Elevator Mechanic Test - Section 2 Questions with
Answers (100% Correct Answers)
In a modernization they plan on moving the controller 30 feet away
which ends up resulting in a voltage drop. What do you do? A) Call
electric company for a step-up transformer, B) Use a bigger wire.—
Answer: B) Use a bigger wire.
If you are cutting something with a power saw, which way does piece
you are cutting face. Up or down?— Answer: Down.
They give you a voltage of 480 on primary and 216 on secondary and a
current. What transformer would you need to order? 1KVA 1to1,
2KVA 2to1, or 3KVA 2to1?— Answer: 2KVA 2to1
Static load test - car drifts down 15 inches in ten minutes with no
noticeable oil leak. Where is the most likely leak?— Answer:
Underground
You need to reset the step level switch on an escalator. Where is it
located? A) top B) bottom C) Both.— Answer: C) Both
© 2025 All rights reserved
, 2
What is needed for a false platform?— Answer: False cars require
spring-loaded safeties held in locked position and barricades and
netting on top, 600-pound capacity. A working platform requires the
governor to be installed, and to be counterbalanced correctly.
3 cars, 12 floors. 3 floors do not get PIs. How many PIs do you
order?— Answer: 27 PIs.
The should you a call button wirting diagram with 3 floors, up and
down with a common and ground wire. How many wires are needed
to wire it?— Answer: No answer noted.
Where would you look for how many fixtures you need for a job?—
Answer: Abstract
What percentage of accidents are alcohol related?— Answer: 75%
What is an ok substitute for a top rail for a barricade? A) 1/4 inch wire
rope, B) 1/4 steel banding, C) 3/16 nylon rope— Answer: A) 1/4 inch
wire rope
What is the tolerance of a barricade?— Answer: 2"