When using a circular saw, which of the following is correct?
A. Never start the cut until the blade is turning full rpm
B. The base is not adjustable for cutting depth
C. Circular saw blades range from 10 to 16 inches
D. Remove the retractable guard before cutting -correct answer a. Never start the cut
until the blade is turning full rpm
What is used to make crosscuts on a table saw?
A. Push stick
B. Rip fence
C. Miter gauge
D. Larger blade -correct answer c. Miter saw
When making crosscuts with a radial arm saw which statement is correct?
A. Push the wood slowly into the blade.
B. Restrain the blade from moving too fast.
C. Rotate and lock the blade parallel to the guide.
D. Adjust the blade 1/4" above to cutting surface -correct answer b. Restrain the
blade from moving too fast
What are the two things a compound mitre saw does best at the same time?
A. Moving it around and setting it up is fast.
, Final Exam Elevator (Latest
Update) Questions and Verified Answers
100% Correct {Grade A}
B. You can cut left and right at the same time.
C. Tilting the blade 45 degrees and pivoting the table 45 degrees gives you a 90
degree square cut.
D. Bevel and mitre cuts can be made at the same time -correct answer d. Bevel and
mitre cuts can be made at the same time
Why do we use laminated glass in the walls of glass elevator cabs?
A. If the glass breaks you can get a replacement at the hardware store.
B. If the glass cracks the plastic interlayer holds the fragments
C. It is made in a variety of colors
D. It is easy to handle and installs quickly -correct answer b. If the glass cracks the
plastic interlayer holds the fragments
Which of the following is not a step in preparing the walls before hanging panels?
A. Check walls for square and plumb
B. Mount handrails on the walls where the panels will be installed.
C. Clean surfaces and fill all holes not being used
D. Preheat walls as per specifications -correct answer b. Mount handrails on the walls
where the panels will be installed
When installing a resilient tile floor covering, there should be a layer of ________
between the underlayment and the tiles.
, Final Exam Elevator (Latest
Update) Questions and Verified Answers
100% Correct {Grade A}
A. Plywood
B. Grout
C. 15lb asphalt paper
D. Tile separators -correct answer c. 15 lb asphalt paper
While similar to laying resilient floor tiles, ceramic tiles require the additional steps of:
A. Grouting and sealing
B. Stress testing and certification
C. Glazing and firing
D. Marking and cutting -correct answer a. Grouting and sealing
Once you are satisfied with the layout of the tiles after a dry layout, remove them and
A. Stack them neatly in a location near the entrance
B. Adhere adjoining tile edges so the floor pattern won't be lost
C. Test each tile for durability
D. Lay them out in an adjacent area to maintain the floor pattern correctly. -correct
answer d.d lay them out in an adjacent area to maintain the floor pattern correctly
For carpet installation, if the cab area measures 94 inches by 62 inches and you need
an extra six inches added to each dimension to account for waste during cutting, how
many square yards of carpet do you need for this job?
A. 6.25
, Final Exam Elevator (Latest
Update) Questions and Verified Answers
100% Correct {Grade A}
B. 6
C. 5.5
D. 5.25 -correct answer d. 5.25
If suspended glass is used with lighting fixtures, the fixture must be
A. Positioned in the center of the dropped ceiling
B. Concealed behind a metal grid
C. Supported by a metal frame and securely fastened by at least 3 points
D. Flush with the surface of the ceiling -correct answer c. Supported by a metal frame
and securely fastened by at least 3 points
All cab modernization should be performed at what floor?
A. At the main lobby
B. Bottom floor
C. Top floor
D. Lowest landing -correct answer c. Top floor
To meed a.d.a. requirements, hall call buttons are centered at ____ above the finished
floor.
A. 36"
B. 42"
C. 48"