Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 64 pages
Exam (elaborations)

MARYLAND HOME IMPROVEMENT EXAM STUDY GUIDE 2026 – COMPLETE CONCEPT REVIEW & PRACTICE MATERIALS (LATEST EDITION)

Document preview thumbnail
Preview 4 out of 64 pages

MARYLAND HOME IMPROVEMENT EXAM STUDY GUIDE 2026 – COMPLETE CONCEPT REVIEW & PRACTICE MATERIALS (LATEST EDITION)

Content preview

MARYLAND HOME IMPROVEMENT
EXAM STUDY GUIDE 2026 – COMPLETE
CONCEPT REVIEW & PRACTICE
MATERIALS (LATEST EDITION)
Maryland Home Improvement Exam Study Guide – Practice Questions

LAW & REGULATIONS (Questions 1-30)

1. What is the primary purpose of the Maryland Home Improvement Law (MHIL)?
A. To set minimum quality standards for building materials.
B. To guarantee the workmanship of all licensed contractors.
C. To ensure the financial reliability of contractors.
D. ✓ To protect consumers from unfair and deceptive trade practices.

2. Who must be licensed under the Maryland Home Improvement Law?
A. Only contractors who perform work valued over $25,000.
B. ✓ Any person or business that performs, offers, or sells home improvement work for a
price exceeding $1,000.
C. Only contractors who employ three or more people.
D. Only contractors performing structural modifications.

3. The Maryland Home Improvement Commission (MHIC) requires a licensed contractor to
maintain a surety bond in the minimum amount of:
A. $10,000
B. ✓ $20,000
C. $50,000
D. $100,000

4. A home improvement contract in Maryland is not legally valid unless it:
A. Is notarized.
B. ✓ Is signed by both the owner and the contractor before work begins or materials are
delivered.
C. Includes a detailed list of all subcontractors to be used.
D. Is approved by a local building inspector.

,5. The "cooling-off period" for a home improvement contract in Maryland gives the consumer
the right to cancel within:
A. 24 hours
B. ✓ 3 business days
C. 5 calendar days
D. 7 business days

6. Which of the following activities is generally EXEMPT from requiring an MHIC license?
A. Building a deck attached to a house.
B. Installing a new bathroom.
C. ✓ Performing work as an employee of a licensed contractor under their supervision.
D. Remodeling a kitchen.

7. Failure to comply with the MHIL can result in all the following EXCEPT:
A. Civil penalties and fines.
B. Suspension or revocation of license.
C. ✓ Automatic criminal felony charges.
D. Consumer restitution orders.

8. A change order is required when:
A. A subcontractor is replaced.
B. ✓ There is any change in the work, price, or time specified in the original contract.
C. The work takes more than 30 days.
D. The homeowner buys their own materials.

9. How long must a contractor maintain records of all home improvement contracts?
A. 1 year
B. 2 years
C. ✓ 3 years
D. 5 years

10. The MHIC Guaranty Fund may compensate an owner for losses caused by a licensed
contractor up to what maximum amount?
A. $10,000
B. ✓ $15,000
C. $20,000
D. The full contract amount

11. To file a claim against the Guaranty Fund, an owner must first obtain:
A. A criminal conviction against the contractor.

,B. ✓ A final court judgment or arbitration award against the contractor.
C. A letter from the Better Business Bureau.
D. An estimate from another contractor for the repair cost.

12. A contractor's license must be displayed:
A. Only at the contractor's primary office.
B. On the dashboard of all company vehicles.
C. ✓ Prominently in all places of business and in all advertisements.
D. It does not need to be displayed.

13. Advertising by a licensed contractor must always include:
A. The owner's personal cell phone number.
B. ✓ The contractor's MHIC license number.
C. A list of all past clients.
D. A guaranteed completion date.

14. Which of the following would be considered an "unfair or deceptive trade practice" under
MHIL?
A. ✓ Abandoning a project without justification after receiving payment.
B. Subcontracting a portion of the work.
C. Ordering materials after the contract is signed.
D. Using a standard form contract.

15. A contractor may legally require a down payment before starting work. What is the
MAXIMUM down payment allowed by MHIC regulation?
A. 10% of the contract price
B. ✓ 1/3 of the contract price
C. 50% of the contract price
D. There is no statutory limit.

16. A contract is considered "financed" if the consumer signs:
A. Any contract over $5,000.
B. A contract with a payment schedule.
C. ✓ A promissory note or other evidence of indebtedness.
D. A contract that includes labor and materials.

17. The "Mechanic's Lien" law in Maryland is designed to protect:
A. Homeowners from contractor disputes.
B. ✓ Contractors and suppliers who provide labor or materials but are not paid.

, C. Banks holding mortgages on the property.
D. Local governments for unpaid taxes.

18. Before recording a mechanic's lien, a contractor must generally provide the homeowner
with a:
A. Notice of Intent to Lien.
B. Copy of all supplier invoices.
C. ✓ A "Notice of Right to Claim Lien" at the time of contract signing.
D. A final warning 48 hours prior.

19. Which entity enforces building codes for safety and zoning at the local level in Maryland?
A. MHIC
B. Maryland Department of Labor
C. ✓ County or City government
D. Federal Trade Commission

20. A permit is typically required for which type of work?
A. Painting interior walls.
B. ✓ Installing a new electrical circuit.
C. Replacing a faucet.
D. Installing vinyl flooring.

21. Who is ultimately responsible for obtaining necessary building permits for a home
improvement project?
A. The property owner, always.
B. The architect or designer.
C. ✓ The contractor, unless the contract explicitly states otherwise.
D. The subcontractor performing the work.

22. OSHA regulations primarily concern:
A. Consumer billing practices.
B. ✓ Workplace safety and health for employees.
C. Contractor licensing requirements.
D. Homeowner insurance.

23. A "competent person" on a job site, as defined by OSHA, is someone who:
A. Has a college degree in engineering.
B. ✓ Is capable of identifying hazards and has authority to correct them.
C. Has worked in construction for 5 years.
D. Is the property owner.

Document information

Uploaded on
December 1, 2025
Number of pages
64
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.59

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BRAVOSTUVIA
4.1
(13)
Sold
85
Followers
3
Items
3445
Last sold
3 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions