Flat Slab - ANSWERS -- Reinforced in two or more directions 
 
- Supported by columns with dropped panels and capitals 
 
Flat Plate - ANSWERS -- Reinforced in two directions 
 
- Columns not enlarged where they meet the slab 
 
What is the difference between a window sash and a window? - ANSWERS -Sash describes the movable part of a window assembly. 
Window refers to the entire assembly 
 
Door types - ANSWERS -Swinging 
Bifold 
Accordion 
Pocket ...
Exam (elaborations)
CMP 210: Exam 1 (QUESTIONS) with verified answers passed
CMP 210: Exam 1 (QUESTIONS) with verified answers passed
Other
Cmp 210 Exam 2 Study Guide
Cmp 210 Exam 2 Study Guide
Exam (elaborations)
Cmp 210: Exam 1 Study Guide
Cmp 210: Exam 1 Study Guide
Exam (elaborations)
Cmp 210 Questions & Answers
Cmp 210 Questions & Answers
Exam (elaborations)
Cmp 210 Final Questions & Answers
Cmp 210 Final Questions & Answers
Exam (elaborations)
Cmp 210 Exam 2 Questions And Answers
Cmp 210 Exam 2 Questions And Answers
Other
CMP 210 - Exam 1 Study Guide
Phases of construction projects - Answer- 1. Pre-Design 
2. Design 
3. Pre-Construction 
4. Construction 
 
Pre-design const. phase - Answer- - Project conception by owner 
- Site identified 
- Pre-design planning 
- Budgets & financing 
 
Design const. phase - Answer- - Bldg. design drawings & specifications 
- Bidding & negotiation 
 
Pre-construction phase - Answer- - Contractor selection 
- Review of bids 
- Establish project delivery method 
 
Construction phase - Answer- - Bldg. permit 
- ...
Exam (elaborations)
CMP 210 Exam 2 2022/2023 with 100% correct answers
reinforced masonry 
used then flexural, compressive, and shear stresses exceed those permitted for partially or unreinforced masonry 
 
 
 
cavity wall construction 
generally used for exterior walls because they can control moisture penetration and be insulated 
 
 
 
expansion joints 
create space between adjacent parts of masonry construction and permit a limited amount of movement 
 
 
 
control joints 
provide tension relief between parts of masonry walls that may change from their original...
Exam (elaborations)
CMP 210: Exam 1 (QUESTIONS) and answers 2022/2023
Phases of construction projects 
1) Project conception by owner. 
2)PRE-DESIGN PLANNING 
 
3) DESIGN PHASE (drawings and specifications) 
4)Bidding and Negotiating 
 
5) PRE-CONSTRUCTION PLANNING 
 
6)CONSTRUCTION 
7) Project close out 
 
 
 
Pre-Design Phase 
1. project vision 
2. site identified 
3. budget/financing 
4. design/construction schedules 
5. zoning/building code check 
6. Architect/engineer rfq 
 
 
 
Design Phase 
1. Develop prints 
2. Determine actual materials and performance o...