CPIM
Latest uploads at CPIM. Looking for notes at CPIM? We have lots of notes, study guides and study notes available for your school.
-
147
- 0
-
12
All courses for CPIM
-
CPIM 147
Latest content CPIM
CPIM Part 1 Module 5 Summary and elaborations 
 
inventory *** Those stocks or items used to support production (raw materials and work-in-process items), supporting activities (maintenance, repair, and operating supplies) and customer service (finished goods and spare parts). Demand for inventory may be dpendent or independent. Inventory functions are anticipation, hedge, cycle (lot size), fluctuation (safety, buffer, or reserve), transportation (pipeline), and service parts 
 
Inventory Ma...
- Summary
- • 21 pages's •
-
CPIM•CPIM
CPIM Part 1 Module 4 Summary notes 
supplier *** 1) provider of goods or services 2) seller with whom the buyer does business, as opposed to vendor, which is a generic term referring to all sellers in the marketplace 
 
purchasing *** The term used in industry and management to denote the function of and the responsibility for procuring materials, supplies, and services. 
 
procurement *** The business functions of procurement planning, purchasing, inventory control, traffic, receiving,...
- Summary
- • 5 pages's •
-
CPIM•CPIM
APIC'S CPIM Part 1 Post Test |Complete Questions with A+ Graded Answers 
In addition to customer orders, the master production schedule (MPS) might handle which of the following types of demand? 
Bill-of-material items 
Interplant orders 
Dependent demand 
Parts list items 
Interplant orders: Interplant demand is usually handled by the master production scheduling system in a manner similar to customer orders. 
 
 
A shipment of remote control components is delivered to a factory and immediatel...
- Exam (elaborations)
- • 11 pages's •
-
CPIM•CPIM
CPIM PostTest, Practice Exam 1 & Practice Exam 2 Compiled Questions And Answers Graded A+ 
What type of demand inventory ordering model includes fixed reorder cycles, fixed reorder quantities, optional replenishment, and hybrid models? 
 
Material requirements planning 
Kanban 
Drum-buffer-rope 
Independent 
Independent 
 
independent demand inventory ordering models include fixed reorder cycles, fixed reorder quantities, optional replenishment, and hybrid models, among others. Dependent demand...
- Exam (elaborations)
- • 15 pages's •
-
CPIM•CPIM
APICS/CPIM EXAM 1 COMPLETE QUESTIONS WITH CORRECT ANSWERS. 
t/f: ERP systems coordinate multiple databases used to gather and maintain the firm's essential data 
false 
 
 
Which of the following are aspects of ERP systems? 
1. Multifunctional- able to provide data concerning many parts of the firm 
2. Modular- able to combine selected components into a single system 
3. Independent- each functional area has its own system and data and maintains control of that system and data 
1 and 2 
 
 
ERP...
- Exam (elaborations)
- • 11 pages's •
-
CPIM•CPIM
APICS CPIM Part 1 Section A Q & A With A+ Graded Answers 
Which of the following is a planned series of actions or operations that advances a material or procedure from one stage of completion to another? 
 
work-in-process. 
 
task. 
 
process. 
 
project. 
C. process 
 
 
Which of the following entities or conditions impacts demand by providing expectations that products will be sold at a fair price, that higher quality is required, that delivery lead time is negligible, that before- and after...
- Exam (elaborations)
- • 11 pages's •
-
CPIM•CPIM
CPIM1 Section A (Quiz A Practice) Quizzes & Complete Answers 
Simultaneous engineering 
A company is seeking to design a new product as a low-cost manufacturer. Which of the following design methods brings product and process design groups together to achieve this objective? 
 
 
How can the objectives of marketing be met while also considering other stakeholder objectives? 
Marketing and production objectives can be met with higher inventories. 
 
 
qualifier 
The price for a product must fall ...
- Exam (elaborations)
- • 4 pages's •
-
CPIM•CPIM
CPIM1 Section C |Complete Questions with A+ Graded Answers 
Which of the following situations is an example of common cause or chance variation? 
The humidity in a room varies from one day to the next. 
 
 
Which of the following terms is associated with the systematic use of techniques that identify a required function, establish a value for that function, and finally provide that function at the lowest overall cost? 
Value analysis 
 
 
What is the term for an acceptable departure from a targe...
- Exam (elaborations)
- • 4 pages's •
-
CPIM•CPIM
CPIM (CPIM) EXAM|Complete Questions with A+ Graded Answers 
Repetitive Manufacturing 
Repetitive manufacturing is dedicated to a single product or a small range of products, where products are passed through the same sequence of operations. 
 
 
Which are primary activities in manufacturing planning and control? 
Production planning and inventory management 
 
 
Which of the following is a framework for organizing, defining, and standardizing the business processes necessary to effectively plan ...
- Exam (elaborations)
- • 9 pages's •
-
CPIM•CPIM
APICS CPIM Exam Part 2|Complete Questions with A+ Graded Answers 
1. Describe problem 2. Establish cause categories 3. identify causes 4. prioritize causes 
Steps to identify Root Cause 
 
 
can use finite capacity planning 
how APS is different from traditional PS 
 
 
demand-pull originates with the customer 
lean production methods 
 
 
all inventories decrease 
with total quality management 
 
 
master planning 
DRP should directly interface with 
 
 
senior management to influence the aggre...
- Exam (elaborations)
- • 2 pages's •
-
CPIM•CPIM
APICS CPIM Part 1, Module 5|Complete With A+ Graded Answers 
Inventory on the balance sheet at the end of the last year was $5,000,000. Inventory at the end of this year was $4,000,000. Last year's annual cost of goods sold (COGS) was $3,000,000. This year's annual COGS was $2,300,000. What is this year's inventory turnover? 
0.511 times 
 
