ACI AGGREGATE BASE TESTING TECHNICIAN EXAM QUESTIONS AND VERIFIED ANSWERS 
 
(D75) Sampling should be done very carefully because it is as important as _____. 
Testing 
The _____ or _____ should obtain samples related to the control of production at the source or related to the control of the work at the site. 
Manufacturers, contractors 
Samples to be tested for quality should, when possible, be obtained from the _____. 
Finished product 
(D75) Sampling containers for aggregate samples should b...
- Package deal
- Exam (elaborations)
- • 9 pages's •
-
ACI•ACI
-
BUNDLED ACI CONCRETE FIELD TESTING TECHNICIAN EXAM QUESTIONS AND VERIFIED CORRECT SOLUTIONS 2024• By AcademicSuperScores
Preview 2 out of 9 pages
Getting your document ready...
ACI AGGREGATE BASE TESTING TECHNICIAN EXAM QUESTIONS AND VERIFIED ANSWERS 
 
(D75) Sampling should be done very carefully because it is as important as _____. 
Testing 
The _____ or _____ should obtain samples related to the control of production at the source or related to the control of the work at the site. 
Manufacturers, contractors 
Samples to be tested for quality should, when possible, be obtained from the _____. 
Finished product 
(D75) Sampling containers for aggregate samples should b...
ACI AGGREGATE TESTING TECHNICIAN EXAM QUESTIONS AND ANSWERS 100% PASS 
 
Performance Checklist: 
 
Sampling of Aggregates: 
 
Flowing Aggregate Stream (Bins or Belt Discharge) 
 
5 steps 
1. Use a device that will hold the required amount of material without overflowing. 
 
2. Take each increment from the entire cross section of the material discharge stream 
 
3. Obtain a minimum of three approximately equal increments. 
 
4. Combine the increments to form a field sample. 
 
5. Ensure that the ...
- Package deal
- Exam (elaborations)
- • 18 pages's •
-
ACI•ACI
-
BUNDLED ACI CONCRETE FIELD TESTING TECHNICIAN EXAM QUESTIONS AND VERIFIED CORRECT SOLUTIONS 2024• By AcademicSuperScores
Preview 3 out of 18 pages
Getting your document ready...
ACI AGGREGATE TESTING TECHNICIAN EXAM QUESTIONS AND ANSWERS 100% PASS 
 
Performance Checklist: 
 
Sampling of Aggregates: 
 
Flowing Aggregate Stream (Bins or Belt Discharge) 
 
5 steps 
1. Use a device that will hold the required amount of material without overflowing. 
 
2. Take each increment from the entire cross section of the material discharge stream 
 
3. Obtain a minimum of three approximately equal increments. 
 
4. Combine the increments to form a field sample. 
 
5. Ensure that the ...
ACI - AGGREGATE BASE TESTING TECHNICIAN EXAM QUESTIONS WITH COMPLETE SOLUTIONS 
 
Testing 
Sampling should be done very carefully because it is as important as ____________. 
Conveyer belts 
Transport units 
Roadways 
Stockpiles 
What are the four sources from which field samples can be obtained? 
contaminated, damaged 
Sampling containers for aggregate samples should be made so that the contents will not be lost, _____ or _____. 
Nonrepresentative sample 
Not using correct procedures for reduci...
- Package deal
- Exam (elaborations)
- • 7 pages's •
-
ACI•ACI
-
BUNDLED ACI CONCRETE FIELD TESTING TECHNICIAN EXAM QUESTIONS AND VERIFIED CORRECT SOLUTIONS 2024• By AcademicSuperScores
Preview 2 out of 7 pages
Getting your document ready...
ACI - AGGREGATE BASE TESTING TECHNICIAN EXAM QUESTIONS WITH COMPLETE SOLUTIONS 
 
