CQM-C EXAM (QUESTIONS AND ANSWERS)
(GRADED A+)
1. The purpose of Construction Quality Management is to: - ANSWER: Achieve
the quality established by properly developed requirements through the
combined responsibility, but separate efforts of contractor and government
personnel.
2. Construction Quality Management is the performance of tasks, which ensure that
construction is performed. - ANSWER: According to plans and specifications,
on time, within a defined budget and a safe work environment.
3. Partnering relationships are based upon: - ANSWER: Building trust and
dedication to common goals
4. It is the responsibility of Quality Assurance Personnel to: - ANSWER:
Periodically verify that the contractors system of control is working effectively.
5. An effective contractor quality control program will: - ANSWER: Be an
incentive for work to be done correctly the first time resulting in earlier
completion, reduced field overhead costs, and greater profits.
6. The success or failure of all contractors is based upon: - ANSWER: The ability
to control costs, finance work, estimate jobs, schedule the work, and maintain
effective quality control.
7. Quality Assurance Personnel have the responsibility to: - ANSWER: Require
contractors to maintain the quality specified in the plans and specifications.
8. Inspection is: - ANSWER: The process by which ongoing and completed work
is examined
$%^&*&^%
9. During the punch-out inspection of a project: - ANSWER: Quality Assurance $%^&*(*&
Personnel must assure that the contractor prepares a punch-list and makes ^%$%^&*(
corrections. *&^%$%^&
*()*&^%$%
10. If there is a disagreement whether the contractors work complies with the
^&*(*&^%
contract: - ANSWER: The government makes the final determination
$%^&*(*&
11. Characteristics that describe a definable feature of work include: - ANSWER: ^%$%^&*(
Cross-referenced listings to the contractors construction schedule that may have *&^%$%^&
more than one definable feature under a section of the specifications. *(*&^%$%
^&*(*&^%
$%^&*(*&
^%$%^&*(
*&^%$
(GRADED A+)
1. The purpose of Construction Quality Management is to: - ANSWER: Achieve
the quality established by properly developed requirements through the
combined responsibility, but separate efforts of contractor and government
personnel.
2. Construction Quality Management is the performance of tasks, which ensure that
construction is performed. - ANSWER: According to plans and specifications,
on time, within a defined budget and a safe work environment.
3. Partnering relationships are based upon: - ANSWER: Building trust and
dedication to common goals
4. It is the responsibility of Quality Assurance Personnel to: - ANSWER:
Periodically verify that the contractors system of control is working effectively.
5. An effective contractor quality control program will: - ANSWER: Be an
incentive for work to be done correctly the first time resulting in earlier
completion, reduced field overhead costs, and greater profits.
6. The success or failure of all contractors is based upon: - ANSWER: The ability
to control costs, finance work, estimate jobs, schedule the work, and maintain
effective quality control.
7. Quality Assurance Personnel have the responsibility to: - ANSWER: Require
contractors to maintain the quality specified in the plans and specifications.
8. Inspection is: - ANSWER: The process by which ongoing and completed work
is examined
$%^&*&^%
9. During the punch-out inspection of a project: - ANSWER: Quality Assurance $%^&*(*&
Personnel must assure that the contractor prepares a punch-list and makes ^%$%^&*(
corrections. *&^%$%^&
*()*&^%$%
10. If there is a disagreement whether the contractors work complies with the
^&*(*&^%
contract: - ANSWER: The government makes the final determination
$%^&*(*&
11. Characteristics that describe a definable feature of work include: - ANSWER: ^%$%^&*(
Cross-referenced listings to the contractors construction schedule that may have *&^%$%^&
more than one definable feature under a section of the specifications. *(*&^%$%
^&*(*&^%
$%^&*(*&
^%$%^&*(
*&^%$