General Conditions - CORRECT ANSWER What is not included in the technical specification?
QUESTION : •contract
•specifications
•contract drawings - CORRECT ANSWER Bid documents include?
QUESTION : General Conditions - CORRECT ANSWER Codes, standards, Authority Having
Jurisdiction (AHJ), clean-up, safety requirements, barricades, fencing, insurance and bond requirements, ect.
QUESTION : Supplementary Conditions - CORRECT ANSWER Addendums, time schedules, working
days allowed, delay agreements, payment schedules
QUESTION : Construction Specifications Institute (CSI) - CORRECT ANSWER Specifications
typically use what format?
QUESTION : Contractors - CORRECT ANSWER Construction manager concept is when the owner
contracts with the construction manager who oversees ____________ working on the project
QUESTION : Design-Build Concept - CORRECT ANSWER Sometimes referred to as a turn-key type
agreement or contract?
QUESTION : general contractor - CORRECT ANSWER Multiple Prime Contractor Method has the
intent is eliminate the middleman __________ __________.
QUESTION : •architectural/structural contractor
2026 2027 GRADED A+
,2|Page
•mechanical contractor
•electrical contractor - CORRECT ANSWER Multiple prime contractor method involve more than one
prime contractor which consist of?
QUESTION : •federal government
•general services administration (GSA)
•large companies - CORRECT ANSWER Who commonly uses the multiple prime contractor method?
QUESTION : Owner, architect, general contractor, subcontractor - CORRECT ANSWER Traditional
method contract uses the typical chain of command which is?
QUESTION : •open bid method
•bid-by invitation procedure
•direct contractor selection - CORRECT ANSWER General contractors can be chosen in a number of
different ways which is?
QUESTION : General category and supplementary conditions - CORRECT ANSWER Contract
conditions is divided into two categories which is?
QUESTION : Addendum - CORRECT ANSWER Changes to the contract or other modifications.
QUESTION : •up-front payments
•progress payments
•lump sum - CORRECT ANSWER Types of payment schedules are?
QUESTION : Bidding requirements, sample forms, conditions of the contract and specifications, including
general conditions and supplementary conditions - CORRECT ANSWER What comprises the project
manual?
2026 2027 GRADED A+
, 3|Page
QUESTION : •contract itself
•contract conditions
•specifications
•drawings - CORRECT ANSWER Contract documents include:
QUESTION : Preliminary, bid, approval, construction, as-built - CORRECT ANSWER Drawings have
different stages which are?
QUESTION : Request for proposal (RFP) - CORRECT ANSWER Oftentimes a project will begin with
a _________.
QUESTION : •certified value specialist
•owner's representatives
•designers and consultants
•the construction team
•cost estimator
•building management staff
•third-party (independent) reviewers - CORRECT ANSWER Value-engineering team typically consist
of?
QUESTION : •Information gathering
•brainstorming
•analysis
•development
•recommendations - CORRECT ANSWER Value-engineering typically goes through phases which are?