AGILE
Latest uploads at AGILE. Looking for notes at AGILE? We have lots of notes, study guides and study notes available for your school.
-
112
- 0
-
8
All courses for AGILE
-
AGILE 112
-
Agile , 1
Latest notes & summaries AGILE
Agile is a concept that enables teams to move faster, be flexible, and respond to change. It was introduced in 2001 along with the Agile Manifesto, which outlines the values and principles of Agile processes.
- Summary
- • 3 pages's •
-
Agile•Agile
Preview 1 out of 3 pages
Agile is a concept that enables teams to move faster, be flexible, and respond to change. It was introduced in 2001 along with the Agile Manifesto, which outlines the values and principles of Agile processes.
Agile Safe 5.1 Final Exam LATEST Versions 
Questions AND Answers | Real Exam 
Questions AND Answers 
Agile Organizations should employ a dual operating system that includes 
a) A functional hierarchy and a value stream network 
b) Two value-oriented matrixed hierarchies 
c) A siloed vertical stream and a management network 
d) A flexible operations model and a developmental team construct - CORRECT 
ANSWER a) A functional hierarchy and a value stream network 
The Seven Core Competencies of B...
- Package deal
- Exam (elaborations)
- • 24 pages's •
-
Agile•Agile
-
Exam (elaborations) ATI Pharmacology Proctored EXAM 2023/2024• By GREATSTUDY
Preview 3 out of 24 pages
Agile Safe 5.1 Final Exam LATEST Versions 
Questions AND Answers | Real Exam 
Questions AND Answers 
Agile Organizations should employ a dual operating system that includes 
a) A functional hierarchy and a value stream network 
b) Two value-oriented matrixed hierarchies 
c) A siloed vertical stream and a management network 
d) A flexible operations model and a developmental team construct - CORRECT 
ANSWER a) A functional hierarchy and a value stream network 
The Seven Core Competencies of B...
AGILE SAFE 5.1 SPC TEST-WITH QUESTIONS AND VERIFIED 
CORRECT ANSWERS- LATEST 2022/2023 GRADED A+ 
AGILE SAFE 5.1 SPC TEST-WITH QUESTIONS AND VERIFIED 
CORRECT ANSWERS- LATEST 2022/2023 GRADED A+
- Exam (elaborations)
- • 44 pages's •
-
AGILE•AGILE
Preview 4 out of 44 pages
AGILE SAFE 5.1 SPC TEST-WITH QUESTIONS AND VERIFIED 
CORRECT ANSWERS- LATEST 2022/2023 GRADED A+ 
AGILE SAFE 5.1 SPC TEST-WITH QUESTIONS AND VERIFIED 
CORRECT ANSWERS- LATEST 2022/2023 GRADED A+
Agile Safe 5.1 Final Exam 2 LATEST Versions 
60+ Questions AND Answers 2022-2023| Real 
Exam Questions AND Answers
- Exam (elaborations)
- • 14 pages's •
-
AGILE•AGILE
Preview 2 out of 14 pages
Agile Safe 5.1 Final Exam 2 LATEST Versions 
60+ Questions AND Answers 2022-2023| Real 
Exam Questions AND Answers
Agile Test Questions and Answers with complete solution 
 
The maximum length of the Sprint Review (its time-box) is: 
4 hours for a monthly Sprint. For shorter Sprints it is usually shorter 
The length of a Sprint should be: 
Short enough to keep the business risk acceptable to the Product Owner; Short enough to be able to synchronize the development work with other business events; No more than one month 
The CEO asks the Development Team to add a "very important" item to a Sprint that is in...
- Exam (elaborations)
- • 2 pages's •
-
Agile•Agile
Preview 1 out of 2 pages
Agile Test Questions and Answers with complete solution 
 
The maximum length of the Sprint Review (its time-box) is: 
4 hours for a monthly Sprint. For shorter Sprints it is usually shorter 
The length of a Sprint should be: 
Short enough to keep the business risk acceptable to the Product Owner; Short enough to be able to synchronize the development work with other business events; No more than one month 
The CEO asks the Development Team to add a "very important" item to a Sprint that is in...
Agile Test Questions and Answers with complete solution 
 
