NERC (NERC)

Liberty University

Here are the best resources to pass NERC (NERC). Find NERC (NERC) study guides, notes, assignments, and much more.

All 27 results

Sort by:

KNOWN NERC EXAM V11 QUESTIONS AND CORRECT VERIFIED ANSWERS 100% GUARANTEED PASS A+ GRADED
  • Exam (elaborations)

    KNOWN NERC EXAM V11 QUESTIONS AND CORRECT VERIFIED ANSWERS 100% GUARANTEED PASS A+ GRADED

  • A Balancing Authority notices that the Operating Reserve has steadily declined throughout the hour. What is the most likely cause? a) Loss of a large generator in the area b) An inaccurate load forecast c) Loss of a major transmission line d) A malfunction of EMS b) An inaccurate load forecast Balancing Area A notices that the Interconnection frequency is 59.94 Hz and their ACE is 0. Which of the following could be the cause of this reading? a) A net under-generation in Balancing ...
  • Studyclock
    $12.49 More Info
NERC RC Exam| 102 questions| with complete solutions
  • Exam (elaborations)

    NERC RC Exam| 102 questions| with complete solutions

  • NERC RC Exam| 102 questions| with complete solutions
  • NURSEPROCTORIO
    $8.50 More Info
NERC EXAM| FINAL ASSESSMENT| 317 QUESTIONS| 52 PAGES COMPLETE SOLUTIONS 100% CORRECT ANSWERS|
  • Exam (elaborations)

    NERC EXAM| FINAL ASSESSMENT| 317 QUESTIONS| 52 PAGES COMPLETE SOLUTIONS 100% CORRECT ANSWERS|

  • NERC EXAM| FINAL ASSESSMENT| 317 QUESTIONS| 52 PAGES COMPLETE SOLUTIONS 100% CORRECT ANSWERS| When using a dynamic schedule and the energy profile in an hour is >250 MW and the actual hourly integration deviates from the hourly energy profile by ____ the tag must be modified. A. 100 MW B. 10% C. 50 MW D. 25% Correct Answer B. 10% Dry steam plants, flash steam plants, and binary cycle power plants are the three main types of what kind of generating plant? A. Nuclear generators B. C...
  • SavvyMind
    $10.58 More Info
KNOWN NERC EXAM QUESTIONS WITH SOLUTIONS (A+ GRADED)
  • Exam (elaborations)

    KNOWN NERC EXAM QUESTIONS WITH SOLUTIONS (A+ GRADED)

  • KNOWN NERC EXAM QUESTIONS WITH SOLUTIONS (A+ GRADED)
  • nabiswahillary90
    $10.49 More Info
NERC Prep - Bal, Int, & Trans Test| 61 questions| with complete solutions
  • Exam (elaborations)

    NERC Prep - Bal, Int, & Trans Test| 61 questions| with complete solutions

  • What group can approve a change in the Disturbance Recovery Period for an Interconnection? a. NERC Interconnection Working Group b. NERC Operating Committee c. NERC Regional Council d. NERC Disturbance Analysis Working Group correct answer: b. NERC Operating Committee What is the first thing an operator should do after a relay operation? a. Check power system stabilizers b. Notify adjacent Transmission and Balancing areas c. Check targets and equipment d. Notify their PSE tha...
  • Classroom
    $9.99 More Info
NERC Standards| 120 questions| with complete solutions
  • Exam (elaborations)

    NERC Standards| 120 questions| with complete solutions

  • How Many Active Standards are in BAL (Resource and Demand Balancing) correct answer: There are 8 Active Standards Listed Below: BAL-001-2 Real Power Balancing Control Performance Related Information Subject to Enforcement BAL-001-TRE-1 Primary Frequency Response in the ERCOT Region Related Information Subject to Enforcement BAL-002-3 Disturbance Control Standard - Contingency Reserve for Recovery from a Balancing Contingency Event Subject to Enforcement BAL-002-WECC-2a Contingency Reserve R...
  • Classroom
    $10.99 More Info
NERC Class| 98 questions| with complete solutions
  • Exam (elaborations)