EXPLANATION: 
Inventory Turnover = Annual COGS/Average Inventory in Dollars. Average Inventory = (Inventory at Period Start + Inventory at Period End)/2. ...
- Exam (elaborations)
- • 10 pages's •
-
CPIM•CPIM
APICS CPIM Exam Part 2 Module 2 
decoupling point 
point at which inventory is stored, which allows supply chain to operate independently 
 
 
mass customization 
creation of high volume product with large variety where customers can choose an exact model out of a large pool of possible end items 
 
 
least squares method 
selects a line of best fit through a plot of data to minimize the sum of square of the deviations 
 
 
multiple regression model 
an equation that describes the relationship b...
- Exam (elaborations)
- • 3 pages's •
-
CPIM•CPIM
APIC's CPIM Part 1 Practice Exams Questions With 100% Correct Answers. 
The ability of a company to address the needs of and inquiries and requests from customers refers to: 
on-time delivery. 
customer service. 
order fill rates. 
customer relationship management. 
customer service.: Customer service is the ability of a company to address the needs of and inquiries and requests from customers. 
 
 
Which of the following is included in the cost of goods sold? 
Standard cost 
General and admini...
- Exam (elaborations)
- • 21 pages's •
-
CPIM•CPIM
CPIM Part 1 Formulas 
Break-Even in Units 
(Fixed Cost)/(Price per Unit - Variable Cost per Unit) 
 
 
Deseasonalized Demand 
(Period Average Demand)/(Seasonal Index) 
 
 
Period Seasonal Index 
(Period Average)/(Combined Period Average) (Ex: Quarter Avg / Year Avg) 
 
 
Moving Average Forecast 
(Sum of Demand for Most Recent Set of Periods)/(Number of Periods) 
 
 
Exponential Smoothing Forecast 
(αLast Demand)+((1-α)Last Forecast) 
 
 
Mean Absolute Deviation (MAD) 
(Σ |Actual - Forecast|)/...
- Exam (elaborations)
- • 1 pages's •
-
CPIM•CPIM
CPIM Part 1 Formulas 
Planned Backlog 
Previous Planned Backlog + Planned Input - Planned Output 
 
 
Actual Backlog 
Previous Actual Backlog + Actual Input - Actual Output 
 
 
Throughput Formula 
Revenues Received - Variable Costs/ Units of Time Period 
 
 
New Safety Stock 
Old Safety Stock x √New Lead Time/Old Lead Time 
 
 
Demand During Lead Time 
Units per Period x Lead Time 
 
 
Takt Time 
Available Production Time/Rate of Customer Demand 
 
 
Cycle Time Formula 
Process Time/Operators...
- Exam (elaborations)
- • 4 pages's •
-
CPIM•CPIM
CPIM EXAM PART 1 REVIEW QUESTIONS & ANSWERS GRADED A+ 
The most common sequence for processing products in a supply chain is: 
 
A. supplier, manufacturer, customer. 
B. manufacturer, customer, supplier. 
C. distributor, retailer, supplier. 
D. retailer, supplier, manufacturer. 
A. supplier, manufacturer, customer. 
 
 
Which of the following terms pertains to the design, planning, execution, control, and monitoring of supply chain activities with the objective of creating net value, building a ...
- Exam (elaborations)
- • 108 pages's •
-
CPIM•CPIM
APICS CPIM Part 2-2024 
 14 Points -ANS-W. Edwards Deming's 14 management practices to help companies increase their quality and productivity 
 
A3 Method -ANS-A means of compactly describing a business process 
 
Abnormal Demand -ANS-Demand in any period that is outside the limits established by management policy 
 
Absorption Costing -ANS-An approach to inventory valuation in which variable costs and a portion of fixed costs are assigned to each unit production. 
 
Acceptable Quality Level (A...
- Package deal
- Exam (elaborations)
- • 44 pages's •
-
CPIM•CPIM
-
CPIM 2024• By Blessedmercy
CPIM $ 2024 
Material Requirements Planning (MRP) -ANS-A set of techniques that uses bill of material data, inventory data, and the master production schedule to calculate requirements for materials. 
 
Bill of Materials (BOM) -ANS-A listing of all of the assemblies, subassemblies, parts, and raw materials needed to produce one unit of a product 
 
parent item -ANS-Item produced from one or more components 
 
Single-level BOM -ANS-A display of components that are directly used in a parent item. ...
- Package deal
- Exam (elaborations)
- • 33 pages's •
-
CPIM•CPIM
-
CPIM 2024• By Blessedmercy
CPIM Practice Questions 2024 
Creating an extensive distribution system in order to reduce shipment time to customers conflicts with which of the following objectives? -ANS-Lowest distribution costs 
 
Which is set up when a product is available from several sources but only one source gets all of the business? -ANS-Single-Source Supplier 
 
Which originated with the department or person who will be the ultimate user -ANS-Purchase requisition 
 
Which of the following provides insight into why t...
- Package deal
- Exam (elaborations)
- • 33 pages's •
-
CPIM•CPIM
-
CPIM 2024• By Blessedmercy
CPIM Part 2 - 2024 
ABC CLassification -ANS-The classification of a group of items in decreasing order of annual dollar volume or other criteria 
 
Advanced Planning and Scheduling (APS) -ANS-Techniques that deal with analysis and planning of logistics and manufacturing during short, intermediate, and long-term time periods 
 
Advance ship notice (ASN) -ANS-An electronic data interchange (EDI) notification of shipment of product. 
 
Andon -ANS-A sign board with signal lights used to make workers...
- Package deal
- Exam (elaborations)
- • 62 pages's •
-
CPIM•CPIM
-
CPIM 2024• By Blessedmercy