API 1169
Latest uploads at API 1169. Looking for notes at API 1169? We have lots of notes, study guides and study notes available for your school.
-
295
- 0
-
23
All courses for API 1169
-
API 1169 295
Latest content API 1169
Recommended Practice for Basic Inspection-New Pipeline Construction API 1169 
API Specification 5L 
Specification for Line Pipe 
 
 
API Recommended Practice 5L1 
Recommended Practice for Railroad Transportation of Line Pipe 
 
 
API Recommended Practice 5LT 
Recommended Practice for Truck Transportation of Line Pipe 
 
 
API Recommended Practice 5LW 
Recommended Practice for Transportation of Line Pipe on Barges and Marine Vessels 
 
 
API Specification 6D 
Specification for Pipe Valves 
 
 
AP...
- Exam (elaborations)
- • 7 pages's •
-
API 1169•API 1169
API 1169 Sample Test Questions And Answers. 
Which of the following equipment may NOT be required for a pressure test? 
Internal line up clamps 
 
 
Before testing begins, a _____________ with explanatory notes and data should be prepared. 
Pressure test procedure 
 
 
The pressure testing of newly constructed liquid pipelines and replaced segments of existing pipelines should be performed in accordance with: 
ASME, Code of Federal Regulations and any other applicable governmental regulations. 
...
- Exam (elaborations)
- • 5 pages's •
-
API 1169•API 1169
API 1169 Exam |Latest Update Graded A+ 
FERC 
Federal Energy Regulatory Commission 
 
 
OSHA 
Occupational Safety and Hazard Administration 
 
 
PHMSA 
Pipeline Hazardous Materials and Safety Administration 
 
 
INGAA 
Interstate Natural Gas Association of America 
 
 
CFR 
Code of Federal Regulations 
 
 
EPA 
Environmental Protection Act 
 
 
CERCLA 
Comprehensive Environmental Response, Compensation and Liability Act also known as Superfund 
 
 
CERCLA purpose 
To remedy threats to human heal...
- Exam (elaborations)
- • 6 pages's •
-
API 1169•API 1169
NGA 31 & 40 - Installing PE/Steel Pipes (31A), Installing Pipe in an excavation (31B) Horizontal Boring (31D), Dead Insertion (31E), Replacing Tracer Wire (40) *BASIC 8 OQs* Original Set 
[Notes based on the NGA 31/40 Student Manual written by Industrial Training Services] 
Backfill 
Refilling an excavated area or trench with excavated material. Proper backfill material depends on soil conditions and piping use. 
 
 
Bore Hole 
A hole bored into the ground vertically or horizontally to form a na...
- Exam (elaborations)
- • 6 pages's •
-
API 1169•API 1169
API 1169 (Pipeline Construction Inspector) Exam 
Building ROW & Installing Pipeline 
Survey, Clearing & Grading, Stockpiling & Stringing 
Field Bending, Ditching & Excavation, Welding, Coating, 
Lowering-in, Backfilling, Cathodic Protection, 
HydrostaticTesting, Clean-up & Restoration 
 
 
On site Safety typically include: 
H2S, working alone policy, fall protection, restricted work area, confined space, hearing protection, manual lifting, lockout tagout, equipment inspection / vehicle, drug and...
- Exam (elaborations)
- • 2 pages's •
-
API 1169•API 1169
API 1169. Study test questions test RM#2 
According to OSHA a "protective system" is defined as: 
Method of protecting employees from cave-ins. 
 
 
Design and development inputs shall be identified and reviewed for? 
Accuracy, completeness and lack of conflict 
 
 
The Excavator calls the One Call Center prior to excavation at least 
Two working days nor more than ten working days 
 
 
Encroachment Area is the area where the ground disturbance occurs within: 
50 feet of the centerline of the...
- Exam (elaborations)
- • 8 pages's •
-
API 1169•API 1169
API 1169 (Inspector Training) Questions And Answers.. 
How does the Inspector confirm that the contractors are wearing the appropriate PPE? 
If PPE is in accordance with the JSA. 
 
