NACE CIP 2 - PRACTICE EXAM QUESTIONS & DETAILED CORRECT PASSED ANSWERS t is a study set designed to help students and professionals prepare for NACE-related certifications or coursework, most commonly in coating inspection, corrosion control, and protective coatings.

Show more Read less
Institution
NACE CIP 2
Course
NACE CIP 2










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NACE CIP 2
Course
NACE CIP 2

Document information

Uploaded on
December 13, 2025
Number of pages
26
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

NACE CIP 2 - PRACTICE EXAM
QUESTIONS & DETAILED CORRECT
PASSED ANSWERS

You are the NACE Coating Inspector on a tank lining project and are asked to perform a high
voltage holiday test after the coating applicators have completed their final repairs. After
meeting all the confined space entry permit you enter the tank and notice a very strong odor of
solvent Your first course of action should to:

a) Investigate to find the source of the odor

b) Don your air supplied respirator and continue the testing

c) Exit the tank immediately and report the problem to the nearest safety supervisor

d) Exit the tank and document the incident in your daily report - CORRECT ANSWER c) Exit the
tank immediately and report the problem to the nearest safety supervisor



You are working as an inspector in a galvanizing plant for the first time.

What are some of the hazards you need to be aware of:

a) Risk of chemical exposure

b) Risk of skin

c) Risk of acid or caustic splashes

d) a), b), and c) - CORRECT ANSWER d) a), b), and c)



You are working as the only in-house NACE Level 2 Inspector in a shop setting when an
independent 3d party NACE Level 3 Inspector, representing the owner, presents you with a copy
of a Non-Conformance Report (NCR) he has written for a NACE/SSPC SP 10 centrifugal blast
which you had previously approved.

Your FIRST preferred course of action is to:

a) Verbally challenge the NCR

,b) Request a re-blast of the item in question

c) Consult your supervisor

d) Review the NCR with the other Inspector - CORRECT ANSWER c) Consult your supervisor



An Inspection and Test Plan is required when:

a) It is always required

b) When the Coating Applicator requests one

c) When the Owner specifies one

d) When the Inspector requests one - CORRECT ANSWER a) it is always required



The Inspectors' goal at the Pre-Job Conference is to:

a) Obtain a clear understanding of the Specification

b) Discuss contractual requirements

c) Manage the meeting so it doesn't go off topic

d) Take accurate meeting minutes for distribution - CORRECT ANSWER a) Obtain a clear
understanding of the specification



Coating Surveys are legally required:

a) On commercial marine vessels and offshore platforms

b) On high pressure gas lines and fireproofed structures

c) On water tanks and potable water pipelines

d) On food and beverage vessels and can linings - CORRECT ANSWER a) On commercial marine
vessels and offshore platforms



Individuals conducting Coating Surveys should:

a) Always be NACE Level 3 Certified Inspectors

b) Always be NACE or SSPC Protective coating Specialists

, c) Always be experienced Specification Writers

d) Always be trained and experienced in the Coating Industry - CORRECT ANSWER d) Always be
trained and experienced in the Coating Industry



The cost of qualified Coating Inspection is normally offset by:

a) Lower Application Costs

b) Lower Coating Life Cycle Costs

c) Lower Safety Enforcement Costs

d) Lower Supervision Costs - CORRECT ANSWER b) Lower Coating Life Cycle Costs



You are a NACE Level 2 Coating Inspector who has just arrived on a job in progress where there
is no inspection and Test Plan (ITP). The first morning you arrive the job is behind schedule, and
you are asked to take DIY Film Thickness readings.

Your FIRST preferred course of action is to:

a) Refuse to take readings until an is in place

b) Develop your own methodology and proceed take the readings

c) Use a generally accepted industry standard and to take readings

d) Call your supervisor - CORRECT ANSWER c) Use a generally accepted industry standard and
to take readings



When conducting inspections, the Inspector should follow which standards:

a) NACE and SSPC standards in North America

b) ISO standards in Europe and Asia

c) Australian standards in Australia

d) The specified standards - CORRECT ANSWER d) The specified standards
$19.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
STUVIA2024
5.0
(1)

Get to know the seller

Seller avatar
STUVIA2024 Chamberlain College Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
4
Member since
7 months
Number of followers
0
Documents
4754
Last sold
1 week ago

5.0

1 reviews

5
1
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.