- Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about ? On this page you'll find 45 study documents about .
All 45 results
Sort by:
-
Exam (elaborations)
EGR 1400 EXAM 1 QUESTIONS AND ANSWERS
-
---9June 20252024/2025A+
- EGR 1400 EXAM 1 QUESTIONS AND ANSWERS 
In C#, you can simulate rolling two dice by selecting a random number between 1 and 6 to represent 
each die roll and then adding them together to get the dice total. Let,s say that we developed a program 
to do this and we rolled the pair of dice 50 times and recorded the results of each roll on a sheet of 
paper. Can we just select one random number between 2 and 12 and achieve the same experimental 
results for the 50 rolls as rolling two die and ad...
-
$12.99 More Info
STANGRADES
-
Exam (elaborations)
EGR 1400 EXAM 1 2025 QUESTIONS AND ANSWERS
-
---9May 20252024/2025A+
- Copyright ©2025 BRIGHTSTARS ALL RIGHTS RESERVED 1 
In C#, you can simulate rolling two dice by selecting a random number between 1 and 6 to 
represent each die roll and then adding them together to get the dice total. Let,s say that we 
developed a program to do this and we rolled the pair of dice 50 times and recorded the results 
of each roll on a sheet of paper. Can we just select one random number between 2 and 12 and 
achieve the same experimental results for the 50 rolls as rolling two di...
-
$11.99 More Info
Brightstars
-
Exam (elaborations)
EGR 1400 FINAL EXAM 2025 QUESTIONS AND ANSWERS
-
---26May 20252024/2025A+
- 40 ohms - ANS Two resistors R1 and R2 are in parallel. If R1 = R2 = 80 ohms, what is the 
equivalent resistance if these two resistors were combined into one? 
10 - ANS In the circuit below, the resistance Rab is equal to___? 
circuit har a 6 ohm resistor in series with an 8 ohm resistor that is parallel to another 8 ohm 
resistor 
5.1 - ANS A Detroit Lions football player kicks a football at an angle of 30º and a velocity of 
20 meters per second. How high will the ball go (in meters from the ...
-
$13.99 More Info
Brightstars
-
Exam (elaborations)
EGR 1400 EXAM 2 2025 QUESTIONS AND ANSWERS
-
---19May 20252024/2025A+
- When the location of the original variable is passed as an argument from the calling method to 
the called method, we say that it is... 
a. passed by reference 
b. copy passed 
c. passed by value 
d. reference passed 
e. none of the above - ANS a. passed by reference 
How many times does the message box get executed in a loop that begins with the following 
statement? 
int I; 
for (I = 1; I < 4; I++) 
{ 
MessageBox.Show(I); 
} 
a. 0 
b. 2 
c. 3 
EGR 1400 EXAM 2 2025 QUESTIONS AND 
ANSWERS 
Co...
-
$12.99 More Info
Brightstars
-
Exam (elaborations)
EGR 1400 EXAM 3 2025 QUESTIONS AND ANSWERS
-
---18May 20252024/2025A+
- Copyright ©2025 BRIGHTSTARS ALL RIGHTS RESERVED 1 
Table - ANS A rectangular array of data 
script file - ANS a sequence of MATLAB commands also called 
program (also called M-files) 
- Must begin with a letter 
- Can be up to 63 characters long (31 in MATLAB 6) 
- Can contain letters, digits, and the underscore characters - MATLAB is case sensitive 
- No space is allowed 
- No use of built-in functions - ANS Rules about variable names: 
Array - ANS a fundamental form that MATLAB uses to store ...
-
$12.99 More Info
Brightstars
-
Exam (elaborations)
EGR 1400 EXAM 2 STUDY GUIDE 2025 QUESTIONS AND ANSWERS
-
---6May 20252024/2025A+
- Message Box Syntax - ANS MessageBox.Show("[Message]"); 
ListBox control - ANS Used to create a ListBox control class object. Properties include Name, 
Items, Sorted, SelectedItem, and SelectedIndex. Methods include Items.Add(), Items.Remove(), 
and Items.Clear(). Events include SelectedIndexChanged. 
for loop - ANS Loops that have a predetermined beginning, end, and increment (step 
interval). In the for (i = 0; i <20; i++) { ... } 
do-while loop - ANS do { ... } while (condn) Note: Run...
-
$11.99 More Info
Brightstars
-
Exam (elaborations)
C# FINAL EXAM 2025 QUESTIONS AND ANSWERS
-
---29May 20252024/2025A+
- When we call a constructor method among different constructors, we match the suitable 
constructor by matching the name of constructor first, then the number and then the type of 
parameters to decide which constructor is to be overloaded. What is this process called? 
Inheritance 
Encapsulation 
Polymorphism 
Method overriding - ANS Polymorphism 
Which of the following statements are correct for the difference between value and reference 
types? Each correct answer represents a complete solutio...
-
$13.99 More Info
Brightstars
-
Package deal
EGR 1400 Exams NEWEST 2025/2026 ACTUAL COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+ (ALL BUNDLED HERE!!)
-
---11May 2025
- EGR 1400 Exams NEWEST 2025/2026 ACTUAL COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+ (ALL BUNDLED HERE!!)
-
$36.84 More Info
TutorHub
-
Exam (elaborations)
EGR 2400 Exam 1 NEWEST 2025/2026 ACTUAL COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+
-
---6May 20252024/2025A+
- EGR 2400 Exam 1 NEWEST 2025/2026 ACTUAL COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+
-
$15.99 More Info
TutorHub