 
Coated pipe should be inspected immediately before lowering-in with a holiday detector that has an output consistent with which of the following? 
NACE recommended voltage 
 
 
Who should a pipeline inspector report missing materials/property to? 
Chief Inspector, project manager, or designated owner/operator perso...
- Exam (elaborations)
- • 10 pages's •
-
API 1169•API 1169
API 1169 Recommended Practice Exam Verified 100% Correct!! 
API Specification 5L 
Specification for line pipe 
 
 
APL Recommended Practice 5L1 
Recommended practice for railroad transportation of line pipe 
 
 
API Recommended Practice 5LT 
Recommended practice for truck transportation of line pipe 
 
 
API Recommended Practice 5LW 
Recommended practice for transportation of line pipe on barges and marine vessel 
 
 
API Specification 6D 
Specification for pipeline valves 
 
 
API Recommended P...
- Exam (elaborations)
- • 6 pages's •
-
API 1169•API 1169
API 1169 Exam (2023)|Latest Update Graded A+ 
Definition for Active Excavation Area 
Is the area where the edge of the disturbance is within 25 feet of the centreline of the existing facilities. 
 
 
Definition for Crossing agreement 
Is the agreement entered into between the owner of the existing facility and the crossing company installing the new facility to specify the rights and obligations of the parties during the crossing Construciton. 
 
 
Define Crossing clearance distance 
Is the vert...
- Exam (elaborations)
- • 13 pages's •
-
API 1169•API 1169
API 1169. study test questions test RM#1 
According to FERC, environmental Inspectors shall have _____________ status in regards to all other craft inspectors. 
Equal 
 
 
According to Title 49 CFR 195, any new pipe with a diameter greater than ___________ inches must be marked with the specification, the SMYS/Grade, and pipe size. 
4.5 
 
 
This legislation covers hazardous substance, site contamination, and cleanup 
Comprehensive environmental recovery, compensation, and liability act. 
 
 
A ...
- Exam (elaborations)
- • 13 pages's •
-
API 1169•API 1169
API 1169 (API 1169 terms and study questions) 
Which of the following equipment may NOT be required for a pressure test? 
internal line clamps 
 
 
before testing begins, a ________ with explanatory notes and data should be prepared 
pressure test procedure 
 
 
the pressure testing of newly constructed liquid pipelines and replaced segments of existing pipelinesshould be performed in accordance with 
ASME B31.4, 49 Code of Federal Regulations, Part 195 and any other applicable governmental 
re...
- Exam (elaborations)
- • 11 pages's •
-
API 1169•API 1169
API 1169 Study test questions test RM#3 
One main category variable of pressure test planning that an operator must consider is the _________________. 
purpose 
 
 
Field beveling of pipe ends by manual oxygen cutting is acceptable if authorized by the company. 
True 
 
 
Location of casings cathode protection external anodes, and utility crossings should all be recorded on the. 
as-built drawings 
 
 
Releasing air or water pressure through valves, at a test head, after the testing of a pipe is...
- Exam (elaborations)
- • 13 pages's •
-
API 1169•API 1169
API 1169 Exam Quizzes Completed with A+ Graded Answers 
Class Soil Rock 
 
Class 1 30 (762) 18 (457) 
Class 2, 3, 4 36 (914) 24 (610) 
Drainage ditches of public roads and railroad crossings 
36 (914) 24 (610) 
Class Soil Rock 
 
Class 1 
Class 2, 3, 4 
Drainage ditches of public roads and railroad crossings 
 
 
RT Examination 
Which non-destructive testing method is specified in API 1104 
 
 
30 
Calc the top width of a bell hole exc that is 8 ft deep and 6 ft wide. Soil C. 
 
 
Phase III 
EPA...
- Exam (elaborations)
- • 26 pages's •
-
API 1169•API 1169
API 1169 study question and answers. 
29 CFR 1926. 
Safety and health regulations for construction 
 
 
33 CFR = ? 
PERMITS for dams and dikes in navigable waters of the united states. 
 
 
29 CFR 1910 
For reference and enforcement , the rules created by all federal regulatory agencies are collected into a multi-part docments called the Code of Federal Regulation. 
 