Testing 
Sampling should be done very carefully because it is as important as ____________. 
Conveyer belts 
Transport units 
Roadways 
Stockpiles 
What are the four sources from which field samples can be obtained? 
contaminated, damaged 
Sampling containers for aggregate samples should be made so that the contents will not be lost, _____ or _____. 
Nonrepresentative sample 
Not using correct procedures for reduci...
ACI Certification- Concrete Field-Testing Technician 
Grade 1 CP-1 (12) 100% Correct Answers | Verified | 
Latest 2024 Version 
The sensor of the temperature measuring device shall be submerged a minimum of ______ inches into 
the freshly mixed concrete. - 3" 
The temperature measuring device shall have a capacity of measuring temperature of freshly mixed 
concrete to ± ______ °F throughout a range of ____________. - 1 degree, 30 degrees to 120 degrees 
The temperature measuring device shall ...
- Package deal
- Exam (elaborations)
- • 16 pages's •
-
ACI•ACI
-
ACI Exam Resources with complete solutions 100% verified 2024/2025• By hov
Preview 3 out of 16 pages
Getting your document ready...
ACI Certification- Concrete Field-Testing Technician 
Grade 1 CP-1 (12) 100% Correct Answers | Verified | 
Latest 2024 Version 
The sensor of the temperature measuring device shall be submerged a minimum of ______ inches into 
the freshly mixed concrete. - 3" 
The temperature measuring device shall have a capacity of measuring temperature of freshly mixed 
concrete to ± ______ °F throughout a range of ____________. - 1 degree, 30 degrees to 120 degrees 
The temperature measuring device shall ...
ACI Concrete Field-Testing Technician- Grade I 
Study Guide | 100% Correct Answers | Verified | 
Latest 2024 Version 
The sensor of the temperature measuring device shall be submerged a minimum of _____ in. 
[_____mm] into the freshly mixed concrete. - 3 in. [75 mm] 
The temperature measuring device shall have a capacity of measuring temperature of freshly mixed 
concrete to +- _____ degrees F [+- _____ C] throughout a range of _____. - 1 degree F [0.5 C], 30 
degrees F to 120 F [0 C to 50 C] 
T...
- Package deal
- Exam (elaborations)
- • 14 pages's •
-
ACI•ACI
-
ACI Exam Resources with complete solutions 100% verified 2024/2025• By hov
Preview 2 out of 14 pages
Getting your document ready...
ACI Concrete Field-Testing Technician- Grade I 
Study Guide | 100% Correct Answers | Verified | 
Latest 2024 Version 
The sensor of the temperature measuring device shall be submerged a minimum of _____ in. 
[_____mm] into the freshly mixed concrete. - 3 in. [75 mm] 
The temperature measuring device shall have a capacity of measuring temperature of freshly mixed 
concrete to +- _____ degrees F [+- _____ C] throughout a range of _____. - 1 degree F [0.5 C], 30 
degrees F to 120 F [0 C to 50 C] 
T...
ACI Concrete Field-Testing Technician- Grade I 
Questions | 100% Correct Answers | Verified | 
Latest 2024 Version 
Section 1: Temperature of Freshly Mixed Hydraulic-Cement Concrete - C1064 
The end of the temperature sensing portion of the temperature measuring device is submerged a 
minimum of _____ into the freshly mixed concrete. - 3 inches 
The temperature measuring device shall be capable of accurately measuring temperature of freshly 
mixed concrete to _____, throughout a range of _____. ...
- Package deal
- Exam (elaborations)
- • 14 pages's •
-
ACI•ACI
-
ACI Exam Resources with complete solutions 100% verified 2024/2025• By hov
Preview 2 out of 14 pages
Getting your document ready...
ACI Concrete Field-Testing Technician- Grade I 
Questions | 100% Correct Answers | Verified | 
Latest 2024 Version 
Section 1: Temperature of Freshly Mixed Hydraulic-Cement Concrete - C1064 
The end of the temperature sensing portion of the temperature measuring device is submerged a 
minimum of _____ into the freshly mixed concrete. - 3 inches 
The temperature measuring device shall be capable of accurately measuring temperature of freshly 
mixed concrete to _____, throughout a range of _____. ...
ACI Concrete Field-Testing Technician - 
Grade 1 Exam Review | 100% Correct 
Answers | Verified | Latest 2024 Version 
Q1. Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. 
A. True 
B. False - B. False 
ASTM C172 -Para (4.1.2) - Start molding. 
specimens for strength tests within 15 min after fabricating the 
composite sample. 
