NATE AC SERVICE CERTIFICATION ACTUAL
QUESTIONS AND CORRECT ANSWERS
ABsystemBisBsuppliedBfromBtheBfactoryBwithBchargeBofB5BpoundsB10BouncesBforBaB15BfootBlineBset.BT
heBlineBsetBisB25BfeetBlong.BTheBmanufacturer'sBinstructionBsheetBspecifiesB0.6BouncesBofBrefrigerat
ionBtoBbeBaddedBforBeachBaddedBfootBofBrefrigerantBlineBsetBlength.BWhatBisBtheBtotalBrefrigerantBc
hargeBforBtheBsystem?
A.B6Bounces
B.B5Bpounds
C.B5BpoundsB10Bounces
D.B6BpoundsB-BCORRECTBANSWER-D.B6BpoundsB
15ftB-B25ftB=B10ftBxB.6B=B6Bounces
5BpoundsB+B10BouncesB+B6Bounces
5BpoundsB+B16BouncesB=B6Bpounds
TheBpurposeBofBusingBfluxBwhenBsolderingBisBto:
A.BannealBtheBsurface.
B.BgiveBbetterBheatBflow.
C.BreduceBoxidation.
D.Bpre-sealBtheBoxidation.B-BCORRECTBANSWER-C.BreduceBoxidation.
OutdoorBcondensingBunitsBthatBareBinstalledBinBareasBwhereBfloodingBisBpossibleBmust:
A.BbeBmountedBaboveBfloodBlevel.
B.ButilizeBNEMAB1Benclosures.
,C.BbeBmountedBunderBanBoverhangingBeave.
D.BuseBwaterBresistantBcomponents.B-BCORRECTBANSWER-A.BbeBmountedBaboveBfloodBlevel.
TheBcomponentBusedBtoBreduceBsoundBtransmissionBandBpreventBwaterBleaksBonBaBrooftopBairBcon
ditionerBpackagedBunitBinstallationBisBthe:
A.BcurbBgasket.
B.BsiliconeBcaulk.
C.BroofBflashing.
D.BroofingBtar.B-BCORRECTBANSWER-A.BcurbBgasket.
ReturnBairBleakageBinBaBhotBatticBwill:
A.BIncreaseBcapacity
B.BDecreaseBcapacity
C.BIncreaseBairflow
D.BDecreaseBairflowB-BCORRECTBANSWER-B.BDecreaseBcapacity
AnBairBconditionerBrefrigerantBcircuitBshouldBbeBevacuatedBtoBaBminimumBof:
A.B0Bmicrons.
B.B200Bmicrons.
C.B500Bmicrons.
D.B1200Bmicrons.B-BCORRECTBANSWER-C.B500Bmicrons.
WhichBofBtheBfollowingBsubstancesBcouldBcreateBanBextremelyBdangerousBconditionBifBusedBtoBche
ckBrefrigerationBsystemBforBleaks?
A.BR-22
B.BNitrogen
C.BOxygen
, D.BCarbonBDioxideB-BCORRECTBANSWER-D.BCarbonBDioxide
TheBsubcoolingBmethodBforBcheckingBchargeBisBgenerallyBusedBonBairBconditionersBwithBwhatBtypeB
ofBmetering?
A.BOnlyBexternallyBequalizedBthermostaticBexpansionBvalves
B.BAnyBthermostaticBexpansionBvalve
C.BPistonBtype
D.BAnyBfixedBmeteringBdeviceB-BCORRECTBANSWER-B.BAnyBthermostaticBexpansionBvalve
SupplyBductsBrunningBthroughBunconditionedBspaceBshouldBbeBinsulatedBandBhave:
A.BequalBfriction.
B.BexcessiveBairBvelocity.
C.BaBvaporBbarrier.
D.BaBtransitionBbacking.B-BCORRECTBANSWER-C.BaBvaporBbarrier.
AnBimportantBconsiderationBwhenBinstallingBaBmotorizedBeconomizerBisBtoBcheckBtoBbeBcertainBtha
t:
A.BtheBvanesBareBsetBforBaBmaximumB10%BoutdoorBair.
B.BtheBvanesBopenBonBanyBcallBforBcooling.
C.BtheBvanesBoperateBwithoutBbinding.
D.BtheBvanesBareBpermanentlyBsetBatB50%.B-BCORRECTBANSWER-
C.BtheBvanesBoperateBwithoutBbinding.
OnBaB3BtonBunitBinstallation,BtheBmeasureBairflowBequalsB1550BCFM.BWhatBdoesBthisBindicate?
