100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

FLS EXAMINATION / RECENT VERSION WITH WELL-DETAILED QUESTIONS AND RELIABLE ANSWERS / GUARANTEED PASS / ALREADY GRADED A+

Rating
-
Sold
-
Pages
11
Grade
A+
Uploaded on
18-11-2025
Written in
2025/2026

FLS EXAMINATION / RECENT VERSION WITH WELL-DETAILED QUESTIONS AND RELIABLE ANSWERS / GUARANTEED PASS / ALREADY GRADED A+

Institution
Course









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Course

Document information

Uploaded on
November 18, 2025
Number of pages
11
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

ECCC GE Exam / 2025-2026 Version Well-Detailed
Questions and Reliable Answers from Verified
Recourses / Graded A+

USACE Response Options
Forward Engineer Support Team-Advance (FEST-A) or
Reconnaissance Team (RT)
Advanced Echelon (ADVON) team
Contingency Engineer District (CED)
Reconnaissance Tasks
Technical Reconnaissance (**General Engineers)
Infrastructure Survey
Environment Assessment
Airfield Assessment
Route Classification
Tactical Reconnaissance (**Combat Engineers)
Bridge Reconnaissance
Route Reconnaissance
Obstacle Reconnaissance
Reconnaissance vs. Classification
Classification is done by General Engineers
Reconnaissance is done by Combat Engineers
SWEAT-MSO
Sewage
Water
Electricity
Academics
Trash
Medical
Safety
Other Considerations
MDMP and Construction Planning

, MDMP nests within construction planning and EN requirements for
sustainment
Project Origin/Routing
Unit requests on a DA4283
Go to DPW for approval
Create list for troop construction requests
S3 syncs with DPW for project
Projects are picked and project packet are given; scope of work, site
plan, and drawings
S3C produces construction directive, BOM, and Construct Activities
Project assigned to executing company
Definable Features of Work
project supervisor identifies features of work during estimating and
scheduling process. "Task which is sperate and distinct from other
tasks, has separate control requirements, and may be identified by
different trades or disciplines, or it may be work by the same trade in
a different environment"
For each definable feature of work
Prep Phase: apply network analysis, scheduling, estimating
Initial Phase: Choosing configuration, materials, equipment
Follow Up Phase: adherence to standard procedures
Completion Phase: (in doctrine - rework phase)
Quality Management (QM)
consists of Quality Assurance and Quality Control activities instituted
to achieve the quality levels established by project plans and
specifications or as directed quality established by the contract
requirements
Quality Control (QC)
engineering unit's system in place during execution to manage,
control, and document the unit's activities in compliance with the
project plans and specifications requirements
Unit QC Plan
unit QC manager and assigned QC specialists perform and direct
activities to execute unit level QC program
Project QC Plan
$28.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
georgemutahi

Get to know the seller

Seller avatar
georgemutahi Oxford University
Follow You need to be logged in order to follow users or courses
Sold
New on Stuvia
Member since
1 month
Number of followers
0
Documents
35
Last sold
-
Premium Exam Resources Hub.

I'm a dedicated academic contributor specializing in high-quality exam guides, study notes, and revision materials. All my documents are carefully organized, easy to understand, and based on verified, up-to-date exam content. My goal is to help students study smarter, save time, and feel confident before their tests. If you’re looking for reliable, clear, and exam-ready materials, you’re in the right place.

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions