- Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about ? On this page you'll find 17 study documents about .
All 17 results
Sort by
-
ACI Concrete Strength Testing Technician CP-19 (14) Questions And Answers With Verified Study Solutions Rated A+
- Exam (elaborations) • 9 pages • 2025
-
- $11.49
- + learn more
These procedures for capping enable concrete cylinders and cores to meet the 
standard's requirements for Planeness and perpendicularity. 
Equipment needed for the capping process includes capping Plates, alignment devices, 
and melting pots. 
Plates for neat cement and high strength gypsum plaster caps should be made 
of Glass, metal, granite, or diabase. 
Sulfur mortar cap plates should be formed against Metal or Stone plates. 
The purpose of the guide bar or bull's eye level is to ensur...
-
ACI CONCRETE STRENGTH TESTING TECHNICIAN CP-19 (14) EXAM 2025/ 100 QUESTIONS WITH VERIFIED ANSWERS/2025-2026-A+ GRADE
- Exam (elaborations) • 12 pages • 2025
-
- $14.99
- + learn more
ACI CONCRETE STRENGTH TESTING TECHNICIAN CP-19 (14) EXAM 2025/ 100 QUESTIONS WITH VERIFIED ANSWERS/-A+ GRADE
-
ACI CONCRETE STRENGTH TESTING TECHNICIAN CP-19 (14) EXAM 2024/ 100 QUESTIONS WITH VERIFIED ANSWERS/A+ GRADE
- Exam (elaborations) • 11 pages • 2024
- Available in package deal
-
- $17.99
- + learn more
ACI CONCRETE STRENGTH TESTING TECHNICIAN CP-19 (14) EXAM 2024/ 100 QUESTIONS WITH VERIFIED ANSWERS/A+ GRADE
-
ACI Concrete Field-Testing Technician Exam Bundle Questions | 100% Correct Answers | Verified | Latest 2024 Version
- Package deal • 8 items • 2024
-
- $30.99
- + learn more
ACI Concrete Field-Testing Technician Exam Bundle Questions | 100% Correct Answers | Verified | Latest 2024 Version
-
ACI Concrete Strength Testing Technician CP-19 (14) | 100% Correct Answers | Verified | Latest 2024 Version
- Exam (elaborations) • 9 pages • 2024
- Available in package deal
-
- $8.99
- + learn more
These procedures for capping enable concrete cylinders and cores to meet the standard's requirements 
for ________ and _________. - Planeness, perpendicularity 
Equipment needed for the capping process includes capping _____ , _____devices, and ______ pots. - 
Plates, alignment, melting 
Plates for neat cement and high strength gypsum plaster caps should be made of _____, _____, _____ or 
_____. - Glass, metal granite or diabase 
Sulfur mortar cap plates should be formed against _____ or _____ ...
-
ACI Concrete Strength Testing Technician CP-19 (14)
- Exam (elaborations) • 7 pages • 2024
- Available in package deal
-
- $7.99
- + learn more
These procedures for capping enable concrete cylinders and cores to meet the standard's requirements for ________ and _________. - answer-Planeness, perpendicularity 
 
Equipment needed for the capping process includes capping _____ , _____devices, and ______ pots. - answer-Plates, alignment, melting 
 
Plates for neat cement and high strength gypsum plaster caps should be made of _____, _____, _____ or _____. - answer-Glass, metal granite or diabase 
 
Sulfur mortar cap plates should be formed...
-
ACI Concrete Strength Testing Technician CP-19 (14) Questions With Correct Solutions, Already Passed!!
- Exam (elaborations) • 9 pages • 2024
- Available in package deal
-
- $7.99
- + learn more
These procedures for capping enable concrete cylinders and cores to meet the standard's requirements 
for ________ and _________. - Answer-Planeness, perpendicularity 
Equipment needed for the capping process includes capping _____ , _____devices, and ______ pots. - 
Answer-Plates, alignment, melting 
Plates for neat cement and high strength gypsum plaster caps should be made of _____, _____, _____ or 
_____. - Answer-Glass, metal granite or diabase 
Sulfur mortar cap plates should be formed ag...
ACI Concrete Bundled Exams with complete solution
-
ACI Concrete Strength Testing Technician CP-19 (14) Questions and Answers 2024 Complete;100% verified
- Exam (elaborations) • 8 pages • 2024
- Available in package deal
-
- $7.99
- + learn more
These procedures for capping enable concrete cylinders and cores to meet the standard's 
requirements for ________ and _________. - Answer-Planeness, perpendicularity 
Equipment needed for the capping process includes capping _____ , _____devices, and ______ pots. 
- Answer-Plates, alignment, melting 
Plates for neat cement and high strength gypsum plaster caps should be made of _____, _____, 
_____ or _____. - Answer-Glass, metal granite or diabase 
Sulfur mortar cap plates should be formed ag...
That summary you just bought made someone very happy. Also get paid weekly? Sell your study resources on Stuvia! Discover all about earning on Stuvia