A.BProperBbalancing
B.BLowBAirflow
C.BExcessBairflow
QUESTIONS AND CORRECT ANSWERS
ABsystemBisBsuppliedBfromBtheBfactoryBwithBchargeBofB5BpoundsB10BouncesBforBaB15BfootBlineBset.BT
heBlineBsetBisB25BfeetBlong.BTheBmanufacturer'sBinstructionBsheetBspecifiesB0.6BouncesBofBrefrigerat
ionBtoBbeBaddedBforBeachBaddedBfootBofBrefrigerantBlineBsetBlength.BWhatBisBtheBtotalBrefrigerantBc
hargeBforBtheBsystem?
A.B6Bounces
B.B5Bpounds
C.B5BpoundsB10Bounces
D.B6BpoundsB-BCORRECTBANSWER-D.B6BpoundsB
15ftB-B25ftB=B10ftBxB.6B=B6Bounces
5BpoundsB+B10BouncesB+B6Bounces
5BpoundsB+B16BouncesB=B6Bpounds
TheBpurposeBofBusingBfluxBwhenBsolderingBisBto:
A.BannealBtheBsurface.
B.BgiveBbetterBheatBflow.
C.BreduceBoxidation.
D.Bpre-sealBtheBoxidation.B-BCORRECTBANSWER-C.BreduceBoxidation.
OutdoorBcondensingBunitsBthatBareBinstalledBinBareasBwhereBfloodingBisBpossibleBmust:
A.BbeBmountedBaboveBfloodBlevel.
B.ButilizeBNEMAB1Benclosures.
,C.BbeBmountedBunderBanBoverhangingBeave.
D.BuseBwaterBresistantBcomponents.B-BCORRECTBANSWER-A.BbeBmountedBaboveBfloodBlevel.
TheBcomponentBusedBtoBreduceBsoundBtransmissionBandBpreventBwaterBleaksBonBaBrooftopBairBcon
ditionerBpackagedBunitBinstallationBisBthe:
A.BcurbBgasket.
B.BsiliconeBcaulk.
C.BroofBflashing.
D.BroofingBtar.B-BCORRECTBANSWER-A.BcurbBgasket.
ReturnBairBleakageBinBaBhotBatticBwill:
A.BIncreaseBcapacity
B.BDecreaseBcapacity
C.BIncreaseBairflow
D.BDecreaseBairflowB-BCORRECTBANSWER-B.BDecreaseBcapacity
AnBairBconditionerBrefrigerantBcircuitBshouldBbeBevacuatedBtoBaBminimumBof:
A.B0Bmicrons.
B.B200Bmicrons.
C.B500Bmicrons.
D.B1200Bmicrons.B-BCORRECTBANSWER-C.B500Bmicrons.
WhichBofBtheBfollowingBsubstancesBcouldBcreateBanBextremelyBdangerousBconditionBifBusedBtoBche
ckBrefrigerationBsystemBforBleaks?
A.BR-22
B.BNitrogen
C.BOxygen
, D.BCarbonBDioxideB-BCORRECTBANSWER-D.BCarbonBDioxide
TheBsubcoolingBmethodBforBcheckingBchargeBisBgenerallyBusedBonBairBconditionersBwithBwhatBtypeB
ofBmetering?
A.BOnlyBexternallyBequalizedBthermostaticBexpansionBvalves
B.BAnyBthermostaticBexpansionBvalve
C.BPistonBtype
D.BAnyBfixedBmeteringBdeviceB-BCORRECTBANSWER-B.BAnyBthermostaticBexpansionBvalve
SupplyBductsBrunningBthroughBunconditionedBspaceBshouldBbeBinsulatedBandBhave:
A.BequalBfriction.
B.BexcessiveBairBvelocity.
C.BaBvaporBbarrier.
D.BaBtransitionBbacking.B-BCORRECTBANSWER-C.BaBvaporBbarrier.
AnBimportantBconsiderationBwhenBinstallingBaBmotorizedBeconomizerBisBtoBcheckBtoBbeBcertainBtha
t:
A.BtheBvanesBareBsetBforBaBmaximumB10%BoutdoorBair.
B.BtheBvanesBopenBonBanyBcallBforBcooling.
C.BtheBvanesBoperateBwithoutBbinding.
D.BtheBvanesBareBpermanentlyBsetBatB50%.B-BCORRECTBANSWER-
C.BtheBvanesBoperateBwithoutBbinding.
OnBaB3BtonBunitBinstallation,BtheBmeasureBairflowBequalsB1550BCFM.BWhatBdoesBthisBindicate?
A.BProperBbalancing
B.BLowBAirflow
C.BExcessBairflow