The 1970's law that set into place the regulation of stormwater is:
Ans: — The Clean Water Act
Requirements for managing stormwater activity on a construction
site are outlined in the following regulation: Ans: — NPDES
Which of the following is never an allowable stormwater discharge
from a construction site? Ans: — Discharge from contaminated
groundwater
The Notice of termination can filed when: Ans: — All construction
activity, inside and outside the building, is complete and
permanent stabilization verified
Relative to stormwater permitting, all of the following must occur
before construction starts except: Ans: — Submit the notice of
termination (NOT)
Which erosion control best mgmt practice increases water
infiltration, dissipates rainfall energy and slows overland flow of
stormwater Ans: — Vegetation
Of the following factors that influence erosion rates, the one a
contractor has the most control over is: Ans: — Groundcover
Temporary stabilization should be implemented Ans: —
Immediately on all disturbed areas that are likely to or will remain
inactive for 14-days or more
The Primary purpose of a construction exit is Ans: — To remove
sediment from construction site vehicles and minimize trackout
Common types of erosion include all of the following except Ans:
— Sedimentation
Which of the following is NOT a beneficial use of water? Ans: —
Flushing a spill down a storm drain