VA DEQ ESC INSPECTOR EXAM QUESTIONS
WITH CORRECT ANSWERS GRADED A+ FOR
2025-2026 ASSURED EXCEL!!
VESCPs-ssCORRECTsANSWERSVirginiasErosionsandsSedimentsControlsProgram
-sAdministeredsbyscounties/citiess(must),stownss(may)
-sMUSTsBEsAPPROVED
MinimumsStandards1s-ssCORRECTsANSWERSStabilization
permanentsorstemporaryssoilsstabilizationsshallsbesappliedstosdenudedsareasswithinssevensdayssaft
ersfinalsgradesissreachedsonsanysportionsofsthessite;stemporaryssoilsstabilizationsshallsbesappliedswit
hinssevensdaysstosdenudedsareassthatsmaysnotsbesatsfinalsgradesbutswillsremainsdormantsforslongers
thans14sdays;spermanentsstabilizationsshallsbesappliedstosareassthatsarestosbesleftsdormantsforsmor
esthansonesyear
SitesNOTsatsFinalsGrades-ssCORRECTsANSWERS-sstabilizesins14sdays
-stemporarilysseed
-smulch
-spermanentlysstabilizesifsdormants>s1syear
SitesatsFinalsGrades-ssCORRECTsANSWERS-sstabilizesins7sdayss(recommendedsimmediately)
-spermanentlysorstemporarilysseedsandsmulch
-smulch/matting/straw
MinimumsStandards2s-ssCORRECTsANSWERSStocksPiles,sWastesandsBorrowsAreas
,duringsconstruction,ssoilsstockspilessandsborrowsareassshallsbesstabilizedsorsprotectedswithssedime
ntstrappingsmeasures
mulchspreventsserosionsbysprotectingsthessurfacesfromsraindropsimpactsandssiltsfencesinterceptssa
ndsdetainssfromsdisturbedsareas
MinimumsStandards3s-ssCORRECTsANSWERSPermanentsVegetation
permanentsvegetationscoversshallsbesestablishedsonsdenudedsareassnotsotherwisespermanentlysst
abilizeds(permanentsvegetationsshallsnotsbesconsideredsestablishedsuntilsasgroundscoversissachieve
dsthatsissuniform,smaturesenoughstossurvive,sandswillsinhibitserosions*theresissnos%sassociatedswiths
this*)s
reduceserosionsandsdecreasessedimentsyieldsfromsdisturbedsarea
thississthesstandardsusedstosverifysthatsassitesissreadysforsreleasesofsbondssorssurety
MinimumsStandards4s-ssCORRECTsANSWERSFirst-StepsMeasures
Sedimentsbasinssandstraps,sperimetersdikes,ssedimentsbarrierssandsothersmeasuressintendedstostra
pssedimentsshallsbesconstructedsassasfirstsstepsinsanysland-
disturbingsactivitysandsshallsbesmadesfunctionalsbeforesupslopeslandsdisturbancestakessplace
ascertainsamountsofsinitialslandsdisturbancesmaysbesrequiredstosprovidesaccesssforsequipmentstosin
stallsthesperimeterscontrols,sbutssitesclearingsandsgradingsshouldsbeskeptstosasminimumsuntilsthespe
rimeterscontrolssaresinsplace
,interceptssandsdetainsssmallsamountssofssedimentsfromsdisturbedsareassduringsconstructionsopera
tionstospreventssedimentsfromsleavingsthessitesandsdecreasesvelocitysofssheetsflowssandslow-to-
moderateslevelschannelsflow
PerimetersControlss-
ssCORRECTsANSWERSassuressthatssedimentsdoessnotsleavesthesperimetersofsthesland-
disturbingsareasoncessitesclearing,sgrading,sandsconstructionscommences
Examples:ssiltsfences,ssedimentstraps,ssedimentsbasins,sconstructionsentrance,stemporarysdiversio
ns,sdiversions
MinimumsStandards5s-ssCORRECTsANSWERSEarthensStructuresStabilization
stabilizationsmeasuressshallsbesappliedstosearthensstructuresssuchsassdams,sdikes,sandsdiversionssi
mmediatelysaftersinstallation
reduceserosionsandssedimentationsandsreducesdamagesfromssedimentsandsrunoffstosdownstreams
orsoff-sitesareas
MinimumsStandards6s-ssCORRECTsANSWERSTrapssandsBasins
sedimentstrapssandsbasinssshallsbesdesignedsandsconstructedsbasedsuponsthestotalsdrainagesareas(
notsjustsdisturbedsarea)stosbesservedsbysthestrapsorsbasin
SedimentsTrapss-
ssCORRECTsANSWERSminimumsstoragescapacitysshallsbes134scubicsyardsspersacresofsdrainagesareas
andsshallsonlyscontrolsdrainagesareasslesssthans3sacres
*stonesoutlets=strap*
, SedimentsBasinss-
ssCORRECTsANSWERSsurfacesrunoffsfromsdisturbedsareassthatsisscomprisedsofsflowsfromsdrainagesa
reassgreatersthansorsequalstos3sacressshallsbescontrolledsbysasbasin;sminimumsstoragescapacitysofsas
sedimentsbasinsshallsbes134scubicsyardsspersacresofsdrainagesarea;sthesoutfallssystemsshall,satsasmin
imum,smaintainsthesstructuralsintegritysofsthesbasinsduringsas25-yearsstormsofs24-
hoursduration;srunoffscoefficientssusedsinsrunoffscalculationssshallscorrespondstosasbaresearthscond
itionsorsthosesconditionssexpectedstosexistswhilesthessedimentsbasinsissutilized.