 
50 CFR 21 
Migratory Bird Permits 
 
 
49 CFR 192. 
Transportation of natural and others gas by pipeline 
 
 
49 CFR 195 . 
Tra...
- Exam (elaborations)
- • 2 pages's •
-
API 1169•API 1169
API 1169 RP 1110 Quizzes + Ans. 
RP 1110 
Recommended Practice for the pressire testing of steel pipelines for the transportation of gas, petroleum gas, hazardous Liquids, Highly Volatile Liquids or carbon dioxide 
 
 
Any Physical part of the pipeline, other than line pipe, including but not limited to valves, welds, tees, flanges, fittings, taps, branch connections, and outlets 
Component 
 
 
Any phyical object detected by an in-line inspection device 
Feature 
 
 
Test used to verify the str...
- Exam (elaborations)
- • 2 pages's •
-
API 1169•API 1169
API 1169 Study Guide (Part 1) With Correct Answers. 
API 1110, Section 3.4 
 
A deadweight tester or an equivalent pressure sensing device should have a certificate of calibration that is not more than One year old at the start of testing or calibrated in accordance with the manufacturers recommendations. 
 
One year old 
 
 
 
API 1110, Section 3.6 
 
Before pressure testing begins, a Pressure Test Procedure with explanatory notes and data should be prepared. 
 
Pressure Test Procedure 
 
 
 
A...
- Exam (elaborations)
- • 9 pages's •
-
API 1169•API 1169
API 1169 Study Guide With Correct Answers. 
OSHA 1910 
______ document has the largest PPE section and safety definitions 
 
 
OSHA 1926 
_______ document has construction safety, safety focused on eye and face protection, excavation safety, scaffolds, cranes riggings, use of explosives' 
 
 
33 CFR 321 
______ document covers Dams/ Dikes, very infrequently used, very short and you will quickly be able to find what you need 
 
 
49 CFR 
____ document has hazardous materials tables, hazardous sh...
- Exam (elaborations)
- • 26 pages's •
-
API 1169•API 1169
API 1169. STUDY TEST QUESTIONS 
TEST RM#1 WITH 100% CORRECT 
ANSWERS { GRADED A+} 
According to FERC, environmental Inspectors shall have 
_____________ status in regards to all other craft inspectors. - 
Equal 
According to Title 49 CFR 195, any new pipe with a diameter greater 
than ___________ inches must be marked with the specification, the 
SMYS/Grade, and pipe size. - 4.5 
This legislation covers hazardous substance, site contamination, and 
cleanup - Comprehensive environmental...
- Exam (elaborations)
- • 27 pages's •
-
API 1169•API 1169
Recommended Practice for Basic Inspection-New Pipeline Construction API 1169 
API Specification 5L 
Specification for Line Pipe 
 
 
API Recommended Practice 5L1 
Recommended Practice for Railroad Transportation of Line Pipe 
 
 
API Recommended Practice 5LT 
Recommended Practice for Truck Transportation of Line Pipe 
 
 
API Recommended Practice 5LW 
Recommended Practice for Transportation of Line Pipe on Barges and Marine Vessels 
 
 
API Specification 6D 
Specification for Pipe Valves 
 
 
AP...
- Exam (elaborations)
- • 7 pages's •
-
API 1169•API 1169
API 1169 Sample Test Questions And Answers. 
Which of the following equipment may NOT be required for a pressure test? 
Internal line up clamps 
 
 
Before testing begins, a _____________ with explanatory notes and data should be prepared. 
Pressure test procedure 
 
 
The pressure testing of newly constructed liquid pipelines and replaced segments of existing pipelines should be performed in accordance with: 
ASME, Code of Federal Regulations and any other applicable governmental regulations. 
...
- Exam (elaborations)
- • 5 pages's •
-
API 1169•API 1169