Q2. The maximum allowable time between obtaining the first and last portions of the composite sample 
may not exceed 5...
- Package deal
- Exam (elaborations)
- • 43 pages's •
-
ACI•ACI
-
ACI Exam Resources with complete solutions 100% verified 2024/2025• By hov
Preview 4 out of 43 pages
Getting your document ready...
ACI Concrete Field-Testing Technician - 
Grade 1 Exam Review | 100% Correct 
Answers | Verified | Latest 2024 Version 
Q1. Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. 
A. True 
B. False - B. False 
ASTM C172 -Para (4.1.2) - Start molding. 
specimens for strength tests within 15 min after fabricating the 
composite sample. 
Q2. The maximum allowable time between obtaining the first and last portions of the composite sample 
may not exceed 5...
ACI Concrete Field-Testing Technician - Grade I | 100% 
Correct Answers | Verified | Latest 2024 Version 
The end of the temperature sensing portion of the temperature measuring device is submerged a 
minimum of __mm [__in.] into the freshly mixed concrete. - 77mm /3in. 
The temperature measuring device shall be capable of accurately measuring the temperature of freshly 
mixed concrete to +- __C [+__F] throught a range of __. - 0.5 C / +-1F / 0-50 Decrees C 
The temp. measuring device shall be v...
- Package deal
- Exam (elaborations)
- • 6 pages's •
-
ACI•ACI
-
ACI Exam Resources with complete solutions 100% verified 2024/2025• By hov
Preview 2 out of 6 pages
Getting your document ready...
ACI Concrete Field-Testing Technician - Grade I | 100% 
Correct Answers | Verified | Latest 2024 Version 
The end of the temperature sensing portion of the temperature measuring device is submerged a 
minimum of __mm [__in.] into the freshly mixed concrete. - 77mm /3in. 
The temperature measuring device shall be capable of accurately measuring the temperature of freshly 
mixed concrete to +- __C [+__F] throught a range of __. - 0.5 C / +-1F / 0-50 Decrees C 
The temp. measuring device shall be v...
ACI Concrete Strength Testing Technician 
CP-19 (14) | 100% Correct Answers | Verified 
| Latest 2024 Version 
These procedures for capping enable concrete cylinders and cores to meet the standard's requirements 
for ________ and _________. - Planeness, perpendicularity 
Equipment needed for the capping process includes capping _____ , _____devices, and ______ pots. - 
Plates, alignment, melting 
Plates for neat cement and high strength gypsum plaster caps should be made of _____, _____, _____ ...
- Package deal
- Exam (elaborations)
- • 9 pages's •
-
ACI•ACI
-
ACI Exam Resources with complete solutions 100% verified 2024/2025• By hov
Preview 2 out of 9 pages
Getting your document ready...
ACI Concrete Strength Testing Technician 
CP-19 (14) | 100% Correct Answers | Verified 
| Latest 2024 Version 
These procedures for capping enable concrete cylinders and cores to meet the standard's requirements 
for ________ and _________. - Planeness, perpendicularity 
Equipment needed for the capping process includes capping _____ , _____devices, and ______ pots. - 
Plates, alignment, melting 
Plates for neat cement and high strength gypsum plaster caps should be made of _____, _____, _____ ...
ACI Flatwork Questions & Answers | 
100% Correct Answers | Verified | Latest 
2024 Version 
It is important that the ____________ __________ read and understand project specifications. - 
finisher foreman 
If the crew can place and finish 100 yd3 of concrete per hour, the producer's delivery rate should be 
about _____ yd3 per hour. - 100 
Concrete is sold by the ton? - False 
Delays in discharging concrete trucks can result in the concrete being hard to: - pump, place, and 
finish 
When there ...
- Package deal
- Exam (elaborations)
- • 9 pages's •
-
ACI•ACI
-
ACI Exam Resources with complete solutions 100% verified 2024/2025• By hov
Preview 2 out of 9 pages
Getting your document ready...
ACI Flatwork Questions & Answers | 
100% Correct Answers | Verified | Latest 
2024 Version 
It is important that the ____________ __________ read and understand project specifications. - 
finisher foreman 
If the crew can place and finish 100 yd3 of concrete per hour, the producer's delivery rate should be 
about _____ yd3 per hour. - 100 
Concrete is sold by the ton? - False 
Delays in discharging concrete trucks can result in the concrete being hard to: - pump, place, and 
finish 
When there ...