100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

OPERATOR TEST 2025: 200 Exam Prep Questions with Verified Answers

Rating
-
Sold
-
Pages
409
Grade
A+
Uploaded on
04-12-2025
Written in
2025/2026

Ace your 2025 Operator certification with this definitive study guide. Download a PDF with 200 practice questions and correct, verified answers to effectively prepare and pass your exam on the first try.

Institution
Course











Whoops! We can’t load your doc right now. Try again or contact support.

Connected book

Written for

Course

Document information

Uploaded on
December 4, 2025
Number of pages
409
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

1|Page



CERTIFIED STORM WATER OPERATOR TEST 2025
WITH 200 EXAM PREP QUESTIONS AND CORRECT
VERIFIED ANSWERS/ CSWO EXAM 2025/ STORM
WATER OPERATOR CERTIFICATION EXAM (NEW!)


What are the three criteria to consider when determining
if storm water discharge coverage is needed under the
National Pollutants Discharge Elimination System
(NPDES) industrial storm water permits? -
..ANSWER...✓✓ 1. The industry is identified in the federal
storm water regulations by SIC code or narrative
description
2. There is a point source discharge of storm water to
surface waters of the state
3. There is a potential for exposure of industrial materials
or activities to storm water runoff


The industrial storm water certified operator should be
someone who is at the facility
_________________________________ - ..ANSWER...✓✓ On a
regular basis


The industrial storm water operator certificate is valid for
_____________ - ..ANSWER...✓✓ 5 years

,2|Page




Under natural conditions the majority of rain water that
falls to the ground
___________________________________________ -
..ANSWER...✓✓ Infiltrates the ground or evaporates


The introduction of pollutants to storm water most
commonly occurs when industrial facilities allow
operating procedures and industrial materials to
__________________________________ - ..ANSWER...✓✓
Become exposed to storm water


The best way to prevent contamination of storm water is
_______________________________ - ..ANSWER...✓✓ Through
pollution prevention


The highest percentage of pollutants in storm water
runoff occur in the first few minutes that storm water
runs off. This is called the
__________________________________ - ..ANSWER...✓✓ First
flush


Organic enrichment of storm water runoff from sources
such as food processing, airport deicing, antifreezes, and

,3|Page



sewage can provide a food source for bacteria in lakes
and streams. This can lead to
______________________________, which is a common cause
of fish kills. - ..ANSWER...✓✓ Oxygen depletion


The addition of __________________________________ to storm
water runoff can result in algal blooms and excessive
growth of aquatic plants in fresh water systems such as
lakes and streams. - ..ANSWER...✓✓ Phosphorus


Sediment is one of the most widespread pollutants in
surface water. Many _____________________________ attach
to finer sediment particles. Sediment can also be
destructive to aquatic systems by covering and damaging
habitat. - ..ANSWER...✓✓ Pollutants


If there is construction activity at an industrial facility that
disturbs one or more acres of land or the soil disturbance
is within 500 feet of a water body, the owner of the
property will need to apply for a
_____________________________. In addition if the soil
disturbance will become five or more acres in size the
property owner will need to submit the Notice of
Coverage application to the MDEQ, Water Bureau. -
..ANSWER...✓✓ Soil Erosion and Sediment Control

, 4|Page




The _____________________________________ is a document
that authorizes the discharge of storm water under a
general storm water permit. - ..ANSWER...✓✓ Certificate
of Coverage


_______________________________________ permits are site
specific and contain requirements such as regular
sampling, monitoring, end of pipe treatment or effluent
limits. - ..ANSWER...✓✓ Individual


________________________________ permits are not site
specific and contain the minimum requirements for
protecting water quality - ..ANSWER...✓✓ General


Industrial facilities are identified in the federal storm
water regulations by
__________________________________________________________
and narrative description. - ..ANSWER...✓✓ Standard
Industrial Classification (SIC) Code


A __________________________________ is any discernable,
confined, and discrete conveyance that discharges storm
water into surface waters. Examples include, but are not
$37.87
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
BESTSCORESS

Get to know the seller

Seller avatar
BESTSCORESS Teachme2-tutor
Follow You need to be logged in order to follow users or courses
Sold
1
Member since
2 months
Number of followers
1
Documents
3064
Last sold
1 month ago
BESTSCORES

Welcome to your one-stop destination for high-quality academic resources! Here you’ll find test banks, solution manuals, ATI study guides, iHuman case studies, nursing exam prep materials, and verified textbook answers — all carefully selected to help you study smarter and score higher. Whether you’re preparing for nursing exams, business courses, medical case studies, or general college tests, this store offers reliable, up-to-date materials used by top students worldwide. Popular categories include: ✅ Test Banks & Solution Manuals ✅ ATI & HESI Study Guides ✅ iHuman Case Studies & Answers ✅ NCLEX & Nursing Exam Prep ✅ Business, Accounting & Economics Test Banks ✅ Psychology, Biology & Anatomy Materials Boost your academic performance with expertly curated resources that match real exams and class content.

Read more Read less
0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions