100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Case

Case Solution for IVTL Assessing Project Economic Viability

Rating
-
Sold
1
Pages
15
Grade
A+
Uploaded on
12-11-2025
Written in
2025/2026

Get the IVTL Assessing Project Economic Viability Case Study Solution and Analysis by Alok Kastia | Case ID: 9B19N004 / W19033. We guarantee that this case solution is 100% original, official, and not AI-generated. It is a plagiarism-free, complete, and well-structured solution, perfect for exam preparation, assignments, and research.

Show more Read less
Institution
FINC - Finance
Course
FINC - Finance











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
FINC - Finance
Course
FINC - Finance

Document information

Uploaded on
November 12, 2025
Number of pages
15
Written in
2025/2026
Type
Case
Professor(s)
Mr travis
Grade
A+

Subjects

Content preview

IVTL: ASSESSING PROJECT ECONOMIC VIABILITY

CASE STUDY SOLUTION




e
pl
m
SYNOPSIS

Indus Valley Telecom Ltd. (IVTL) wanted to set up an optical fibre cable (OFC) plant at its subsidiary,
Sa
Cosmic Equipment Company Ltd. (CEC). The general manager of IVTL, Mohit Agarwal, had contracted
an outside consulting agency, which established that the project is technically viable. In January 2016,
Agarwal wanted to conduct a comprehensive economic viability study of the project before he presented
the proposal to IVTL management for approval. He asked Suneel Saxena, finance manager of IVTL, to
n

forecast financial statements for the project from the basic data and then do a comprehensive economic
viability study. Agarwal was wondering whether the project would prove to be economically viable since
tio


the decision to proceed depended on this.
lu




OBJECTIVES
So




• Prepare forecasted financial statements for the project from the basic data to assess its economic viability.
• Evaluate the project based on a comprehensive financial analysis.
• Carry out sensitivity analysis of the project based on key underlying input variables.
• Assess whether the company will be able to raise long-term debt for the project.
• Decide whether the project is economically viable.




The Case Solution Starts From page 5

,ASSIGNMENT QUESTIONS

1. Forecast an income statement and balance sheet for the project from the basic data provided in the case
to assess the project’s economic viability.
2. Conduct a primary evaluation of the project by calculating the net present value (NPV), internal rate of
return (IRR), and debt service coverage ratio (DSCR), and conduct a break-even analysis.
3. Evaluate the project through a complete ratio analysis.




e
4. Carry out a sensitivity analysis of the project based on the key underlying variables.




pl
5. Comment on the financial feasibility of the project.
6. Will the company be able to raise long-term debt from a bank, as envisaged in the project?



m
7. Is the project economically viable? Should IVTL go ahead with it?
Sa
n
tio
lu
So




The Case Solution Starts From page 5

,ANALYSIS

1. Forecast an income statement and balance sheet for the project from the basic data provided
in the case to assess the project’s economic viability.

The income statement and the balance sheet have to be forecasted for the next five years, the economic life
of the project.

.


Schedule TN-I

The production quantity can be ascertained based on the installed capacity (see case Exhibit 3) and capacity
utilization. The closing quantity of stocks the company intends to keep can be calculated as follows:




e
 [(No. of Days of Finished Goods (FG) and Work in Progress (WIP)) ÷ 365] × Production Quantity




pl
The quantity available for sale (Production + Opening Stock of FG and WIP − Closing Stock of FG and WIP)
has to be multiplied by average price realization (see “The Project” in the case) to get the sales revenue.



m
Sa
Schedule TN-II

Raw-material consumption is based on sales revenue (Schedule TN-I). All the other variable costs can be
n
tio
lu
So




The Case Solution Starts From page 5

, EXHIBIT -1: RISK MITIGATION STRATEGIES

Key Risks Risk Mitigation Strategies
Time Overrun The plant would be setup in the existing building with some modifications, which
would save a great deal of time. The machinery is easily available from reputed
suppliers, both internationally and within India.
Cost Overrun A contingency of 5% has been considered on fixed assets as part of the project
cost to cover any cost escalation.
Threat of New




e
pl
m
Sa
n
tio
lu
So




The Case Solution Starts From page 5

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
CMSolutions Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
91
Member since
1 year
Number of followers
1
Documents
1093
Last sold
15 hours ago
The Case Master Solutions

Welcome to The Case Master Solutions — your trusted source for discounted Case Study Solutions & Analysis. We assure you that all case solutions provided are authentic, official, and not AI-generated. Our solutions are reliable and crafted to support academic success. We are dedicated to helping students by offering a wide range of high-quality case solutions and analysis at unbeatable prices. Enjoy instant access to all purchases for immediate study, backed by exceptional customer support and a strong commitment to affordability. Thank you for choosing us as your partner in education.

Read more Read less
3.5

13 reviews

5
6
4
3
3
0
2
0
1
4

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions