DBIA

Rasmussen College

Here are the best resources to pass DBIA. Find DBIA study guides, notes, assignments, and much more.

All 7 results

Sort by

DBIA Exam 2: DBIA Exam 2 Study Guide: Questions & Answers: Guaranteed A+ Guide: Updated
  • DBIA Exam 2: DBIA Exam 2 Study Guide: Questions & Answers: Guaranteed A+ Guide: Updated

  • Exam (elaborations) • 32 pages • 2025
  • Available in package deal
  • What are the 5 main stages of DB Leadership? (Ans- 1. Project team formation and alignment. 2. Project pursuit and procurement. 3. Design integration and advancement. 4. Construction. 5. Closeout and Commissioning. _____ must manage the entire process (Ans- Design-Builders What does IDWP stand for? (Ans- Integrated Design Work Plan Which phase commitments sets the stage for Integrated Project Leadership and Design-Build Process Control? (Ans- Proposal Phase CommitmentsThe Constructi...
    (0)
  • $9.00
  • + learn more
DBIA EXAM 3: DBIA EXAM 3 Study Guide: Questions & Answers: Updated Solution
  • DBIA EXAM 3: DBIA EXAM 3 Study Guide: Questions & Answers: Updated Solution

  • Exam (elaborations) • 34 pages • 2025
  • Available in package deal
  • What are 2 examples of privity of contract needed to sue a party for economic losses? (Ans- 1. delay damages 2. Cost to correct defects Application is determined on a state-by-state basis (not valid in all states) True or False? (Ans- True The Economic Loss Doctrine is applicable to personal injury. True or False. (Ans- False The _____ has a professional standard of care. (Ans- DesignerThe _____ has the duty to build what is in the plans and specs. (Ans- Builder The _____ assumes ...
    (0)
  • $8.99
  • + learn more
DBIA Exam 1: Questions & Answers: Guaranteed A+ Score Guide: Updated
  • DBIA Exam 1: Questions & Answers: Guaranteed A+ Score Guide: Updated

  • Exam (elaborations) • 37 pages • 2025
  • Available in package deal
  • What best describes: "How team members are organized?" (Ans- Project Delivery Systems What best describes "How team members are selected?" (Ans- Procurement Method What best describes "How team members are paid?" (Ans- Contracting Approach List 4 examples of procurement methods. (Ans- - QBS - Best Value - Low Price - Sole source List 5 examples of contracting approach. (Ans- - fixed price - GMP- Cost reimbursement - Target price - unit price In developing acqu...
    (0)
  • $8.50
  • + learn more
DBIA Practice Exam:DBIA:DBIA Exam Questions & Answers: Latest Updated:
  • DBIA Practice Exam:DBIA:DBIA Exam Questions & Answers: Latest Updated:

  • Exam (elaborations) • 24 pages • 2025
  • Available in package deal
  • building information modeling (BIM) (Ans- The digital, three-dimensional modeling of building systems, with the linking of model components to a database of properties and relationships. Allows real-time sharing of design evolution, drives early decision-making, defines expectations for design phase deliverables, enables implementation of additional uses for the database interdisciplinary design charrettes (Ans- thinking out loud together, both-and thinking promotes innovation, greater d...
    (0)
  • $8.99
  • + learn more
DBIA Certification Exam Study Guide: Latest Updated: Questions & Answers
  • DBIA Certification Exam Study Guide: Latest Updated: Questions & Answers

  • Exam (elaborations) • 20 pages • 2025
  • Available in package deal
  • main qualification or determining factor (Ans- ability to collaborate and emphasize teamwork Shortlisting (Ans- takes the best of "qualified" teams; a key to design-build success; not the same as prequalifying or pass/fail; keeping this small increases interest among the best teams and minimizes procurement costs for everyone including the owner procurement implementing technique #2(f) (Ans- owners who require project specific technical submittals should - use two-phase procuremen...
    (0)
  • $8.50
  • + learn more
DBIA Exam: DBIA Exam Study Guide: Questions & Answers: Updated Solution
  • DBIA Exam: DBIA Exam Study Guide: Questions & Answers: Updated Solution

  • Exam (elaborations) • 47 pages • 2025
  • Available in package deal
  • Professional Liability (E&O) Insurance (Ans- - obtained by A/E - claims made vs. occurrence - renews yearly - covers risk of liability for negligent act, E or O in performance of professional services, economic losses and BI/PD, legal defense - contractors’ contingent and project policies also available - erosion of policy limits for prior claims and attorneys' fees Professional Liability may cover (Ans- - 3rd party damages as result of negligence - economic losses - redesign ...
    (0)
  • $8.99
  • + learn more