Ace your DBIA Exam 2 with this targeted guide, designed to
master the core principles of Design-Build project delivery,
procurement, and contract management. This resource delivers
scenario-based practice questions covering team selection, risk
allocation, and integrated project planning.
_____ _____ is the belief that there is a technique, method or
process that is more effective at delivering a particular
outcome than any other ...... ANSWER ....... Best
Practice
What are the 4 Trend Management tools? ...... ANSWER
....... 1. Notice
2. Estimate
3. Register
4. Log
, Page 2 of 35
Any changes to the Owner's project criteria, even if no cost
or time is impacted, must be _____. ...... ANSWER .......
documented
_____ balances work and recognition. ...... ANSWER .......
Teaming
How can DB be expedited? ...... ANSWER ....... with
Incremental Design Packages
Preliminary Architectural MEP Packages: Balance _____ -
meetings during design phase are co-located. ......
ANSWER ....... Time
Final Architectural MEP Package: Balance _____ of _____
with activity on site. ...... ANSWER ....... - completion
- drawings
DB can optimize _____ achievements by encouraging
innovation. ...... ANSWER ....... Sustainability
, Page 3 of 35
Energy efficiency is commonly high valued by _____. ......
ANSWER ....... Owners
Guarantee of performance through warranty period
improves _____. ...... ANSWER ....... value
The Owner and the Design-Builder should acknowledge the
significant level of effort required to manage _____ and ____
of the design. ...... ANSWER ....... - development
- review
_____ verifies that the design complies with performance
requirements in the RFP. ...... ANSWER .......
Substantiation
All parties must be very clear about what constitutes "_____
_____" ...... ANSWER ....... "Design Commitment"
_____ _____ is the part of quality management focused on
providing confidence that project quality requirements
defined in the RFP will be fulfilled. ...... ANSWER .......
Quality Assurance
, Page 4 of 35
_____ _____ is the part of quality management focused on
actually fulfilling the project quality requirements defined in
the RFP. ...... ANSWER ....... Quality Control
_____ _____ assures quality will be provided satisfactorily.
...... ANSWER ....... Quality Assurance
_____ _____: Controls quality of production, be it design or
construction. ...... ANSWER ....... Quality Control
The _____ establishes and communicates QA & QC
objectives. ...... ANSWER ....... Owner
The Design-Builder provides _____ _____ as the "eyes and
ears" of the Owner. ...... ANSWER ....... Quality
Assurance
Quality _____ is usually done by another design professional.