    NERC Class| 98 questions| with complete solutions

  • Frequency Bias and Jointly Owned Units (JOU) correct answer: BAs that use dynamic schedule or pseudo-ties for a jointly owned unit share responsibility for it in their bias settings. Fixed schedules for JOU require host BA to include total response for them in their bias setting. Frequency Bias and BA frequency response correct answer: BAs must maintain a frequency bias that is equal to or greater than the BA frequency response. If the frequency bias is less than the frequency response, A...
  • Classroom
    $8.99 More Info
NERC flashcard set Reliability coordinator (RC) 220 questions| with complete solutions
  • Exam (elaborations)

    NERC flashcard set Reliability coordinator (RC) 220 questions| with complete solutions

  • What entity balances generation and monitors/employs contingency reserves? correct answer: Balancing Authority (BA) What entity has the widest system view and is the "supervisor"? correct answer: Reliability coordinator (RC) What entity monitors transmission lines and operates tap-changers, breakers, capacitors, etc? correct answer: Transmission Operators (TOP) What is a group of BAs that have agreements to help cover each other's reserve and regulation requirements? correct answe...
  • Classroom
    $12.99 More Info
NERC Reliability Standard numbers and titles.
  • Exam (elaborations)

    NERC Reliability Standard numbers and titles.

  • BAL-001-0.1a correct answer: Real Power Balancing Control Performance BAL-STD-002-0 correct answer: Operating Reserves (WECC) BAL-003-0.1b correct answer: Frequency Response and Bias BAL-004-0 correct answer: Time Error Correction BAL-004-WECC-01 correct answer: Automatic Time Error Correction BAL-005-0.1b correct answer: Automatic Generation Control BAL-006-2 correct answer: Inadvertent Interchange COM-001-1.1 correct answer: Telecommunications COM-002-2 correct ...
  • Classroom
    $6.99 More Info
NERC text 130 questions with complete solutions
  • Exam (elaborations)

    NERC text 130 questions with complete solutions

  • Operating reserve may be provided by which of the following? A. LTCs B. Capacitor banks C. Voltage regulators D. Interruptible loads correct answer: D. Interruptible loads Which of the following is the responsibility of a reserve sharing group (RSG)? A. Complying with DCS as if it was a single control area B. Proving regulation service for neighboring RSGs C. Ensuring each control area in the group maintains 50% blackstart capability D. Complying with the control performance standard...
  • Classroom
    $9.99 More Info
NERC RC TEST 64 QUESTIONS WITH COMPLETE SOLUTIONS
  • Exam (elaborations)

    NERC RC TEST 64 QUESTIONS WITH COMPLETE SOLUTIONS

  • System studies identify what correct answer: Predict operations and identify constraints If ACE remains the same and frequency goes up what has happened? correct answer: Someone lost load When a generator has its AVR in service it is a? correct answer: Dynamic source of reactive power Black start resource testing is done every? correct answer: 3 years Each BA shall operate its AGC on? correct answer: Tie line Frequency Bias When is voltage reduction reportable? correct answer...
  • Classroom
    $5.99 More Info
NERC Flashcards| 97 QUESTIONS| WITH COMPLETE SOLUTIONS
  • Exam (elaborations)

    NERC Flashcards| 97 QUESTIONS| WITH COMPLETE SOLUTIONS

  • EDE - Energy Deficient Entity Ime - meter error DCS - Disturbance Control Standard DFRs - Digital Fault Recorder LOFT - Linear on the fly testing SCADA - Supervisory Control and Data Acquisition EMS - Emergency Management System SPS - Special Protection Systems ACE - Area Control Error Fs - frequency Schedule RCIS - Reliability Coordinator Information System IDC - Interchange Distribution Calculator PSE - Purchasing Selling Entity NOAA - National Oceanic At...
  • Classroom
    $5.99 More Info
NERC-CIP v5 Standards
  • Exam (elaborations)

    NERC-CIP v5 Standards

  • CIP-002 correct answer: BES Cyber System Categorization CIP-003 correct answer: Security Management Controls CIP-004 correct answer: Personnel and Training CIP-005 correct answer: Electronic Security Perimeter CIP-006 correct answer: Physical Security of BES Cyber Systems CIP-007 correct answer: System Security Management CIP-008 correct answer: Incident Reporting and Response Planning CIP-009 correct answer: Recovery Plan for BES Cyber Systems CIP-010 correct ans...
  • Classroom
    $4.99 More Info
Nerc Test| 88 QUESTIONS| WITH COMPLETE SOLUTIONS
  • Exam (elaborations)

