100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

AMZL ACADEMY PRACTICE QUESTIONS & ANSWERS

Rating
-
Sold
-
Pages
7
Grade
A+
Uploaded on
11-11-2025
Written in
2025/2026

AMZL ACADEMY PRACTICE QUESTIONS & ANSWERS

Institution
AMZL
Course
AMZL









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
AMZL
Course
AMZL

Document information

Uploaded on
November 11, 2025
Number of pages
7
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

AMZL ACADEMY PRACTICE QUESTIONS & ANSWERS


Standard Work Leadership Checklist (SWLC) compliance requires line items are
marked virtually complete in real time as each task physically executed in station. Why
is it important to update the SWCL in real time rather than waiting to mark all items
complete at the end of your shift?

Checking off the SWLC items in real time helps prevent misses in standard work.



Upon review of Station Command Center (SCC) Area Manager (AM) Reza sees a
linehaul running behind schedule with expected arrival close to the end of the Sort.
Reza calculates remaining Belt Run Time is sufficient to only process 2,000 packages
of the 4,000 manifested for this trailer. Reza decides to push the team to process all of
the volume on the trailer to avoid rolling volume to the next day. This decision is:

Not allowed, because working outside the ops clock could create a ripple effect that
negatively impacts every subsequent shift.



During the Pick and Stage shift a parcel falls off a Pick Cart. An unknown liquid with
strong chemical smell leaks onto the station floor. Which document contains the
procedure to appropriately respond to this hazardous waste spill?

Emergency Action Plan (EAP)



The Sortation shift has just started and the Sort Area Manager, Jason, has begun labor
tracking the associates. Unfortunately, Jason missed labor tracking two associates who
were staffed to pick to buffer. If the expected pick to buffer rate is 300 and the flow rate
is 7800 per hour over a 6.5 hour belt run time, what would be the appropriate headcount
for pick to buffer, and how might the actual rate be impacted if the labor tracking error is
not caught by the end of the shift?

There should be 26 pick to buffer associates, and the actual labor rate would be
artificially inflated to 325

, 5. Kenesha is bridging below standard On Time Dispatch (OTD) performance. Deep
diving Perfect Mile data Kenesha finds 72/148 vans departed late. Review of the
dispatch Chime messages reveals routes positioned at staging locations late for waves
1 through 4. After conducting a STU with the Pick and Stage Area Manager, Kenesha
learns that pickers did not start pick on time because Sort did not finish on time. Review
of the building's Sort shift Chime messages indicates that a late line haul caused
volume to arrive 10 minutes before the end of Sort, and the Sort team decided to extend
Sort in order to get it all processed. What technique is he using to find the root cause of
this miss?

Why



Start up meetings (SUM) are short meetings that are performed at the start of each
shift. Select the TWO standard work tasks related to start up Meetings (SUMs)?

Having a SUM last no longer than 5 minutes

Utilize a start up board with all items from the preshift meeting



Jaiden is an Area Manager meeting new Day 1 Amazon Associates (AAs). Jaiden
ensures that a Learning Ambassador is guiding the Day 1 experience, confirms that the
new Associates have Dolphin permissions, and verifies that timecard punches in and
out for each. What is Jaiden also required to do on an Associate's first day?

Greet Day 1 AAs.



Which of the following best describes the connection between ALPS and INSITE in
regards to UTR capacity planning?

DSMs must review and update plans in ALPS, tag them properly, for the data to be
ingested by INSITE.



While conducting an End of Shift (EOS) Yard Audit you notice a virtual/physical
mismatch. System shows four trailers virtually parked at Dock Doors 102, 104, 105 and
106. Physical inspection of Yard status reveals all four Dock Door parking spots empty.
What are some of the operational impacts of failing to comply with trailer check-out
process Standard Operating Procedure (SOP)?

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Greaterheights Birkbeck, University of London
View profile
Follow You need to be logged in order to follow users or courses
Sold
1126
Member since
3 year
Number of followers
880
Documents
18669
Last sold
1 week ago

4.1

218 reviews

5
120
4
43
3
24
2
10
1
21

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions