100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

MISY 5340 EXAM 2 QUESTIONS WITH VERIFIED SOLUTIONS GRADED A+

Rating
-
Sold
-
Pages
28
Grade
A+
Uploaded on
20-11-2025
Written in
2025/2026

MISY 5340 EXAM 2 QUESTIONS WITH VERIFIED SOLUTIONS GRADED A+ Which of the following are key organizational data relevant to the production process? a. company code b. credit control area c. client d. storage location e. plant - Answers company code client storage location plant The master data relevant to the production process are: a. work center b. material master c. bill of material d. client e. company code - Answers work center material master bill of material What are the basic time elements in the production process? a. setup time b. alternate time c. build time d. teardown time e. processing time - Answers setup time teardown time processing time Which of the following can be included in processing time? a. machine time b. configuring work center c. configuring equipment d. labor time e. setup time - Answers machine time labor time Which of the following are the general classifications of time elements in production? a. floating b. volatile c. fixed d. explosive e. variable - Answers fixed variable The material master is grouped into different views or segments based on which factors? a. processes that use the materials b. material type c. organizational level d. material composition e. material description - Answers processes that use the material material type organizational level A planned order is a formal request that indicates: a. how many units of a product are needed b. where the finished goods are to be shipped c. what materials are needed d. where the raw materials are stored e. when the materials are needed - Answers how many units of a product are needed what materials are needed when the materials are needed What are the organizational data that are included in a planned order? a. client b. company code c. plant d. storage location e. bill of materials - Answers client company code plant storage location Which are the following are options when a production manager receives a planned order? a. create an alternate planned order b. reject the planned order c. combine the planned order with other orders

Show more Read less
Institution
MISY 5340
Course
MISY 5340










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
MISY 5340
Course
MISY 5340

Document information

Uploaded on
November 20, 2025
Number of pages
28
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

MISY 5340 EXAM 2 QUESTIONS WITH VERIFIED SOLUTIONS GRADED A+

Which of the following are key organizational data relevant to the production process?



a. company code

b. credit control area

c. client

d. storage location

e. plant - Answers company code

client

storage location

plant

The master data relevant to the production process are:



a. work center

b. material master

c. bill of material

d. client

e. company code - Answers work center

material master

bill of material

What are the basic time elements in the production process?



a. setup time

b. alternate time

c. build time

,d. teardown time

e. processing time - Answers setup time

teardown time

processing time

Which of the following can be included in processing time?



a. machine time

b. configuring work center

c. configuring equipment

d. labor time

e. setup time - Answers machine time

labor time

Which of the following are the general classifications of time elements in production?



a. floating

b. volatile

c. fixed

d. explosive

e. variable - Answers fixed

variable

The material master is grouped into different views or segments based on which factors?



a. processes that use the materials

b. material type

c. organizational level

, d. material composition

e. material description - Answers processes that use the material

material type

organizational level

A planned order is a formal request that indicates:



a. how many units of a product are needed

b. where the finished goods are to be shipped

c. what materials are needed

d. where the raw materials are stored

e. when the materials are needed - Answers how many units of a product are needed

what materials are needed

when the materials are needed

What are the organizational data that are included in a planned order?



a. client

b. company code

c. plant

d. storage location

e. bill of materials - Answers client

company code

plant

storage location

Which are the following are options when a production manager receives a planned order?

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TutorJosh Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
343
Member since
1 year
Number of followers
16
Documents
28801
Last sold
3 days ago
Tutor Joshua

Here You will find all Documents and Package Deals Offered By Tutor Joshua.

3.6

53 reviews

5
18
4
14
3
12
2
0
1
9

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions