100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

ACI WRITTEN CERTIFICATION EXAMINATION TEST 2026 FULL SOLUTIONS GRADED A+

Rating
-
Sold
-
Pages
14
Grade
A+
Uploaded on
18-12-2025
Written in
2025/2026

ACI WRITTEN CERTIFICATION EXAMINATION TEST 2026 FULL SOLUTIONS GRADED A+

Institution
Course









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Course

Document information

Uploaded on
December 18, 2025
Number of pages
14
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

ACI WRITTEN FINAL PAPER 2026 COMPLETE
QUESTIONS AND VERIFIED ANSWERS GRADED
A+


◉ The temperature measuring device shall have a capacity or measuring
freshly mixed concrete to the nearest ________F. Answer: 1 degree


◉ The temperature measuring device shall be calibrated ________, or
whenever there is a question of its ____________________. Answer:
Annual, Accuracy


◉ The concrete temperature is read to the nearest ___________F.
Answer: 1 degree


◉ The temperature measuring device shall have a range of ______F to
_________F. Answer: 30,120


◉ The temperature may be measured in a wall form. Answer: True


◉ The temperature measuring device must remain in the concrete for a
minimum of? Answer: 2 minutes

, ◉ With large aggregate of 3" diameter the concrete temperature may
take up to twenty minutes to stabilize due to heat transfer from the
aggregate to the cement paste. Answer: True


◉ The maximum time allowable time in between obtaining the first and
final portion of a composite sample is? Answer: 15 minutes


◉ The minimum size of a composite sample required when strength
specimens are to be molded. Answer: 1 cf


◉ Sampling form a stationary mixer or revolving drum mixer, the batch
must be sampled at _____ or more regularly spaced intervals. Answer: 3


◉ The composite sample for a paving mixer must represent a minimum
of _____ different portions of the batch of concrete taken from the pile
after discharge. Answer: 5


◉ The test for slump, temperature, and air content must begin within
____ minutes after fabricating the composite sample. Answer: 5


◉ The sample should be combined and remixed before testing begins.
Answer: True


◉ Composite samples must be taken before any water is added. Answer:
False
$12.49
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
StudyMint

Get to know the seller

Seller avatar
StudyMint iam_jamal
Follow You need to be logged in order to follow users or courses
Sold
0
Member since
11 months
Number of followers
0
Documents
40
Last sold
-
StudyMint

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions