2025/2026 DBIA EXAM 1 WITH CURRENTLTY
COMPLETE TESTING QUESTIONS AND DETAILED
CORRECT ANSWERS/GUARANTEED PASS/TOP-
RATED A+.
DBIA
Ace your DBIA Exam 1 with this targeted guide, designed to
master the core principles of Design-Build project delivery,
procurement, and contract management. This resource delivers
scenario-based practice questions covering team selection, risk
allocation, and integrated project planning.
Purpose Statement: DBIA is the only organization that _____ ,
_____, and _____ best practices in design-build project
delivery. ...... ANSWER ....... - defines
- teaches
- promotes
Which delivery method gives early knowledge of the project
cost? ...... ANSWER ....... DB
In DB, the Owner's exposure to _____ is significantly
reduced. ...... ANSWER ....... claims
, Page 2 of 40
What is the Single Point of Responsibility Risk? ......
ANSWER ....... one of the main concerns for
practitioners using DB
What does EPC stand for? ...... ANSWER ....... Engineer -
Procure - Construct
_____ is a delivery system that is for ALL practical purposes
DB ...... ANSWER ....... EPC
EPC is a term used by _____ and _____ generation sectors.
...... ANSWER ....... - industrial
- power
In EPC, systems and performance testing are central to
_____. ...... ANSWER ....... scope
The EPC contractor will typically perform engineering with
its _____ _____. ...... ANSWER ....... in-house staff
_____ _____ selection criteria are price and non-price
factors. ...... ANSWER ....... Best Value
, Page 3 of 40
A Common feature of Best Value: Price proposals opened
_____ evaluation and scoring of technical proposals. ......
ANSWER ....... AFTER
Best Value Weighted Criteria: _____ Score is determined
from multiple criteria and weighted scoring. ...... ANSWER
....... Technical
Best Value Weighted Criteria: _____ Score awards full points
to lowest price and assign points proportionally to the other
proposers. ...... ANSWER ....... Price
Best Value Weighted Criteria: _______ for _____ is the highest
total score. ...... ANSWER ....... Basis for Award
What are the 3 common features of Best Value? ......
ANSWER ....... - Weighted Criteria
- Price Technical Trade off
- DB to Budget/Stipulated Price.
, Page 4 of 40
_____ identifies project budget. ...... ANSWER .......
RFP
What does LPTA stand for? ...... ANSWER ....... Lowest
Price Technically Acceptable
Which procurement method gets limited use and is
essentially non-competitive? ...... ANSWER ....... Sole
Sourcing
What are the 2 categories of contract incentives? ......
ANSWER ....... - Cost Incentives
- Award Fees
The purpose of ____ is to get highly qualified teams. ......
ANSWER ....... RFQ
The purpose of ___ is to communicate needs for firm pricing.
...... ANSWER ....... RFP
Key _____ are central to winning and executing a project.
...... ANSWER ....... personnel