A crane is needed to hoist controllers on to the roof. Who is responsible for making
the lift plan? - answer>>>lift director
During elevator install you need to rig equipment to the top of the building. What
info must be included in the lift plan? - answer>>>capacity of rigging material
The crane operator is awaiting you signals to lift a pallet of parts. What are the
correct audible signals to raise the load 20 feet? - answer>>>hoist, hoist up,
20,15,10,1, hoist stop
You are storing fiber core wire rope slings. What could cause damage to the core
material? - answer>>>solvents
You are selecting a wire rope sling to rig 1000lbs. What safety factor does asme
require? - answer>>>5:1
There could be unapparent wear in the slings you must use for hoisting. What sling
rating take this into account? - answer>>>rated load
Where is the best place to store natural fiber hoisting rope - answer>>>open sided
crate
You have installed a power winch at the first floor preparing to hoist equipment. The
hoist rope passes over a single sheave on the hoist beam making a direct pick. What
is the downward force that a 3000lb load will exert on the overhead hoist beam? -
answer>>>6k lbs
, -
You are preparing to use a chainfall to lift a load up a hoistway. What safety
equipment is required on each of the two hooks on the chain fall? - answer>>>tags
Who can give the command to stop a hoist? - answer>>>anyone
Which safety feature protects against getting caught under a counterweight? -
answer>>>counterweight guard
You are installing a 250 fpm freight elevator. What type of buffers should you use? -
answer>>>oil buffers
You are working in a pit deeper than normal. What can you do to bring the buffers
up to the proper height? - answer>>>buffer stands
What document will tell you if you need buffer channels? - answer>>>final layout
When installing a reduced stroke buffer, what additional component is required? -
answer>>>speed limiting device
You just attached a governor tension sheave to a rail. What must be done to finalize
its position? - answer>>>check for plumb and tighten all bolts.
You are installing pit equip for a high rise elevator. Which of the following is required
for an 800 fpm car? - answer>>>compensating sheave tie down
You have installed the comp rope sheave. What must you do to prepare for comp
rope install? - answer>>>block the comp sheave above normal position
CORRECT ANSWERS LATEST 2026-2027 NEW VERSION
A crane is needed to hoist controllers on to the roof. Who is responsible for making
the lift plan? - answer>>>lift director
During elevator install you need to rig equipment to the top of the building. What
info must be included in the lift plan? - answer>>>capacity of rigging material
The crane operator is awaiting you signals to lift a pallet of parts. What are the
correct audible signals to raise the load 20 feet? - answer>>>hoist, hoist up,
20,15,10,1, hoist stop
You are storing fiber core wire rope slings. What could cause damage to the core
material? - answer>>>solvents
You are selecting a wire rope sling to rig 1000lbs. What safety factor does asme
require? - answer>>>5:1
There could be unapparent wear in the slings you must use for hoisting. What sling
rating take this into account? - answer>>>rated load
Where is the best place to store natural fiber hoisting rope - answer>>>open sided
crate
You have installed a power winch at the first floor preparing to hoist equipment. The
hoist rope passes over a single sheave on the hoist beam making a direct pick. What
is the downward force that a 3000lb load will exert on the overhead hoist beam? -
answer>>>6k lbs
, -
You are preparing to use a chainfall to lift a load up a hoistway. What safety
equipment is required on each of the two hooks on the chain fall? - answer>>>tags
Who can give the command to stop a hoist? - answer>>>anyone
Which safety feature protects against getting caught under a counterweight? -
answer>>>counterweight guard
You are installing a 250 fpm freight elevator. What type of buffers should you use? -
answer>>>oil buffers
You are working in a pit deeper than normal. What can you do to bring the buffers
up to the proper height? - answer>>>buffer stands
What document will tell you if you need buffer channels? - answer>>>final layout
When installing a reduced stroke buffer, what additional component is required? -
answer>>>speed limiting device
You just attached a governor tension sheave to a rail. What must be done to finalize
its position? - answer>>>check for plumb and tighten all bolts.
You are installing pit equip for a high rise elevator. Which of the following is required
for an 800 fpm car? - answer>>>compensating sheave tie down
You have installed the comp rope sheave. What must you do to prepare for comp
rope install? - answer>>>block the comp sheave above normal position