Zoning ordinances place a number of restrictions on a project.
Which of the following would NOT be covered by zoning
ordinances?
a. The minimum design loads that must be used to size the
building frame and the frame foundations
b. the number of parking spaces that must be provided
c.How far the building must be set back from the lot lines
d. the type of building that can be placed on the site
e. how much of the lot may be covered by the building - THE
CORRECT ANSWER-a
Which of the following is NOT a valid level of certification for a
LEED project?
a. Silver
b. Gold
c. Bronze
d. Platinum
e. Certified - THE CORRECT ANSWER-c
,Soil particles which usually possesses some cohesion and
plasticity are__
a. Gravel
b. Sand
c. Silt
d. Cobbles
e. None of the above - THE CORRECT ANSWER-e
Soil particles which range from #4 sieve down to #200 sieve are
classified as
a. cobbles
b. gravel
c. sand
d. silt
e. clay - THE CORRECT ANSWER-c
Which of the following contains regulations that were designed
specifically to ensure safe working conditions on the jobsite?
a. ADA
b. state building code
c. municipal zoning ordinances
d. OSHA
e. LEED - THE CORRECT ANSWER-d
, A soil described as a plastic clay with a trace of sand would be
considered a granular soil - THE CORRECT ANSWER-T
The blow counts recorded on boring logs are used to determine
the consistency (density) of the soil below grade. - THE CORRECT
ANSWER-T
A soil with a high content of silt and clay would be a good
material to use as fill below a slab because it would exhibit good
drainage - THE CORRECT ANSWER-F
Current building codes require that all new buildings achieve
some level of LEED certification - THE CORRECT ANSWER-F
The purpose of pre-construction environmental assessment is
to determine if any contamination is present in existing
buildings or in the underlying soil - THE CORRECT ANSWER-T
According to the international building code, a building with an
occupancy group of F-1 and a construction type IB can have an
unlimited number of stories and an unlimited area per story -
THE CORRECT ANSWER-F
Sheepsfoot rollers work better than vibratory rollers for
compacting cohesive soils - THE CORRECT ANSWER-T
Heavy construction projects are also reffered to as horizontal
construction projects - THE CORRECT ANSWER-T