SedimentsTrappingsDevisess-
ssCORRECTsANSWERS1.splacesnearstheslowestsdrainagespointssofsasproject
2.sinstallsassasfirst-stepsmeasures[MS-4]
3.sstabilizesimmediatelys[MS-5]
4.smustsincludesoutletsprotectionsforsbasinss[MS-11]
MinimumsStandards7s-ssCORRECTsANSWERSCutsandsFillsSlopes
rougheningsthessurfacesofsthesslopesdecreasessrunoff,slowerssthesvelocitysrunoff,sincreasesswatersr
etention,sandsleadsstosbettersseedsgermination
slopessthatsaresfoundstosbeserodingsexcessivelyswithinsonsyearsofspermanentsstabilizationsshallsbesp
rovidedswithsadditionalsslopsstabilizingsmeasuressuntilsthesproblemsisscorrected
MinimumsStandards8s-ssCORRECTsANSWERSConcentratedsRunoff
WITH CORRECT ANSWERS GRADED A+ FOR
2025-2026 ASSURED EXCEL!!
VESCPs-ssCORRECTsANSWERSVirginiasErosionsandsSedimentsControlsProgram
-sAdministeredsbyscounties/citiess(must),stownss(may)
-sMUSTsBEsAPPROVED
MinimumsStandards1s-ssCORRECTsANSWERSStabilization
permanentsorstemporaryssoilsstabilizationsshallsbesappliedstosdenudedsareasswithinssevensdayssaft
ersfinalsgradesissreachedsonsanysportionsofsthessite;stemporaryssoilsstabilizationsshallsbesappliedswit
hinssevensdaysstosdenudedsareassthatsmaysnotsbesatsfinalsgradesbutswillsremainsdormantsforslongers
thans14sdays;spermanentsstabilizationsshallsbesappliedstosareassthatsarestosbesleftsdormantsforsmor
esthansonesyear
SitesNOTsatsFinalsGrades-ssCORRECTsANSWERS-sstabilizesins14sdays
-stemporarilysseed
-smulch
-spermanentlysstabilizesifsdormants>s1syear
SitesatsFinalsGrades-ssCORRECTsANSWERS-sstabilizesins7sdayss(recommendedsimmediately)
-spermanentlysorstemporarilysseedsandsmulch
-smulch/matting/straw
MinimumsStandards2s-ssCORRECTsANSWERSStocksPiles,sWastesandsBorrowsAreas
,duringsconstruction,ssoilsstockspilessandsborrowsareassshallsbesstabilizedsorsprotectedswithssedime
ntstrappingsmeasures
mulchspreventsserosionsbysprotectingsthessurfacesfromsraindropsimpactsandssiltsfencesinterceptssa
ndsdetainssfromsdisturbedsareas
MinimumsStandards3s-ssCORRECTsANSWERSPermanentsVegetation
permanentsvegetationscoversshallsbesestablishedsonsdenudedsareassnotsotherwisespermanentlysst
abilizeds(permanentsvegetationsshallsnotsbesconsideredsestablishedsuntilsasgroundscoversissachieve
dsthatsissuniform,smaturesenoughstossurvive,sandswillsinhibitserosions*theresissnos%sassociatedswiths
this*)s
reduceserosionsandsdecreasessedimentsyieldsfromsdisturbedsarea
thississthesstandardsusedstosverifysthatsassitesissreadysforsreleasesofsbondssorssurety
MinimumsStandards4s-ssCORRECTsANSWERSFirst-StepsMeasures
Sedimentsbasinssandstraps,sperimetersdikes,ssedimentsbarrierssandsothersmeasuressintendedstostra
pssedimentsshallsbesconstructedsassasfirstsstepsinsanysland-
disturbingsactivitysandsshallsbesmadesfunctionalsbeforesupslopeslandsdisturbancestakessplace
