Exam (elaborations)
Flashcards Set 11 exam questions and revised correct answers
A. Equipment Unit Cost ( $, prepare an Estimate, equipment estimating) - correct answer BGA- I- Equipment, cost equipment 
BGA- I- Equipment- equipment cost 
CM 10- I- Equipment- productivity 
 
B. Evidence of Financial Arrangement (owner ability to pay a contract or the job) - correct answer AIA 201- I- Financial Arrangements, Owner's 
AIA 701 - Post-bid information 
 
C. OSHA 300/300A Log (injury report) - correct answer CM 7- I- Safety and Health- injury ___ 301 or 300 or 300A 
 
D. Inst...
Exam (elaborations)
Residential Contractor Exam Study Guide (Septic Tank Specifications pgs. 5-6) questions with 100% verified answers
Popularrender the permit void - correct answer grading, filling or other site modifications that would adversely affect the sewage system 
 
septic tank - correct answer first component of an on‐site sewage management system, generally pre‐cast with concrete and delivered to the construction site 
 
approval of the county board of health - correct answer septic tanks can be poured in place when necessary, plans and specifications for the poured‐in‐place septic tanks must be submitted to the hea...
Exam (elaborations)
Part-1, Florida Contractor Exam, (Buisness and Finance) questions and 100% correct answers
According AIA, the contractor shall pay the subcontractor within _________ days after the contractor receives payment form the owner 
. A. three working 
B five calendar 
C. five working 
D. seven working - correct answer D. seven Working days 
 
A registered contractor may apply for "grandfathering" as certified contractor after______ years of experience. 
 A. 2 
B. 4 
C. 5 
D. 10 - correct answer c. 5 
 
When making business plan to start up business, it is imperative to know who and w...
Exam (elaborations)
Septic License exam questions with well verified answers
Septic tanks are required to have all seams and drain holes sealed to make water tight. - correct answer true 
 
all pretreatment units + distribution boxes are required to have KY approval numbers on them - correct answer true 
 
equal-flow type distribution boxes may be installed on tamped sand or gravel - correct answer true 
 
highest hole in hill side box does not have to be connected to inlet pipe - correct answer false 
 
all distribution boxes shall be installed level - correct answer tr...
Exam (elaborations)
FL contractors manual - Ch. 2 exam questions with verified correct answers
What does Chapter 489, Florida Statues provide for? - correct answer The licensure and regulation of all types of contractors in FL 
Pg. 2-5 
 
How many parts are in Chapter 489 of FL Statues and what are they? - correct answer 3 parts 
Construction contracting 
Electrical and alarm system contracting 
Septic tank contracting 
Pg. 2-5 
 
What does CILB stand for? - correct answer Construction Industry Licensing Board 
Pg. 2-5 
 
How many members are on the CILB? - correct answer 18 members 
Pg...
Exam (elaborations)
Plumbing florida state test exam questions and revised correct answers
all of the following are true regarding a general partnership except - correct answer there is a potential of double taxation on earnings. 
 
a joint venture is - correct answer two or more persons or entities jointly seeking a profit in some specific venture without an actual partnership or corporation 
 
which of the following is true regarding a joint venture? - correct answer a joint venture is generally limited to a single transaction 
 
one of the advantages of a standard Corportation is -...
Exam (elaborations)
Wastewater Practice Test (Florida) English exam questions and 100% revised answers
According to FDEP chapter 62-600.440 (4) (b) FAC, basic level disinfection is described as: - correct answer A chlorine residual of 0.5 mg/L for 15 minutes at peak hourly flow 
 
FDEP chapter 62-604.550 (a) FAC, requires a wastewater spill shall be verbally reported to the state warning point no later than: - correct answer 24hrs from discovery 
 
What is the 'rule of thumb' regarding pump packing? - correct answer Never put rings of new packing over the old packing 
 
According to FDEP ch...
Exam (elaborations)
Septic Exam questions with well verified answers
Setback requirements (Wells and Springs) - correct answer a min of 50' from septic tank and min 100' from absorption field 
 
Setback requirements (Property lines) - correct answer a min of 10' from septic tanks, min of 5' from absorption fields for property on public water 
 
Setback requirements (bodies of water or impoundments) - correct answer a min of 25' from septic tanks and a min of 50' from absorption fields 
 
Setback requirements (streams and tributaries) - correct a...
Exam (elaborations)
FL Contractors Manual, Set #3 exam questions and verified correct answers
All of the following are true regarding a general partnership except ____________. 
A. a partnership is terminated upon the death of a partner 
B. general partners have unlimited personal liability 
C. fringe benefits are not generally tax deductible 
D. there is a potential of double taxation on earnings - correct answer D. there is a potential of double taxation on earnings, Ch. 1 
 
A joint venture is _____________. 
 
A. two or more companies combining their resources and business skills...