Study online at https://quizlet.com/_7b2b4i
1. WASTEWATER FORCE MAIN D. 150
PRESSURE RATING IS.
A. 75
B. 100
C. 125
D. 150
E. 200
2. THE MOST CRITICAL FACTORS E. CHOICE OF PIPE BEDDING
OF THE FINAL GRADE OF A
GRAVITY WASTEWATER PIPE
SHOULD BE?
A. ALIGNMENT
B. CHOICE OF PIPE MATERI-
ALS
C. CHOICE OF LEVELING
EQUIPMENT
D. CHOICE OF EXCAVATING
EQUIPMENT
E. CHOICE OF PIPE BEDDING
3. SETTING GOALS WORKS BEST C. DEVELOPED BY EMPLOYEE
WHEN?
A. ACCOMPANIED BY AN AC-
TION PLAN
B. DEVELOPED BY MANAGER
C. DEVELOPED BY EMPLOYEE
4. PARTICIPATORY MANAGE- B. BE A MEMBER INSTEAD OF A BOSS
MENT MEANS?
, WASTEWATER COLLECTIONS III
Study online at https://quizlet.com/_7b2b4i
A. LISTEN TO IDEAS AND THEN
TAKE OVER
B. BE A MEMBER INSTEAD OF
A BOSS
5. CLASS III COLLECTION SYS- C. 1,000,000. Category III COLLECTION SYSTEM OVER 1 MGD
TEM LICENSE OR CLASS REQUIRES CLASS III OR B LICENSE.
B WASTEWATER TREATMENT
PLANT OPERATOR LICENSE
IS REQUIRED FOR AT LEAST
SUPERVISOR OF CONSTRUC-
TION AND MAINTENANCE
CREWS IN WASTEWATER SYS-
TEMS WITH AVERAGE FLOW
GREATER THAN?
A. 100,000
B. 500,000
C. 1,000,000
6. IF WASTEWATER TREATMENT A. NEW COMPANY MUST IMMEDIATELY APPLY FOR A NEW CER-
OPERATING COMPANY CEAS- TIFICATION
ES OPERATION AND ANOTHER
ONE TAKES OVER FROM THEM (Is probably the correct answer)
WHICH IS TRUE?
OPERATIONS COMPANY ARE NOT TRANSFERABLE.
A. NEW COMPANY MUST IM- EVERY WW SYSTEM OPERATIONS CO. MUST HOLD A VALID CER-
MEDIATELY APPLY FOR A NEW TIFICATE OF REGISTRATION
CERTIFICATION.
B. NEW COMPANY MUST NO-
TIFY TNRCC WITHIN 30 DAYS
C. OPERATORS CAN CONTIN-