100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

CCCA Domain 1 Complete Study Guide 2025/ 2026 with Practice Questions and Verified Solutions

Rating
-
Sold
37
Pages
17
Grade
A+
Uploaded on
24-11-2025
Written in
2025/2026

CCCA Domain 1 Complete Study Guide 2025/ 2026 with Practice Questions and Verified Solutions

Institution
CCCA - Certified Construction Contract Administrator
Course
CCCA - Certified Construction Contract Administrator










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CCCA - Certified Construction Contract Administrator
Course
CCCA - Certified Construction Contract Administrator

Document information

Uploaded on
November 24, 2025
Number of pages
17
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Terms in this set (83)


Submittals that require a responsive action by the
Designated Owner Representative (DOR).
Action Submittals


Considerations regarding the visual appeal of the
Aesthetic concerns building.




Pre-determined amounts set aside for specific
Allowances items in the contract.

Options that can be added or removed from the
Alternates contract.

, False.
Are bonds considered
insurance?


Coordination drawings are not always considered
Are coordination Contract Documents.
drawings considered
Contract Documents?


As builts The term 'as builts' is never used by CSI.

True.
Can contractors seek
additional contract time
for incomplete
submittals?

False.
Can submittals be used
by the contractor to
modify the contract?

, Documents that verify compliance with specific
Certifications standards or requirements.

Modifications to the contract that may affect the
Change Orders contract sum.

Includes maintenance agreements, O&M data,
bonds, special extended warranties, record
documents, spare parts & attic stock, sustainable
Closeout and closeout docs, software, and keying.
maintenance submittals



Developed and maintained by the contractor.
Construction progress
schedule

Define the proposed construction known as 'The
Contract Documents Work'.

Changes made to the original contract documents,
Contract Modifications often requiring formal approval.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
LibraGuide Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
3800
Member since
1 year
Number of followers
12
Documents
889
Last sold
2 hours ago

4.9

338 reviews

5
305
4
23
3
7
2
1
1
2

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions