100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

Project Management Plan Template (Pre-Project PDF) & Guide

Rating
-
Sold
-
Pages
126
Grade
A
Uploaded on
11-11-2025
Written in
2025/2026

Download our comprehensive Project Management Pre-Project Plan template. This PDF guide includes key sections like scope definition, deliverables, timelines, risk assessment, and stakeholder analysis to successfully initiate your project.

Show more Read less
Institution
Course











Whoops! We can’t load your doc right now. Try again or contact support.

Connected book

Written for

Course

Document information

Uploaded on
November 11, 2025
Number of pages
126
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

1|Page



WGU C722 Project Management Pre-assessment
Actual Exam – Complete 70 Questions and Correct
Verified Answers/ C722 Pre-assessment Test


A project was authorized as an operational necessity to
repair a design flaw in the date field on a computer
system that constrains the year number to two digits
instead of permitting the year to be indicated with four
digits. During execution of the activity concerned with
identifying the affected software, five relevant software
modules were discovered that had not been included in
the scope baseline. The project team must adjust the
baselines to include the omitted scope.


Which change management phase does this scenario
describe?


a) Preparing for the change
b) Managing the change
c) Reinforcing the change
d) Upgrading the change - ...ANSWER...✓✓ a) Preparing
for the change

,2|Page



A general contractor is managing a highway construction
project that will repair a flood-damaged road. The
Department of Transportation offered an incentive fee if
the repairs are completed early. Therefore, the project
manager has established a rewards and recognition
program and has communicated this program to the
project team member. The project's recognition program
will reward project team members who add value by
accelerating the project while maintaining its ability to
deliver the completed scope correctly.


Which change management phase does this scenario
describe?


a) Preparing for the change
b) Managing the change
c) Reinforcing the change
d) Upgrading the change - ...ANSWER...✓✓ c) Reinforcing
the change


A general contractor is managing a construction project
that will add a new conference room to an existing office
building. The project was documented in a fixed-price
contract that specified a completion date. The contract

,3|Page



includes a damages clause imposing a late completion
penalty if the conference room is not ready for use by the
due date. One month into the implementation, the
customer wants to modify the room's lighting equipment.
The requested change will delay the project's critical path
by three months.


Which process should be used to maintain the existing
baseline?


a) Using a change management system to influence
performance
b) Absorbing the change request in the baselines for time
and cost
c) Focusing on the original scope
d) Using the risk management system to process change
requests - ...ANSWER...✓✓ a) Using a change
management system to influence performance


A general contractor from Germany is managing a
construction project in Norway that will add a new
conference room to an existing office building. The project
needs to collect requirements from the client prior to
developing plans to build the new conference room.

, 4|Page




Which two actions would prove useful to plan the
project's quality?


a) Defining traceable and verifiable requirements that can
be validated at project closure
b) Establishing metrics that describe what to measure
and how to measure it
c) Using inventory to protect against defects during
project implementation
d) Changing the work plan to account for the project
experiencing common variation
e) Using slogans and numerical quotas to exhort
resources to work harder - ...ANSWER...✓✓ a & b


a) Defining traceable and verifiable requirements that can
be validated at project closure
b) Establishing metrics that describe what to measure
and how to measure it


What is the name for the closing task where all project
activities are reviewed to determine what went right and
what went wrong?
$30.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
ASCORES

Get to know the seller

Seller avatar
ASCORES Teachme2-tutor
Follow You need to be logged in order to follow users or courses
Sold
1
Member since
1 month
Number of followers
1
Documents
1497
Last sold
1 month ago
A-SCORES

Balancing academic responsibilities with part-time jobs, personal commitments, or other priorities can be overwhelming—I completely understand. That's where I come in to make your life easier! As a dedicated nursing student with a passion for helping peers succeed, I specialize in providing high-quality study resources on stuvia including ATI modules and other essential certifications, earning excellent ratings and a stellar reputation for boosting students' grades. My commitment to excellence ensures that each resource is meticulously crafted to support your academic journey and professional growth in nursing. Join my satisfied buyers and take your studies to the next level with my expertly designed materials. Don’t hesitate to reach out for assistance. My comprehensive study guides, detailed notes, and curated test banks are guaranteed to deliver excellent results. Here’s what you can expect from my offerings: Up-to-date exams and assignments Detailed test banks with verified questions and answers Elaborate exam solutions Case studies and discussions Customized package deals tailored to your needs I’m committed to providing only high-quality documents to ensure the best outcomes. Get instant access to expertly prepared materials designed to help you excel in your academic journey. Reach out today and take a step closer to achieving your goals!

Read more Read less
0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions