Project Management C722, Pre-Assessment QUESTIONS WITH ANSWERS












Whoops! We can’t load your doc right now. Try again or contact support.

Document information

Uploaded on
November 9, 2025
Number of pages
32
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Project Management C722, Pre- |\ |\ |\




Assessment QUESTIONS WITH |\ |\ |\




ANSWERS

A project was authorized as an operational necessity to repair a
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\


design flaw in the date field on a computer system that
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\


constrains the year number to two digits instead of permitting
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\


the year to be indicated with four digits. During execution of the
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\


activity concerned with identifying the affected software, five
|\ |\ |\ |\ |\ |\ |\ |\


relevant software modules were discovered that had not been
|\ |\ |\ |\ |\ |\ |\ |\ |\


included in the scope baseline. The project team must adjust the
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\


baselines to include the omitted scope. |\ |\ |\ |\ |\




Which change management phase does this scenario describe?
|\ |\ |\ |\ |\ |\ |\




a) Preparing for the change
|\ |\ |\ |\




b) Managing the change
|\ |\ |\




c) Reinforcing the change
|\ |\ |\




d) Upgrading the change - CORRECT ANSWERS ✔✔a) Preparing
|\ |\ |\ |\ |\ |\ |\ |\ |\


for the change
|\ |\




A general contractor is managing a highway construction project
|\ |\ |\ |\ |\ |\ |\ |\ |\


that will repair a flood-damaged road. The Department of
|\ |\ |\ |\ |\ |\ |\ |\ |\


Transportation offered an incentive fee if the repairs are |\ |\ |\ |\ |\ |\ |\ |\ |\


completed early. Therefore, the project manager has established
|\ |\ |\ |\ |\ |\ |\ |\


a rewards and recognition program and has communicated this
|\ |\ |\ |\ |\ |\ |\ |\ |\


program to the project team member. The project's recognition
|\ |\ |\ |\ |\ |\ |\ |\ |\

,program will reward project team members who add value by
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\


accelerating the project while maintaining its ability to deliver the |\ |\ |\ |\ |\ |\ |\ |\ |\


completed scope correctly.
|\ |\ |\




Which change management phase does this scenario describe?
|\ |\ |\ |\ |\ |\ |\




a) Preparing for the change
|\ |\ |\ |\




b) Managing the change
|\ |\ |\




c) Reinforcing the change
|\ |\ |\




d) Upgrading the change - CORRECT ANSWERS ✔✔c) Reinforcing
|\ |\ |\ |\ |\ |\ |\ |\ |\


the change |\




A general contractor is managing a construction project that will
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\


add a new conference room to an existing office building. The
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\


project was documented in a fixed-price contract that specified a
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\


completion date. The contract includes a damages clause |\ |\ |\ |\ |\ |\ |\ |\


imposing a late completion penalty if the conference room is not
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\


ready for use by the due date. One month into the
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\


implementation, the customer wants to modify the room's |\ |\ |\ |\ |\ |\ |\ |\


lighting equipment. The requested change will delay the project's
|\ |\ |\ |\ |\ |\ |\ |\


critical path by three months.
|\ |\ |\ |\ |\ |\




Which process should be used to maintain the existing baseline?
|\ |\ |\ |\ |\ |\ |\ |\ |\




a) Using a change management system to influence performance
|\ |\ |\ |\ |\ |\ |\ |\




b) Absorbing the change request in the baselines for time and
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\


cost
c) Focusing on the original scope
|\ |\ |\ |\ |\

,d) Using the risk management system to process change
|\ |\ |\ |\ |\ |\ |\ |\ |\


requests - CORRECT ANSWERS ✔✔a) Using a change
|\ |\ |\ |\ |\ |\ |\ |\


management system to influence performance |\ |\ |\ |\




A general contractor from Germany is managing a construction
|\ |\ |\ |\ |\ |\ |\ |\ |\


project in Norway that will add a new conference room to an
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\


existing office building. The project needs to collect requirements
|\ |\ |\ |\ |\ |\ |\ |\


from the client prior to developing plans to build the new
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\


conference room. |\




Which two actions would prove useful to plan the project's
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\


quality?


a) Defining traceable and verifiable requirements that can be
|\ |\ |\ |\ |\ |\ |\ |\ |\


validated at project closure |\ |\ |\




b) Establishing metrics that describe what to measure and how to
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\


measure it
|\ |\




c) Using inventory to protect against defects during project
|\ |\ |\ |\ |\ |\ |\ |\ |\


implementation
d) Changing the work plan to account for the project
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\


experiencing common variation |\ |\




e) Using slogans and numerical quotas to exhort resources to
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\


work harder - CORRECT ANSWERS ✔✔a & b
|\ |\ |\ |\ |\ |\ |\




a) Defining traceable and verifiable requirements that can be
|\ |\ |\ |\ |\ |\ |\ |\ |\


validated at project closure |\ |\ |\




b) Establishing metrics that describe what to measure and how to
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\


measure it
|\ |\

, What is the name for the closing task where all project activities
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\


are reviewed to determine what went right and what went
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\


wrong?


a) Closeout review
|\ |\




b) Lessons learned review
|\ |\ |\




c) Client deliverables review
|\ |\ |\




d) Project manager review - CORRECT ANSWERS ✔✔b) Lessons
|\ |\ |\ |\ |\ |\ |\ |\ |\


learned review |\




What is another name for lessons learned review that is often
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\


used by the military and other uniformed services?
|\ |\ |\ |\ |\ |\ |\




a) Rules of engagement
|\ |\ |\




b) Activity report
|\ |\




c) Protocol assessment
|\ |\




d) After action report - CORRECT ANSWERS ✔✔d) After action
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\


report


The customer of a project validates that scope has been
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\


completed for the second of three segments of the project.
|\ |\ |\ |\ |\ |\ |\ |\ |\




Which closure practice does this describe?
|\ |\ |\ |\ |\




a) Iteration completion
|\ |\

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EXAMSTUDYPLUG Stanford University
View profile
Follow You need to be logged in order to follow users or courses
Sold
308
Member since
3 year
Number of followers
107
Documents
18112
Last sold
3 days ago
GRADE BUDDY

Welcome to My Page! Are you looking for high-quality study resources to ace your exams or better understand your coursework? You've come to the right place! I'm passionate about sharing my knowledge and helping students succeed academically. Here, you'll find a wide range of well-organized notes, study guides, and helpful materials across various subjects, including Maths ,nursig, Biology, History, etc.. Each resource is carefully crafted with detailed explanations, clear examples, and relevant key points to help simplify complex concepts. Whether you're preparing for a test, reviewing lectures, or need extra support, my resources are designed to make your learning experience smoother and more effective. Let me be a part of your academic journey, and feel free to reach out if you have any questions or need personalized assistance!

Read more Read less
4.5

230 reviews

5
155
4
50
3
13
2
5
1
7

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions