QUESTION: The______ can be divided into several layers to indicate the value added at each
level within the company. - ANSWER-Value chain
QUESTION: If data gathered shows process or quality flaws, a company should use ________
format in a Six Sigma project. - ANSWER-DMAIC
QUESTION: What are the three core measures used in throughput accounting? - ANSWER-
Operating expense, investment, and throughput
QUESTION: Design for Six Sigma focuses on _______. - ANSWER-Designing processes that
prevent defects from occurring in the first place.
1 ALL THE BEST CHAMP!!
, Page 2 of 18
QUESTION: ______refers to a systematic technique to determine how a process might fail, the
effects of the failure and possible ways of eliminating and preventing each failure. - ANSWER-
FMEA
QUESTION: When performing an FMEA, listing the ______made about the system and its
compensation is the basis of analysis. - ANSWER-Assumptions
QUESTION: Data in word form is typically called _____ data while data in numeric form is called
_______ data. - ANSWER-Qualitative: quantitative
The Improve phase of the project is where the company hopes to realize a ____________. -
ANSWER-Return on investment
QUESTION: Which of the following is an activity of the team during the Improve phase of the
project? - ANSWER-All of the above
QUESTION: ________is a way of confirming that a chosen solution is the right one so effective
change can be made. - ANSWER-Experimentation
1 ALL THE BEST CHAMP!!
, Page 3 of 18
QUESTION: Once we have the ______, the operator can use them to identify trends and out-of-
control conditions. - ANSWER-Control limits
QUESTION: Plans regarding the future attention needs of a newly completed project would be
covered in the _________ plan. - ANSWER-Response
QUESTION: Sigma comes from statistics and represents the ______ of a measurement based
upon a group of similar occurrences. - ANSWER-Standard deviation
QUESTION: Six Sigma is a management ______ that targets the need to reduce costs and
defects. - ANSWER-Philosophy
QUESTION: The team's efforts in the ______ stage of DMAIC are to produce as many ideas as
possible for a solution. - ANSWER-Improve