General contractor Questions & 100% Verified  Answers | Latest Update | Already Graded A+

Exam (elaborations)

General contractor Questions & 100% Verified Answers | Latest Update | Already Graded A+

General B Contractor License
General B Contractor License

In a post tensioned Beam what is the minimum size bar used to support the beam? : #4 Bar What is the minimum height between finished floor and joist in the kitchen is 48" on center? : 7 FT How thick does a load bearing masonry need to be on a single story building? : 6 inches What chemical is used for high heat concrete : retarder when mechanical equipment is on the roof, how far from the edge of the roof should a warning line be if the equipment is running parallel to the roof edge...

-
38 pages
Written in 2023/2024
Grade A+
Axpert
$13.39
- sold
CSLB Class B General Building Contractor Exam Prep | Practice Questions & Verified Answers 2026/2027

Exam (elaborations)

CSLB Class B General Building Contractor Exam Prep | Practice Questions & Verified Answers 2026/2027

Popular
General B Contractor License
General B Contractor License

Prepare for the CSLB Class B General Building Contractor Exam with practice covering construction methods, building systems, safety, estimating, materials, codes, and general building practices.

-
17 pages
Written in 2026/2027
Grade A+
ExamBooster111
$12.99
- sold
General B Contractor License Exam Revised Questions and Answers / Sure A+

Exam (elaborations)

General B Contractor License Exam Revised Questions and Answers / Sure A+

General B Contractor License
General B Contractor License

it is better to use leveling rod than a yard stick when using a transit because the rod is - longer Fill dirt is measured in - cubic yards what backfill should be used after concrete forms have been removed? - sand The best type of material to set a house foundation on is: - gravel what doe "rough grade" refer to in excavation and grading - the grade approximately conforming to the finish grade how many days can earth from a trench be piled up against a structure? - 7

-
20 pages
Written in 2023/2024
Grade A+
Lucindajohns
$15.49
- sold
Contractors License General B Exams Pack Questions & 100% Verified Answers | Latest Update

Package deal

Contractors License General B Exams Pack Questions & 100% Verified Answers | Latest Update

Contractors License General B Exams Pack Questions & 100% Verified Answers | Latest Update

-
6 items
Axpert
$25.99
- sold
General B Contractor License Questions &  100% Verified Answers | Latest Update | Already  Graded A+

Exam (elaborations)

General B Contractor License Questions & 100% Verified Answers | Latest Update | Already Graded A+

General B Contractor License
General B Contractor License

it is better to use leveling rod than a yard stick when using a transit because the rod is : longer Fill dirt is measured in : cubic yards what backfill should be used after concrete forms have been removed? : sand The best type of material to set a house foundation on is: : gravel what doe "rough grade" refer to in excavation and grading : the grade approximately conforming to the finish grade how many days can earth from a trench be piled up against a structure? : 7 2 | P a g e ...

-
39 pages
Written in 2023/2024
Grade A+
Axpert
$13.99
- sold
General Building Contractor (B) License Questions & 100% Verified Answers | Latest  Update | Already Graded A+

Exam (elaborations)

General Building Contractor (B) License Questions & 100% Verified Answers | Latest Update | Already Graded A+

General B Contractor License
General B Contractor License

To whom should a stop notice be delivered? : The construction lender or awarding authority. What are the 3 ways that a stop notice can be delivered? : (1) In person (2) Registered mail (3) Certified mail Notice of Completion : A notice that shortens the lien period to 30 days for a subcontractor and 60 days for a contractor. The clock starts on the filing date of the Notice. notice of nonresponsibility : A notice provided by law designed to relieve the property owner from responsibi...

-
23 pages
Written in 2023/2024
Grade A+
Axpert
$10.99
- sold
General Contractor's License Exam Questions  & 100% Verified Answers | Latest Update |  Already Graded A+

Exam (elaborations)

General Contractor's License Exam Questions & 100% Verified Answers | Latest Update | Already Graded A+

General B Contractor License
General B Contractor License

Minnesota requires that all builders continue their education by attending 7 hours of classroom study per year, with at least 1 hour dedicated to: : Energy efficiency It is a law that you must notify, in writing, if you change your business name or your address where you conduct business, within : 15 days Penalties for violation of laws relating to the residential building industry include : 1. Civil penalties up to $10,000, per violation 2. Denial of a license at application or renewa...

-
35 pages
Written in 2023/2024
Grade A+
Axpert
$12.99
- sold
General B Contractors License Questions &  100% Verified Answers | Latest Update | Already  Graded A+

Exam (elaborations)

General B Contractors License Questions & 100% Verified Answers | Latest Update | Already Graded A+

General B Contractor License
General B Contractor License

It is better to use a leveling rod than a yard stick when using a transit beacause the rod is: : Longer :Fill dirt is measured in: : Cubic yards What backfill should be used after concrete forms have been removed? : Sand The best type of material to set a house foundation on is: : Gravel What does "rough grade" refer to in excavation and grading? : The grade approximately conforming to the finished grade How many days can earth from a trench be piled up against a structure? : 7 2...

-
6 pages
Written in 2023/2024
Grade A+
Axpert
$10.89
- sold
GENERAL B CONTRACTOR LICENSE EXAM 2024 WITH 100% CORRECT ANSWERS

Exam (elaborations)

GENERAL B CONTRACTOR LICENSE EXAM 2024 WITH 100% CORRECT ANSWERS

GENERAL B CONTRACTOR LICENSE
GENERAL B CONTRACTOR LICENSE

it is better to use leveling rod than a yard stick when using a transit because the rod is - correct answer longer Fill dirt is measured in - correct answer cubic yards what backfill should be used after concrete forms have been removed? - correct answer sand The best type of material to set a house foundation on is: - correct answer gravel what doe "rough grade" refer to in excavation and grading - correct answer the grade approximately conforming to the finish grade ...

-
22 pages
Written in 2023/2024
Grade A+
RapidPassAcademy
$14.99
- sold
GENERAL B CONTRACTOR LICENSE EXAM 2024 WITH 100% CORRECT ANSWERS

Exam (elaborations)

GENERAL B CONTRACTOR LICENSE EXAM 2024 WITH 100% CORRECT ANSWERS

GENERAL B CONTRACTOR LICENSE
GENERAL B CONTRACTOR LICENSE

it is better to use leveling rod than a yard stick when using a transit because the rod is - correct answer longer Fill dirt is measured in - correct answer cubic yards what backfill should be used after concrete forms have been removed? - correct answer sand The best type of material to set a house foundation on is: - correct answer gravel what doe "rough grade" refer to in excavation and grading - correct answer the grade approximately conforming to the finish grade ...

-