ascertainsamountsofsinitialslandsdisturbancesmaysbesrequiredstosprovidesaccesssforsequipmentstosin
stallsthesperimeterscontrols,sbutssitesclearingsandsgradingsshouldsbeskeptstosasminimumsuntilsthespe
rimeterscontrolssaresinsplace
,interceptssandsdetainsssmallsamountssofssedimentsfromsdisturbedsareassduringsconstructionsopera
tionstospreventssedimentsfromsleavingsthessitesandsdecreasesvelocitysofssheetsflowssandslow-to-
moderateslevelschannelsflow
PerimetersControlss-
ssCORRECTsANSWERSassuressthatssedimentsdoessnotsleavesthesperimetersofsthesland-
disturbingsareasoncessitesclearing,sgrading,sandsconstructionscommences
Examples:ssiltsfences,ssedimentstraps,ssedimentsbasins,sconstructionsentrance,stemporarysdiversio
ns,sdiversions
MinimumsStandards5s-ssCORRECTsANSWERSEarthensStructuresStabilization
stabilizationsmeasuressshallsbesappliedstosearthensstructuresssuchsassdams,sdikes,sandsdiversionssi
mmediatelysaftersinstallation
reduceserosionsandssedimentationsandsreducesdamagesfromssedimentsandsrunoffstosdownstreams
orsoff-sitesareas
MinimumsStandards6s-ssCORRECTsANSWERSTrapssandsBasins
sedimentstrapssandsbasinssshallsbesdesignedsandsconstructedsbasedsuponsthestotalsdrainagesareas(
notsjustsdisturbedsarea)stosbesservedsbysthestrapsorsbasin
SedimentsTrapss-
ssCORRECTsANSWERSminimumsstoragescapacitysshallsbes134scubicsyardsspersacresofsdrainagesareas
andsshallsonlyscontrolsdrainagesareasslesssthans3sacres
*stonesoutlets=strap*
, SedimentsBasinss-
ssCORRECTsANSWERSsurfacesrunoffsfromsdisturbedsareassthatsisscomprisedsofsflowsfromsdrainagesa
reassgreatersthansorsequalstos3sacressshallsbescontrolledsbysasbasin;sminimumsstoragescapacitysofsas
sedimentsbasinsshallsbes134scubicsyardsspersacresofsdrainagesarea;sthesoutfallssystemsshall,satsasmin
imum,smaintainsthesstructuralsintegritysofsthesbasinsduringsas25-yearsstormsofs24-
hoursduration;srunoffscoefficientssusedsinsrunoffscalculationssshallscorrespondstosasbaresearthscond
itionsorsthosesconditionssexpectedstosexistswhilesthessedimentsbasinsissutilized.
SedimentsTrappingsDevisess-
ssCORRECTsANSWERS1.splacesnearstheslowestsdrainagespointssofsasproject
2.sinstallsassasfirst-stepsmeasures[MS-4]
3.sstabilizesimmediatelys[MS-5]
4.smustsincludesoutletsprotectionsforsbasinss[MS-11]
MinimumsStandards7s-ssCORRECTsANSWERSCutsandsFillsSlopes
rougheningsthessurfacesofsthesslopesdecreasessrunoff,slowerssthesvelocitysrunoff,sincreasesswatersr
etention,sandsleadsstosbettersseedsgermination
slopessthatsaresfoundstosbeserodingsexcessivelyswithinsonsyearsofspermanentsstabilizationsshallsbesp
rovidedswithsadditionalsslopsstabilizingsmeasuressuntilsthesproblemsisscorrected
MinimumsStandards8s-ssCORRECTsANSWERSConcentratedsRunoff