    Nerc Test| 88 QUESTIONS| WITH COMPLETE SOLUTIONS

  • According to Nerc Standards, an emergency interchange transaction can be exempt from tagging if it is less than_________________ correct answer: 60 minutes A BA or LSE that requests an EEA 3 must complete and EEA 3 report and submit it to the RC within how many days correct answer: 2 business days During restoration efforts load pick-ups should not exceed_____________ percentage of synchronized generation capacity correct answer: 5% What are the two components that a system operator ...
  • Classroom
    $8.99 More Info
NERC TOP System Operations| 74 QUESTIONS| WITH COMPLETE SOLUTIONS
  • Exam (elaborations)

    NERC TOP System Operations| 74 QUESTIONS| WITH COMPLETE SOLUTIONS

  • At what torque angle of operation does power typically begin to flow from the generator to the system? A) 90 degrees B) 60 degrees C) 30 degrees D) 10 degrees correct answer: 10 degrees Choose the answer that best describes the operation of a rotor. A) The stationary part of the transmission system. B) A type of superconductor. C) The stationary element of a generator that has its windings connected to the system. D) The excited (energized) field winding that rotates inside the...
  • Classroom
    $10.99 More Info
My NERC TEST 1| 125 QUESTIONS| WITH COMPLETE SOLUTIONS
  • Exam (elaborations)

    My NERC TEST 1| 125 QUESTIONS| WITH COMPLETE SOLUTIONS

  • A misoperation occurred when an overhead ground wire on a 230KV transmission line between two substations broke and fell across A phase of the line. One of the line circuit breakers failed to open causing the breaker failure relay to pick up and as a result tripped the entire substation bus off line that the failed circuit breaker was feeding off of. Who is charged with the responsibility to develop procedures to ensure misoperations are reviewed and analyzed to determine proper mitigation plans...
  • Classroom
    $10.99 More Info
NERC Pre test| 83 QUESTIONS| WITH COMPLETE SOLUTIONS
  • Exam (elaborations)

    NERC Pre test| 83 QUESTIONS| WITH COMPLETE SOLUTIONS

  • component of an electrical power system that can function as a motor or as a VAR generator is called a: correct answer: Synchronous condenser What are examples of measuring devices in system protection? correct answer: Current transformers, potential transformers, coupling capacitance voltage transformers. If the load on a three phase system is balanced equally among the phases, how much current will flow on the neutral point? correct answer: neutral current will be zero What are the...
  • Classroom
    $8.99 More Info
NERC SOS quiz| 326 questions| WITH COMPLETE SOLUTIONS
  • Exam (elaborations)

    NERC SOS quiz| 326 questions| WITH COMPLETE SOLUTIONS

  • If a Balancing Authority does not comply with the Control Performance Standard, the Balancing Authority is not permitted to provide which of the following for any other Balancing Authority entities? correct answer: Regulation of other services related to control performance 1. It is the obligation of each Balancing Authority to fulfill its commitment to the Interconnection and not ________ the other balancing Authorities in the Interconnection correct answer: Burden A Balancing Authority...
  • Classroom
    $12.99 More Info
NERC Test | 222 Questions| WITH COMPLETE SOLUTIONS
  • Exam (elaborations)

    NERC Test | 222 Questions| WITH COMPLETE SOLUTIONS

  • What percentage of load gives a 1 Hz change in an island condition? correct answer: 6-10% (Think 6-10 day island vacation) If ACE is Zero but system Hz is off, what should a system operator do? correct answer: Nothing! ACE bias and interchange schedule will improve frequency If ACE is Zero, why not adjust generation to help frequency? correct answer: Could overload equipment, this is a NERC violation When restoring from blackout condition, what should be done with load? correct answe...
  • Classroom
    $12.99 More Info
Make study stress less painful
Study stress? For sellers on Stuvia, these are actually golden times. KA-CHING! Earn from your study resources too and start uploading now.