The maximum length of the Sprint Review (its time-box) is: 
4 hours for a monthly Sprint. For shorter Sprints it is usually shorter 
The length of a Sprint should be: 
Short enough to keep the business risk acceptable to the Product Owner; Short enough to be able to synchronize the development work with other business events; No more than one month 
The CEO asks the Development Team to add a "very important" item to a Sprint that is in...
- Exam (elaborations)
- • 2 pages's •
-
Agile•Agile
Preview 1 out of 2 pages
Agile Test Questions and Answers with complete solution 
 
The maximum length of the Sprint Review (its time-box) is: 
4 hours for a monthly Sprint. For shorter Sprints it is usually shorter 
The length of a Sprint should be: 
Short enough to keep the business risk acceptable to the Product Owner; Short enough to be able to synchronize the development work with other business events; No more than one month 
The CEO asks the Development Team to add a "very important" item to a Sprint that is in...
Agile Test Questions and Answers with complete solution 
 
The maximum length of the Sprint Review (its time-box) is: 
4 hours for a monthly Sprint. For shorter Sprints it is usually shorter 
The length of a Sprint should be: 
Short enough to keep the business risk acceptable to the Product Owner; Short enough to be able to synchronize the development work with other business events; No more than one month 
The CEO asks the Development Team to add a "very important" item to a Sprint that is in...
- Exam (elaborations)
- • 2 pages's •
-
Agile•Agile
Preview 1 out of 2 pages
Agile Test Questions and Answers with complete solution 
 
The maximum length of the Sprint Review (its time-box) is: 
4 hours for a monthly Sprint. For shorter Sprints it is usually shorter 
The length of a Sprint should be: 
Short enough to keep the business risk acceptable to the Product Owner; Short enough to be able to synchronize the development work with other business events; No more than one month 
The CEO asks the Development Team to add a "very important" item to a Sprint that is in...
Agile Practice Questions And Answers (Answered) With Rationale 2022/2023 
 
A smart phone manufacturer is re-assessing its product development methods in response to a sharp increase in user complaints. Analysis of the complaints indicates that the users try to use some features in ways that designers did not anticipate.Given these findings, which agile practice would most effectively prevent the problem? 
Select one: 
a. Smoke Testing 
b. Acceptance Test-Driven Development 
c. Red, green, refac...
- Exam (elaborations)
- • 28 pages's •
-
Agile•Agile
Preview 3 out of 28 pages
Agile Practice Questions And Answers (Answered) With Rationale 2022/2023 
 
A smart phone manufacturer is re-assessing its product development methods in response to a sharp increase in user complaints. Analysis of the complaints indicates that the users try to use some features in ways that designers did not anticipate.Given these findings, which agile practice would most effectively prevent the problem? 
Select one: 
a. Smoke Testing 
b. Acceptance Test-Driven Development 
c. Red, green, refac...
1-	What does NOT match with Agile Manifesto? 
□	Process and tools over individuals and interactions 
□	Working software over comprehensive documentation 
□	Responding to change over following a plan 
□	Contract negotiation over customer collaboration 
 
 
2-	Which of the following statements about changing requirements in software development, are correct? 
□	In traditional way of software development, once the requirements are base lined, further changes should undergo heavy change co...
- Exam (elaborations)
- • 14 pages's •
-
agile•agile
Preview 2 out of 14 pages
1-	What does NOT match with Agile Manifesto? 
□	Process and tools over individuals and interactions 
□	Working software over comprehensive documentation 
□	Responding to change over following a plan 
□	Contract negotiation over customer collaboration 
 
 
2-	Which of the following statements about changing requirements in software development, are correct? 
□	In traditional way of software development, once the requirements are base lined, further changes should undergo heavy change co...
Agile Practice Questions And Answers (Answered) With Rationale 2022/2023 
 
A smart phone manufacturer is re-assessing its product development methods in response to a sharp increase in user complaints. Analysis of the complaints indicates that the users try to use some features in ways that designers did not anticipate.Given these findings, which agile practice would most effectively prevent the problem? 
Select one: 
a. Smoke Testing 
b. Acceptance Test-Driven Development 
c. Red, green, refac...
- Exam (elaborations)
- • 28 pages's •
-
Agile•Agile
Preview 3 out of 28 pages
Agile Practice Questions And Answers (Answered) With Rationale 2022/2023 
 
A smart phone manufacturer is re-assessing its product development methods in response to a sharp increase in user complaints. Analysis of the complaints indicates that the users try to use some features in ways that designers did not anticipate.Given these findings, which agile practice would most effectively prevent the problem? 
Select one: 
a. Smoke Testing 
b. Acceptance Test-Driven Development 
c. Red, green, refac...