a contract - 1. Agreement (mutual consent) 
2. Consideration 
3. Capacity to contract 
4. Legal subject matter 
Bid Bond - used to ensure that the principal will honor their bid and enter into a contract with the 
obligee (owner) for the bid amount after the bi...
Tentamen (uitwerkingen)
CNST 2341 Final Exam
CNST 2341 Final Exam
Tentamen (uitwerkingen)
CNST 2341 Final Exam Solved 100%
CNST 2341 Final Exam Solved 100%